Bome Holdings Inc Dba Signature Service
- Based in
- Concord
- On San Francisco permits
- Jul 2023 to Apr 2024
- Last 24 months
- 0 permits filed
5 permits since 2000: 2 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2024 | Completed final sign-off Apr 2024 | 1250 Washington St | rev to pa# 2023-0830-5563; build deck wall to 42" from top of deck fl.Details
rev to pa# 2023-0830-5563; build deck wall to 42" from top of deck fl. | $1,000 |
| Mar 13, 2024 | In progress issued Apr 2024 | 845 Hyde St | install new concrete pad approx 200" long x 42" wide runing (3) electrical lines to panel (common area)Details
install new concrete pad approx 200" long x 42" wide runing (3) electrical lines to panel (common area) | $4,000 |
| Jan 12, 2024 | In progress issued Jan 2024 | 1234 Washington St | common area. work is concurrently with pa 202308305563. after demo of (2) existing wood decks per p202308305563 construct new cast in place concrete foundation wall and provide @ grade drainage along zero property line @ west elevation. install new sump pump and pit @ building entry. scope and cleanDetails
common area. work is concurrently with pa 202308305563. after demo of (2) existing wood decks per p202308305563 construct new cast in place concrete foundation wall and provide @ grade drainage along zero property line @ west elevation. install new sump pump and pit @ building entry. scope and clean | $18,500 |
| Aug 30, 2023 | Completed final sign-off Apr 2024 | 1250 Washington St | remove and install new decks at north and south sides of wall. new decks to have pedestrian coating and sloped to drain. connect deck drain line to main waste line. construct privacy walls for each deck location. remove soil from framing in crawl space. replace decayed structural members as necessarDetails
remove and install new decks at north and south sides of wall. new decks to have pedestrian coating and sloped to drain. connect deck drain line to main waste line. construct privacy walls for each deck location. remove soil from framing in crawl space. replace decayed structural members as necessar | $18,500 |
| Jul 31, 2023 | Never finaled issued Jul 2023, no final | 1901 California St | like for like replacement of two (e) roof decks due to re-roofing, deck one is located on a lower garage roof (pa# 9508700) deck two is on upper bldg roof rebuild pa# 9119650 both comply w/sf bldg code sec 510.10.10. w0rk includes rough finish carpentry and metal flashing.Details
like for like replacement of two (e) roof decks due to re-roofing, deck one is located on a lower garage roof (pa# 9508700) deck two is on upper bldg roof rebuild pa# 9119650 both comply w/sf bldg code sec 510.10.10. w0rk includes rough finish carpentry and metal flashing. | $22,000 |