Booth Electric Inc
- Based in
- Petaluma
- On San Francisco permits
- Aug 2023 to Sep 2024
- Last 24 months
- 0 permits filed
7 permits since 2000: 4 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2024 | Completed final sign-off Feb 2025 | 4131 Geary Bl | revision to pa#: 202312062020. change of electrical feed and panel location.Details
revision to pa#: 202312062020. change of electrical feed and panel location. | $5,000 |
| Feb 23, 2024 | In progress filed Feb 2024, not yet issued | 1390 Market St | install (41) ev chargers throughout the parking garage per attached drawings 400 amps.Details
install (41) ev chargers throughout the parking garage per attached drawings 400 amps. | $125,000 |
| Dec 29, 2023 | Expired or cancelled withdrawn Feb 2024 | 1390 Market St | installing (41) level 2 ev chargers, communications equiment and electrical panels from (e) power feeds located in basement of parking garage of buildingDetails
installing (41) level 2 ev chargers, communications equiment and electrical panels from (e) power feeds located in basement of parking garage of building | $125,000 |
| Dec 28, 2023 | In progress issued Dec 2023 | 2190 Ofarrell St | installing 4 level 3 fast chargers, dual stall delivery in indoor parking garage, installing power feeds from existing switchgear in parking garage.Details
installing 4 level 3 fast chargers, dual stall delivery in indoor parking garage, installing power feeds from existing switchgear in parking garage. | $100,000 |
| Dec 7, 2023 | Completed final sign-off Feb 2025 | 2238 Geary Bl | installing (2) level 3 fast charger in indoor parking garage. installing power feeds from existing switchgear in parking garage.Details
installing (2) level 3 fast charger in indoor parking garage. installing power feeds from existing switchgear in parking garage. | $50,000 |
| Dec 6, 2023 | Completed final sign-off Feb 2025 | 4131 Geary Bl | parking area - installing (4) level 2 ev chargers and (1) level 3 fast charger in outdoor parking lot. installing power feeds from (e) switchgear in the basement under outdoor, uncovered parking area.Details
parking area - installing (4) level 2 ev chargers and (1) level 3 fast charger in outdoor parking lot. installing power feeds from (e) switchgear in the basement under outdoor, uncovered parking area. | $100,000 |
| Aug 31, 2023 | Completed final sign-off Oct 2024 | 2130 Ofarrell St | install 20 level 2 ev charging stations thoughout (e) parking structure and installing power feeds from (e) 6 switch gear in parking. details in plans provided.Details
install 20 level 2 ev charging stations thoughout (e) parking structure and installing power feeds from (e) 6 switch gear in parking. details in plans provided. | $150,000 |