Blue Sky Wallace Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2019 to Aug 2025
- Last 24 months
- 3 permits filed
12 permits since 2000: 12 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2025 | Completed final sign-off May 2026 | 3800 San Bruno Av | remove stucco at 2 sides and front and install new james hardie siding.Details
remove stucco at 2 sides and front and install new james hardie siding. | $20,000 |
| Aug 7, 2025 | Completed final sign-off Jun 2026 | 3800 San Bruno Av | replace (9) windows, like for like. (5) of the windows are street facing.Details
replace (9) windows, like for like. (5) of the windows are street facing. | $6,000 |
| Jan 21, 2025 | Completed final sign-off Mar 2025 | 2266 17th Av | full bathroom remodel. change the bathtub to walk in shower. replace vanity. lights, toilet and tiles. no removal and adding wallDetails
full bathroom remodel. change the bathtub to walk in shower. replace vanity. lights, toilet and tiles. no removal and adding wall | $32,776 |
| Aug 30, 2024 | Completed final sign-off Oct 2024 | 69 Escondido Av | master bathroom remodel. change bathtub to a shower. retile the floor. change new toilet. vanity.Details
master bathroom remodel. change bathtub to a shower. retile the floor. change new toilet. vanity. | $15,000 |
| May 29, 2024 | Completed final sign-off Aug 2024 | 2117 14th Av | 2nd floor: remodel bathroom on 2nd floor. add shower. no modifications to existing walls.Details
2nd floor: remodel bathroom on 2nd floor. add shower. no modifications to existing walls. | $9,500 |
| Nov 20, 2023 | Completed final sign-off Jul 2024 | 2111 14th Av | remodel e kitchen and dining room, including removal of bearing wall/beam. replace lighting in e living rm new washer dryer in closetDetails
remodel e kitchen and dining room, including removal of bearing wall/beam. replace lighting in e living rm new washer dryer in closet | $50,000 |
| Aug 10, 2023 | Completed final sign-off May 2024 | 2111 14th Av | two full bathroom remodels. replace the vanities as like as. rebuilding showers as like as. replace the floor tile and wall tiles as like as. replace toilets as like as. no wall will move. about 63 sf each bathroom.Details
two full bathroom remodels. replace the vanities as like as. rebuilding showers as like as. replace the floor tile and wall tiles as like as. replace toilets as like as. no wall will move. about 63 sf each bathroom. | $10,000 |
| Apr 12, 2023 | Completed final sign-off Jun 2023 | 2111 14th Av | replace vanity in kind in two bathrooms at basement and main floor. replace lights, exhaust fan, faucets, and showers in kind. replace vanity in kind at existing wet bar.Details
replace vanity in kind in two bathrooms at basement and main floor. replace lights, exhaust fan, faucets, and showers in kind. replace vanity in kind at existing wet bar. | |
| Jan 6, 2023 | Completed final sign-off Jun 2023 | 2111 14th Av | remove a bathtub and build a shower in basement. add a shower in the main foor bathroom. tile new tile floor.Details
remove a bathtub and build a shower in basement. add a shower in the main foor bathroom. tile new tile floor. | $20,000 |
| Apr 27, 2021 | Completed final sign-off Jul 2021 | 319 Flood Av | remodel the kitchen, bathroom. no moving walls. like to like in kind.Details
remodel the kitchen, bathroom. no moving walls. like to like in kind. | $35,000 |
| Jun 6, 2019 | Completed final sign-off Jul 2019 | 2463 18th Av | need to removed the steps and water proofing. work less than 50%Details
need to removed the steps and water proofing. work less than 50% | $8,000 |
| Feb 6, 2019 | Completed final sign-off Apr 2019 | 1136 Eddy St | remodel kitchenDetails
remodel kitchen | $11,000 |