- 9 permits filed
19 permits since 2000: 15 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2026 | In progress issued Jul 2026 | 2225 23rd St | unit #202: replace floor in living room and kitchen. all work done in kind. hoa requirement.Details
unit #202: replace floor in living room and kitchen. all work done in kind. hoa requirement. | $5,000 |
| Nov 25, 2025 | Completed final sign-off Jan 2026 | 2570 Noriega St | install drywall 5/8" walls and ceilings. install insulation 1230,r13, install ceiling tile/grid. paint and floor installation. all work done in kind. water damageDetails
install drywall 5/8" walls and ceilings. install insulation 1230,r13, install ceiling tile/grid. paint and floor installation. all work done in kind. water damage | $20,000 |
| Nov 12, 2025 | Completed final sign-off Mar 2026 | 2568 Noriega St | 2nd fl common area hallway/bath: install drywall 5/8" ceiling and walls. install insolation r30 & r13. paint & floor installation. all work in kind. water damage.Details
2nd fl common area hallway/bath: install drywall 5/8" ceiling and walls. install insolation r30 & r13. paint & floor installation. all work in kind. water damage. | $20,000 |
| Nov 7, 2025 | Completed final sign-off Feb 2026 | 2562 Noriega St | unit #2560: hang drywall 518" walls and ceiling. install insolation r304 r13 paint, floor installation. all work in kind. water damageDetails
unit #2560: hang drywall 518" walls and ceiling. install insolation r304 r13 paint, floor installation. all work in kind. water damage | $40,000 |
| Nov 7, 2025 | Completed final sign-off Mar 2026 | 2562 Noriega St | unit #203: install drywall 5/8" walls and ceiling. install r30 in ceiling, install ceiling tile/grid. paint & floor installation. common areas: install drywall 5/8" walls & ceiling, install insulation r30 & r13, paint & floor installation. all work in kind. water damage.Details
unit #203: install drywall 5/8" walls and ceiling. install r30 in ceiling, install ceiling tile/grid. paint & floor installation. common areas: install drywall 5/8" walls & ceiling, install insulation r30 & r13, paint & floor installation. all work in kind. water damage. | $30,000 |
| Sep 11, 2025 | Completed final sign-off Nov 2025 | 116 Moffitt St | repair damaged stucco and framing left side of garage door. approx 100 sq ft. like for like repair, street visible. nov 202541914Details
repair damaged stucco and framing left side of garage door. approx 100 sq ft. like for like repair, street visible. nov 202541914 | $15,000 |
| Jul 1, 2025 | Completed final sign-off Jul 2025 | 2040 Franklin St | unit #1003: drywall paint and tile in bathroom. (ceiling drywall repair; wall tiles replace; no other work)Details
unit #1003: drywall paint and tile in bathroom. (ceiling drywall repair; wall tiles replace; no other work) | $5,000 |
| Apr 18, 2025 | Completed final sign-off Feb 2026 | 401 Justin Dr | repair of rain water damage. remove & replace damaged interior wall & ceiling finishes. make opening in wall between dining room & kitchen. remodel kitchenDetails
repair of rain water damage. remove & replace damaged interior wall & ceiling finishes. make opening in wall between dining room & kitchen. remodel kitchen | $140,000 |
| Nov 21, 2024 | Completed final sign-off Feb 2025 | 451 Kansas St | install insulation in ceiling (approx 770sqft) install insulation on exterior walls(250sq) hand drywall- double sheet on ceiling and exyerior walls (approx 3000 sqft) paint unit, install flooe, reset kitchen cabinets and sink, reset light fixtures (closets entry, kitchen, livingroom, laundry room)Details
install insulation in ceiling (approx 770sqft) install insulation on exterior walls(250sq) hand drywall- double sheet on ceiling and exyerior walls (approx 3000 sqft) paint unit, install flooe, reset kitchen cabinets and sink, reset light fixtures (closets entry, kitchen, livingroom, laundry room) | $20,000 |
| May 23, 2024 | Completed final sign-off Jun 2024 | 2375 33rd Av | install insulation in closet wall. install drywall patches in kitchen, living room, bathroom, and closet (walls/ceiling) (approx. 250sf). paint kitchen, living room, bathroom and closet. reset existing kitchen cabinets and kitchen sink. all work done in kind. water damageDetails
install insulation in closet wall. install drywall patches in kitchen, living room, bathroom, and closet (walls/ceiling) (approx. 250sf). paint kitchen, living room, bathroom and closet. reset existing kitchen cabinets and kitchen sink. all work done in kind. water damage | $5,000 |
| May 20, 2024 | Expired or cancelled cancelled May 2024 | 2575 33rd Av | install insulation in closet wall. install drywall in kitchen, living room, bathroom, and closet. paint kitchen, living room, bathroom, and closet. reset existing kitchen cabinets and kitchen sink. all work done in kind. water damage.Details
install insulation in closet wall. install drywall in kitchen, living room, bathroom, and closet. paint kitchen, living room, bathroom, and closet. reset existing kitchen cabinets and kitchen sink. all work done in kind. water damage. | $5,000 |
| Aug 22, 2023 | Completed final sign-off Sep 2023 | 172 06th St | unit #510 "dwelling unit": to comply with nov 202301376. retrofit one window in living room. install linoleum flooring (approx 400 sf). baseboard kitchen cabinets. bathroom vanity. toilet.Details
unit #510 "dwelling unit": to comply with nov 202301376. retrofit one window in living room. install linoleum flooring (approx 400 sf). baseboard kitchen cabinets. bathroom vanity. toilet. | $5,000 |
| Jul 31, 2023 | Never finaled issued Jul 2023, no final | 455 Fell St | unit #221: install drywall and insulation as needed 45 linear ft bathroom and hallway walls 2ft hight from the floor due to water damage. all work to be done in "like-kind" manner. all work is non-stuctural only. contact district building inspector at the start of work.Details
unit #221: install drywall and insulation as needed 45 linear ft bathroom and hallway walls 2ft hight from the floor due to water damage. all work to be done in "like-kind" manner. all work is non-stuctural only. contact district building inspector at the start of work. | $2,500 |
| Jan 20, 2023 | Completed final sign-off Aug 2023 | 350 Golden Gate Av | replace drywall and insulations as needed on 17th residential units. common hallways and stairways as needed due to sprinkler broke on 4/f. reinstall and replace base kitchen cabinets as needed. reinstall and replace bathroom vanity and toilets as needed. replace light fixtures as needed.Details
replace drywall and insulations as needed on 17th residential units. common hallways and stairways as needed due to sprinkler broke on 4/f. reinstall and replace base kitchen cabinets as needed. reinstall and replace bathroom vanity and toilets as needed. replace light fixtures as needed. | $190,000 |
| Dec 30, 2022 | Completed final sign-off Mar 2023 | 57 Paramount Tr | drywall work on laundry room and a hallway. electrical work (reseting lights no new wiring) on laundry room and a hallway.Details
drywall work on laundry room and a hallway. electrical work (reseting lights no new wiring) on laundry room and a hallway. | $3,000 |
| Sep 16, 2022 | Completed final sign-off Jun 2025 | 172 06th St | water damage repair-install new drywall in unit #214 , new drywall repair- unit #314 new dryall repair in basement, install vinyl planks in some floor areas only for repair (to comply with #202292960-rapair celings drywall in common area only)Details
water damage repair-install new drywall in unit #214 , new drywall repair- unit #314 new dryall repair in basement, install vinyl planks in some floor areas only for repair (to comply with #202292960-rapair celings drywall in common area only) | $2,200 |
| Sep 13, 2022 | Never finaled issued Sep 2022, no final | 205 Jones St | 4th floor unit demo flooring in the bathroom and tear of 20sf drywall: 3rd floor unit demo drywall in bathroom 100s ceiling and walls: 2nd floor unit demo drywall in bathroom 100sf ceiling 4 walls. patch and repair in kind after exploratory work done. no alteration to existing fire rated wallsDetails
4th floor unit demo flooring in the bathroom and tear of 20sf drywall: 3rd floor unit demo drywall in bathroom 100s ceiling and walls: 2nd floor unit demo drywall in bathroom 100sf ceiling 4 walls. patch and repair in kind after exploratory work done. no alteration to existing fire rated walls | $4,000 |
| Jul 19, 2022 | Completed final sign-off Feb 2023 | 1327 Shafter Av | fire damage repair to comply nov202290974. obtain bid inspecction prior to work: remove drywall and reinstall new sheetrock & insulation. remove (3) 2x4 studes and replace in-kind.remove flooring from living room , patch roofing.move electrical ckt 6ft from where it is. r/r damaged stucco.Details
fire damage repair to comply nov202290974. obtain bid inspecction prior to work: remove drywall and reinstall new sheetrock & insulation. remove (3) 2x4 studes and replace in-kind.remove flooring from living room , patch roofing.move electrical ckt 6ft from where it is. r/r damaged stucco. | $12,000 |
| Jun 17, 2022 | Completed final sign-off Nov 2022 | 1331 Shafter Av | to comply with nov#202290973: repair work due to smoke damage- front elevation repair stucco 20 sq ft approx. master bedroom install insulaation and drywall on the ceiling and partial on walls. also, repair roof shingles patch work 20 sq ft only (visible from street).Details
to comply with nov#202290973: repair work due to smoke damage- front elevation repair stucco 20 sq ft approx. master bedroom install insulaation and drywall on the ceiling and partial on walls. also, repair roof shingles patch work 20 sq ft only (visible from street). | $12,000 |