Bing Wu Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2007 to May 2026
- Last 24 months
- 3 permits filed
58 permits since 2000: 54 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2026 | In progress issued May 2026 | 1000 Franklin St | unit 305: kitchen remodel like for like, no layout change, no wall stud framing demolition. replace washer and dryer like for like same connections and location.Details
unit 305: kitchen remodel like for like, no layout change, no wall stud framing demolition. replace washer and dryer like for like same connections and location. | $10,000 |
| May 16, 2025 | Completed final sign-off Jul 2026 | 1588 Hayes St | to obtain final inspection for work approved under pa #2016-0616-0125. all wokr is completeDetails
to obtain final inspection for work approved under pa #2016-0616-0125. all wokr is complete | |
| Mar 28, 2025 | Completed final sign-off Aug 2025 | 2159 40th Av | bathroom remodel in place replace tub, sink, floor tiles, install new vent & replace 1 outlet no plans. no change in layoutDetails
bathroom remodel in place replace tub, sink, floor tiles, install new vent & replace 1 outlet no plans. no change in layout | $12,000 |
| Sep 20, 2024 | Completed final sign-off Feb 2025 | 1626 45th Av | bathroom renovation. replace bathtub w/ showerpan. replace 1 toilet, install new vent fan no plans.Details
bathroom renovation. replace bathtub w/ showerpan. replace 1 toilet, install new vent fan no plans. | $15,000 |
| Jun 28, 2024 | Completed final sign-off Oct 2024 | 2410 47th Av | in kind-bathroom remodel: replace toilet, tub, sink, (all items to remain in same location)Details
in kind-bathroom remodel: replace toilet, tub, sink, (all items to remain in same location) | $12,000 |
| May 17, 2024 | Completed final sign-off Oct 2024 | 1346 26th Av | front of building 10 exterior stair treads less than 50% back of building: replace 25x20 exterior sidingDetails
front of building 10 exterior stair treads less than 50% back of building: replace 25x20 exterior siding | $9,800 |
| Apr 3, 2024 | Completed final sign-off Sep 2025 | 716 24th Av | 1/f: add 1 media, 1 office, and 1 full bath.Details
1/f: add 1 media, 1 office, and 1 full bath. | $120,000 |
| Mar 21, 2024 | Completed final sign-off Jul 2024 | 722 24th Av | replace stucco for exterior wall 5' width x 15' height ( street facing, to the right of the front building stairs)Details
replace stucco for exterior wall 5' width x 15' height ( street facing, to the right of the front building stairs) | $3,000 |
| Jan 5, 2024 | Completed final sign-off Mar 2024 | 2438 39th Av | bathroom remodel - replace bathtub, toilet, tiles, sink. no moving walls. in-kind remodel.Details
bathroom remodel - replace bathtub, toilet, tiles, sink. no moving walls. in-kind remodel. | $15,000 |
| Sep 25, 2023 | Completed final sign-off Nov 2023 | 142 Sweeny St | 2nd floor bathroom remodel- new bathtub (same size) 1 new outlet and replace 1 old. no wall removal.Details
2nd floor bathroom remodel- new bathtub (same size) 1 new outlet and replace 1 old. no wall removal. | $10,000 |
| Feb 10, 2023 | Completed final sign-off Sep 2023 | 1235 46th Av | repair 10x10 siding from leak (exterior facing neighbor)Details
repair 10x10 siding from leak (exterior facing neighbor) | $3,500 |
| Aug 25, 2022 | Completed final sign-off Aug 2023 | 2701 Judah St | installation of electrical door opener at the front door to comply with accessible requirementDetails
installation of electrical door opener at the front door to comply with accessible requirement | $2,800 |
| Jun 24, 2022 | Completed final sign-off May 2023 | 1235 46th Av | replace (2) windows in the back. same size and locations. max u-factor 0.30 or better.Details
replace (2) windows in the back. same size and locations. max u-factor 0.30 or better. | $2,000 |
| Feb 25, 2022 | Completed final sign-off Mar 2023 | 1588 Hayes St | renewal for pa# 201512155163. recommencement and completion of work approved under pa#201512155163Details
renewal for pa# 201512155163. recommencement and completion of work approved under pa#201512155163 | $40,000 |
| Mar 12, 2021 | Completed final sign-off Aug 2021 | 400 43rd Av | uit #402: remodel 1 bathroom in kind. reokace bathtub with new shower. install wall tiles. replace sink, vanity, fan for ventilation & electricity.Details
uit #402: remodel 1 bathroom in kind. reokace bathtub with new shower. install wall tiles. replace sink, vanity, fan for ventilation & electricity. | $14,500 |
| Jan 15, 2021 | Completed final sign-off May 2024 | 201 Mallorca Wy | replace 1 kitchen sink, countertop, 2 cabinets each unitDetails
replace 1 kitchen sink, countertop, 2 cabinets each unit | $30,000 |
| Nov 17, 2020 | Completed final sign-off Aug 2021 | 400 43rd Av | to comply with nov201960881: install 2 opening on g/f at stair lobby. approx sizes 4-6 x 6-10. one opening to be infilled with stucco to match (e), 2nd oening infill with 44x44in slider window.Details
to comply with nov201960881: install 2 opening on g/f at stair lobby. approx sizes 4-6 x 6-10. one opening to be infilled with stucco to match (e), 2nd oening infill with 44x44in slider window. | $2,000 |
| Sep 28, 2020 | Completed final sign-off Dec 2020 | 355 Harkness Av | insall an additional layer of siding on the back of the buildingDetails
insall an additional layer of siding on the back of the building | $10,000 |
| Aug 15, 2020 | Completed final sign-off Oct 2020 | 647 Bosworth St | replace exterior deck floor tiles with new floor tiles and waterproofing membrane. work is less than 50% of the whole deck. deck is approximately 11'x15', and at rear of building. not visible from street.Details
replace exterior deck floor tiles with new floor tiles and waterproofing membrane. work is less than 50% of the whole deck. deck is approximately 11'x15', and at rear of building. not visible from street. | $12,000 |
| Jun 30, 2020 | Completed final sign-off Apr 2022 | 27 University St | 1st fl - add 2 bedrooms, 2 full baths, family room & play room; 2nd fl - add 1 full bath remodel bathroomDetails
1st fl - add 2 bedrooms, 2 full baths, family room & play room; 2nd fl - add 1 full bath remodel bathroom | $45,000 |
| Aug 15, 2019 | Completed final sign-off Jun 2020 | 22 Ross Al | change of use from retail to cafe/boba tea. tenant improvement of new cafe, boba tea update accessibleDetails
change of use from retail to cafe/boba tea. tenant improvement of new cafe, boba tea update accessible | $40,000 |
| Jan 22, 2019 | Completed final sign-off Dec 2019 | 8 University St | add (1) bedroom, (1) bath media room & laundry at 1st fl.Details
add (1) bedroom, (1) bath media room & laundry at 1st fl. | $30,000 |
| Nov 8, 2018 | Completed final sign-off May 2019 | 1321 14th Av | replace kitchen appliances, cabinets, electricals,plumbing in kind. replace toilet,fan,tub,sink in bathroom in kind. no structural under this permit.Details
replace kitchen appliances, cabinets, electricals,plumbing in kind. replace toilet,fan,tub,sink in bathroom in kind. no structural under this permit. | $20,000 |
| Jun 22, 2018 | Completed final sign-off Sep 2018 | 1908 Anza St | replace exhaust fan sink, toilet in kind. install one shower pan, in same location, one outlet(gfi), one light. everything in same location,. no moving of doors or wallsDetails
replace exhaust fan sink, toilet in kind. install one shower pan, in same location, one outlet(gfi), one light. everything in same location,. no moving of doors or walls | $6,000 |
| Mar 30, 2018 | Completed final sign-off Dec 2018 | 737 Jackson St | install (1) 6-gallon electric water heater, replace electrical outlets, install emergency lights, replace front door in-kind, new sheetrock for the hallway/stairway walls. all work is in residential area.Details
install (1) 6-gallon electric water heater, replace electrical outlets, install emergency lights, replace front door in-kind, new sheetrock for the hallway/stairway walls. all work is in residential area. | $20,000 |
| Mar 30, 2018 | Completed final sign-off Jun 2018 | 131 Waverly Pl | replace (10) windows, not street facingDetails
replace (10) windows, not street facing | $5,000 |
| Nov 1, 2017 | Completed final sign-off Mar 2018 | 788 Green St | bathroom remodel. replace shower pan in-kind. replace 1 exhaust fan in-kind.Details
bathroom remodel. replace shower pan in-kind. replace 1 exhaust fan in-kind. | $3,000 |
| Oct 23, 2017 | Completed final sign-off Apr 2018 | 1979 Oakdale Av | add 3 bedrooms, 2 powder rooms, media room on 1st fl per planDetails
add 3 bedrooms, 2 powder rooms, media room on 1st fl per plan | $35,000 |
| Aug 12, 2016 | Completed final sign-off Oct 2016 | 2436 Polk St | revision to app#201607142424 to replace extg beam, posts, & footing at ground floor.Details
revision to app#201607142424 to replace extg beam, posts, & footing at ground floor. | $3,000 |
| Jul 14, 2016 | Completed final sign-off Oct 2016 | 2436 Polk St | remodel (e) coffee shop to replace (e) counter and add one new pre-sink at ground floor.Details
remodel (e) coffee shop to replace (e) counter and add one new pre-sink at ground floor. | $5,000 |
| Jun 16, 2016 | Expired or cancelled expired Jul 2026 | 1588 Hayes St | (add unit per ordinances 30-15) add 2 units on 1st fl. each unit w/ (1) kitchen, (1) bedroom & (1) full bathroom. fire alarm and sprinkler under separate permit.Details
(add unit per ordinances 30-15) add 2 units on 1st fl. each unit w/ (1) kitchen, (1) bedroom & (1) full bathroom. fire alarm and sprinkler under separate permit. | $20,000 |
| Jun 13, 2016 | Completed final sign-off Jul 2016 | 1200 Clay St | #2 - replacement of 10 windows with all wood double or single hung windows with ogee lugs, same size, same location, max u-factor 0.32.Details
#2 - replacement of 10 windows with all wood double or single hung windows with ogee lugs, same size, same location, max u-factor 0.32. | $10,000 |
| Jun 2, 2016 | Completed final sign-off Feb 2020 | 160 San Carlos St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $20,000 |
| Mar 15, 2016 | Completed final sign-off Aug 2017 | 2339 41st Av | legalize as built unit on 1st fl w/ (2) bedroom, (1) storage & (1) kitchen per ordinance 43-14.Details
legalize as built unit on 1st fl w/ (2) bedroom, (1) storage & (1) kitchen per ordinance 43-14. | $20,000 |
| Dec 15, 2015 | Completed final sign-off Mar 2023 | 1588 Hayes St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix appendix a-4 | $20,000 |
| Oct 23, 2015 | Completed final sign-off Aug 2016 | 75 Folsom St | unit 1602:remove 2(e) walls and counters, add island, relocate sink, oven and fridge. replace countertop & cabinets w/same. remodel master bath- retile tub and replace vanity with like-kind. remove wall & door between mstr bedrm and backroom. replace vanity & shower door w/same in guest bath..Details
unit 1602:remove 2(e) walls and counters, add island, relocate sink, oven and fridge. replace countertop & cabinets w/same. remodel master bath- retile tub and replace vanity with like-kind. remove wall & door between mstr bedrm and backroom. replace vanity & shower door w/same in guest bath.. | $15,000 |
| Sep 11, 2015 | Completed final sign-off Sep 2019 | 1574 Church St | soft story program. 2012 iebc a.4. seismic retrofitDetails
soft story program. 2012 iebc a.4. seismic retrofit | $20,000 |
| Jul 13, 2015 | Completed final sign-off Mar 2016 | 2522 Lawton St | 2nd floor: remodel kitchen and bathroom, add new bathroom, add walk-in clsoet. remove (e) exterior stair. 1st floor: replace water heater and furnace.Details
2nd floor: remodel kitchen and bathroom, add new bathroom, add walk-in clsoet. remove (e) exterior stair. 1st floor: replace water heater and furnace. | $30,000 |
| Jun 30, 2015 | Completed final sign-off Aug 2015 | 2176 Chestnut St | laminate floor 220 sq ft. remove flooring & install new (220 sq ft0. replace laminated floor finishes.Details
laminate floor 220 sq ft. remove flooring & install new (220 sq ft0. replace laminated floor finishes. | $1,800 |
| Dec 23, 2014 | Completed final sign-off Apr 2015 | 722 Huron Av | to comply w/nov 201262824- revision to pa #2012.1009.1570: remove gas stove & wet bar @ 1st floorDetails
to comply w/nov 201262824- revision to pa #2012.1009.1570: remove gas stove & wet bar @ 1st floor | |
| Dec 9, 2014 | Completed final sign-off Oct 2019 | 1327 26th Av | add 2 bedrooms, one bath, and entertainment room on 1st floor.Details
add 2 bedrooms, one bath, and entertainment room on 1st floor. | $40,000 |
| Aug 27, 2014 | Completed final sign-off Oct 2014 | 890 Noriega St | repair front deck less than 50 percent, repair in kind.Details
repair front deck less than 50 percent, repair in kind. | $3,000 |
| Aug 27, 2014 | Completed final sign-off Oct 2014 | 1706 16th Av | replace 4 patio doors in kind u factor :0.32 max. repair front deck less than 50 percent.Details
replace 4 patio doors in kind u factor :0.32 max. repair front deck less than 50 percent. | $6,000 |
| Apr 29, 2014 | Completed final sign-off Nov 2015 | 1110 South Van Ness Av | revision to app# 201312063562, change bathr & kitchen rlayout under pa# 201312063562, add new laundry roomDetails
revision to app# 201312063562, change bathr & kitchen rlayout under pa# 201312063562, add new laundry room | $20,000 |
| Apr 3, 2014 | Never finaled issued Apr 2014, no final | 565 04th St | revision to pa#201308063629 commercial tenant improvement, change internal stairs & restroom layouts. fire sprinkler, mechanical & electrical work under seperate permit.n/a for the maher ordinance #155-13 and n/a for the interim control #428-13Details
revision to pa#201308063629 commercial tenant improvement, change internal stairs & restroom layouts. fire sprinkler, mechanical & electrical work under seperate permit.n/a for the maher ordinance #155-13 and n/a for the interim control #428-13 | $68,000 |
| Jan 3, 2014 | Completed final sign-off Apr 2014 | 620 46th Av | remodel one kitchen, one bedroom on 2nd fl. upgrade electrical service.Details
remodel one kitchen, one bedroom on 2nd fl. upgrade electrical service. | $23,000 |
| Dec 17, 2013 | Completed final sign-off Oct 2015 | 615 33rd Av | 2 story rear addition attached to (e) building. add one new bathroom, storage area, 2 new bedrooms, front door, laundry at ground floor per plan.Details
2 story rear addition attached to (e) building. add one new bathroom, storage area, 2 new bedrooms, front door, laundry at ground floor per plan. | $95,000 |
| Dec 6, 2013 | Completed final sign-off Nov 2015 | 1110 South Van Ness Av | add 1 bedroom, 1 bath, office, living room, interior stairs and in fill rear of building on 1st fl, unit 2. remodel e bedroom, kitchen, and bath on 3rd fl per plan, unit 3. add 1 bedroom, office and laundry room,remodel e kitchen and e bedroom, relocate e bath on 2nd fl 1st ,to be spklr'd 13rDetails
add 1 bedroom, 1 bath, office, living room, interior stairs and in fill rear of building on 1st fl, unit 2. remodel e bedroom, kitchen, and bath on 3rd fl per plan, unit 3. add 1 bedroom, office and laundry room,remodel e kitchen and e bedroom, relocate e bath on 2nd fl 1st ,to be spklr'd 13r | $80,000 |
| Oct 17, 2013 | Completed final sign-off Nov 2015 | 1110 South Van Ness Av | replace brick foundation with conventional concrete foundation. structural plywood wall strengtheningDetails
replace brick foundation with conventional concrete foundation. structural plywood wall strengthening | $40,000 |
| Oct 16, 2013 | Completed final sign-off Dec 2014 | 462 Ramsell St | repair stucco wall approximateley 6'x10' and repair stairway in frontyardDetails
repair stucco wall approximateley 6'x10' and repair stairway in frontyard | $4,000 |
| May 14, 2013 | Completed final sign-off Jul 2013 | 1137 Cayuga Av | legalize 2 bedrooms, 1 bathroom, laundry room & storage on 1st floor per planDetails
legalize 2 bedrooms, 1 bathroom, laundry room & storage on 1st floor per plan | $48,000 |
| Jan 11, 2013 | Completed final sign-off Mar 2013 | 1335 05th Av | comply with compliant #201268101 - convert illegal (e) living room, bedroom to utility room & storage room and legalize existing bath on ground floor.Details
comply with compliant #201268101 - convert illegal (e) living room, bedroom to utility room & storage room and legalize existing bath on ground floor. | $32,000 |
| Jan 11, 2013 | Completed final sign-off Dec 2014 | 462 Ramsell St | 1. add wood deck at rear per plan. 2. remove stove and sink and rooms per plan on 1st floor.Details
1. add wood deck at rear per plan. 2. remove stove and sink and rooms per plan on 1st floor. | $8,000 |
| Dec 13, 2012 | Completed final sign-off Aug 2013 | 184 Country Club Dr | remodel (e) bathroom, kitchen & construct one new bathroom at 2nd floor. legalize (e) family room, bathroom, laundry room & construct one new bathroom & two bedroom. all work at ground floor.Details
remodel (e) bathroom, kitchen & construct one new bathroom at 2nd floor. legalize (e) family room, bathroom, laundry room & construct one new bathroom & two bedroom. all work at ground floor. | $62,000 |
| Nov 9, 2012 | Completed final sign-off Jan 2013 | 162 San Carlos St | remodel 1 kitchen. size 10x11. lighting must comply w/cec 150(k).between 9/12Details
remodel 1 kitchen. size 10x11. lighting must comply w/cec 150(k).between 9/12 | $8,000 |
| Oct 9, 2012 | Never finaled issued Nov 2012, no final | 722 Huron Av | first floor alteration to add 1/2 bathroom, comply with nov 201262824Details
first floor alteration to add 1/2 bathroom, comply with nov 201262824 | $5,000 |
| Sep 30, 2011 | Completed final sign-off Oct 2011 | 1626 45th Av | the front part of the house is leaking when it rains. repalce the front exterior stucco with new stucco (3 ft. x 10 ft.)Details
the front part of the house is leaking when it rains. repalce the front exterior stucco with new stucco (3 ft. x 10 ft.) | $1,500 |
| Feb 8, 2007 | Completed final sign-off Sep 2007 | 220 Peninsula Av | to add one playroom/laundry room, one bedroom, one full bathroom, & one storage on (e) groundfloor.Details
to add one playroom/laundry room, one bedroom, one full bathroom, & one storage on (e) groundfloor. | $22,000 |