Blue Collar Heating And Air
- Based in
- Temecula
- On San Francisco permits
- Oct 2021 to Oct 2021
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2021 | Never finaled issued Oct 2021, no final | 535 Missouri St | furnace change out ac add on 96.7 afue 80 k btu. 26 seer 4.ot duct work. new circuit 220v 501 60 amp 30 feet electrical. new disconnect box & ship to condenser.Details
furnace change out ac add on 96.7 afue 80 k btu. 26 seer 4.ot duct work. new circuit 220v 501 60 amp 30 feet electrical. new disconnect box & ship to condenser. | $27,755 |