Bpr Builders
- Based in
- San Carlos
- On San Francisco permits
- Sep 2012 to Jan 2025
- Last 24 months
- 2 permits filed
6 permits since 2000: 1 completed, 4 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2025 | In progress issued Feb 2025 | 2146 03rd St | install (n) single sided (6) channel letters illunimated facing street for "levels" for sign aDetails
install (n) single sided (6) channel letters illunimated facing street for "levels" for sign a | $4,500 |
| Dec 11, 2024 | In progress issued Dec 2024 | 2146 03rd St | revision 202312152601- changes to first floor framing due to (e) site conditions: add 3 spread footing for new posts as result of framing modification on level 1Details
revision 202312152601- changes to first floor framing due to (e) site conditions: add 3 spread footing for new posts as result of framing modification on level 1 | |
| Sep 3, 2024 | In progress issued Sep 2024 | 2146 03rd St | revision to 202312152601 adding plumbing fixtures, revising mech equipment & update electrical panel locations. basement lvl: split rm #7, add sinks & move ducts & panels. 1st lul no changes. 2nd lvl" add powder rm.Details
revision to 202312152601 adding plumbing fixtures, revising mech equipment & update electrical panel locations. basement lvl: split rm #7, add sinks & move ducts & panels. 1st lul no changes. 2nd lvl" add powder rm. | |
| Dec 15, 2023 | In progress issued Aug 2024 | 2146 03rd St | ti interior removation of all 3 levels; accessble entry upgrade to commercial space, interior renovation of dwelling unit. sprinkler under separate permitDetails
ti interior removation of all 3 levels; accessble entry upgrade to commercial space, interior renovation of dwelling unit. sprinkler under separate permit | $940,796 |
| Sep 27, 2012 | Completed final sign-off Nov 2012 | 163 02nd St | demo e restroom doors and sink. build new restroom doors, new toilet accessories. build new interior partitions, new casework, new suspended ceiling and new finishes. deferred submittals, mep, life safety, lightingDetails
demo e restroom doors and sink. build new restroom doors, new toilet accessories. build new interior partitions, new casework, new suspended ceiling and new finishes. deferred submittals, mep, life safety, lighting | $40,000 |
| Sep 19, 2012 | Never finaled issued Sep 2012, no final | 163 02nd St | demolition of interior construction. demolish e flooring, (e) interior partitions, (e) casework, portion of (e) suspended ceiling and associated lighting. ti permit will be separateDetails
demolition of interior construction. demolish e flooring, (e) interior partitions, (e) casework, portion of (e) suspended ceiling and associated lighting. ti permit will be separate | $5,000 |