Blue Heron Builder
- Based in
- Richmond
- On San Francisco permits
- Mar 2016 to Sep 2019
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2019 | Never finaled issued Sep 2019, no final | 1 Capp St | comply w/ physical inspection report #cc8272Details
comply w/ physical inspection report #cc8272 | $20,000 |
| Oct 29, 2018 | Completed final sign-off Sep 2019 | 1 Capp St | to obtain final inspection for work approved under pa# 200807096300 all work is complete. [provide properly install carbon monoxide detectors. identify each elec service panel board as appliacble. washing machine requieres an approved waste].Details
to obtain final inspection for work approved under pa# 200807096300 all work is complete. [provide properly install carbon monoxide detectors. identify each elec service panel board as appliacble. washing machine requieres an approved waste]. | |
| Oct 18, 2018 | Completed final sign-off Jun 2019 | 703 16th Av | upper unit. enclose 2nd floor deck with walls and a roof. bathroom remodel. new toilet, shower, tub, vanity and washer & dryer. new window at rear. new skylight.Details
upper unit. enclose 2nd floor deck with walls and a roof. bathroom remodel. new toilet, shower, tub, vanity and washer & dryer. new window at rear. new skylight. | $20,000 |
| Aug 24, 2017 | Completed final sign-off Aug 2018 | 63 Woodland Av | remodel of kitchen and 2 extg baths (1 powder , 1 full). replacement/relocation of windows at rear facade.Details
remodel of kitchen and 2 extg baths (1 powder , 1 full). replacement/relocation of windows at rear facade. | $65,000 |
| Jun 23, 2017 | Completed final sign-off Dec 2017 | 2784 Bush St | 2nd fl: add new bathroom for master bedrm, install new closet for master bedrm, replace kitchen window, guest bedroom window and master bedrm window, interior paint, in kind. install new cabinet in living rm.Details
2nd fl: add new bathroom for master bedrm, install new closet for master bedrm, replace kitchen window, guest bedroom window and master bedrm window, interior paint, in kind. install new cabinet in living rm. | $78,000 |
| Dec 13, 2016 | Completed final sign-off Apr 2017 | 425 14th St | unit #3: kitchen remodel, plumbing location to remain existing locations, replace laminate floors, change out lights to all led to comply with title-24.Details
unit #3: kitchen remodel, plumbing location to remain existing locations, replace laminate floors, change out lights to all led to comply with title-24. | $35,000 |
| May 3, 2016 | Completed final sign-off Jun 2016 | 1 Capp St | back stairs replace in kind.Details
back stairs replace in kind. | $20,000 |
| Mar 16, 2016 | Expired or cancelled cancelled Jun 2016 | 1 Capp St | repair back stair in -kind less than 50%.Details
repair back stair in -kind less than 50%. | $20,000 |