Bing Quan Li
- Based in
- San Francisco
- On San Francisco permits
- Nov 2001 to Jul 2018
- Last 24 months
- 0 permits filed
19 permits since 2000: 14 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 5, 2018 | Completed final sign-off Sep 2018 | 22 Huntington Dr | remodel 1 bathroom in-kind.Details
remodel 1 bathroom in-kind. | $5,000 |
| Mar 29, 2013 | Expired or cancelled cancelled Jan 2026 | 103 Waverly Pl | revision to approve pa# 201209058991. re-issue lost plans at health dept. no construction work , for documentation purpose only.Details
revision to approve pa# 201209058991. re-issue lost plans at health dept. no construction work , for documentation purpose only. | |
| Mar 19, 2013 | Completed final sign-off Apr 2013 | 3124 Pacheco St | remodel kitchen - countertop, cabinets, non-structural workDetails
remodel kitchen - countertop, cabinets, non-structural work | $12,000 |
| Sep 5, 2012 | Completed final sign-off Aug 2013 | 103 Waverly Pl | change of use from retail to cafe. interior alterations as new coffee shop. install equipment, (n) electrical panel.Details
change of use from retail to cafe. interior alterations as new coffee shop. install equipment, (n) electrical panel. | $20,000 |
| May 3, 2012 | Completed final sign-off Aug 2013 | 103 Waverly Pl | install accessible bathroomDetails
install accessible bathroom | $8,000 |
| Aug 31, 2010 | Completed final sign-off Oct 2010 | 30 Palos Pl | repair exteriors stucco 3'x25' & 4'x14'Details
repair exteriors stucco 3'x25' & 4'x14' | $3,500 |
| Jul 27, 2010 | Completed final sign-off Aug 2010 | 260 Morningside Dr | repair front siding in kind, dryrot. total area 4'x14'Details
repair front siding in kind, dryrot. total area 4'x14' | $1,000 |
| Aug 14, 2009 | Never finaled issued Aug 2009, no final | 2125 Hayes St | repair garage ceiling - damage from leaky lightwell with insulation & sheetrock. 5/8 degree type x sheetrock required.Details
repair garage ceiling - damage from leaky lightwell with insulation & sheetrock. 5/8 degree type x sheetrock required. | $4,500 |
| Jul 27, 2009 | Completed final sign-off Sep 2009 | 355 21st Av | apt #3 bathroom, remove and replace toilet, bathroom fan remove and replace sink, vanity towel racks remove and replace bathroom tile and flooring remove and replace tub showerDetails
apt #3 bathroom, remove and replace toilet, bathroom fan remove and replace sink, vanity towel racks remove and replace bathroom tile and flooring remove and replace tub shower | $5,000 |
| May 7, 2007 | Completed final sign-off Aug 2007 | 260 Morningside Dr | kitchen remodeling.Details
kitchen remodeling. | $20,000 |
| Sep 1, 2006 | Completed final sign-off Jan 2007 | 1243 Noriega St | new shshi bar to be constructed at ground floor next to existing kitchen area. recess new front door.Details
new shshi bar to be constructed at ground floor next to existing kitchen area. recess new front door. | $12,000 |
| May 10, 2004 | Completed final sign-off Jul 2004 | 382 Staples Av | kitchen reodel 2nd floor replacing front stucco approx 3x10 and paintingDetails
kitchen reodel 2nd floor replacing front stucco approx 3x10 and painting | $10,000 |
| Nov 21, 2003 | Completed final sign-off Nov 2003 | 2426 Cabrillo St | comply nov 200345643 per bldg inspector.install storage locker not use for combustible material.Details
comply nov 200345643 per bldg inspector.install storage locker not use for combustible material. | $700 |
| Aug 13, 2003 | Completed final sign-off Sep 2003 | 1758 24th Av | replacing front window (w 108"x h 87-1/2")Details
replacing front window (w 108"x h 87-1/2") | $1,500 |
| May 12, 2003 | Never finaled issued May 2003, no final | 2055 43rd Av | to renew app#2001/11/15/3342 for final inspection.Details
to renew app#2001/11/15/3342 for final inspection. | |
| Sep 5, 2002 | Never finaled filed Sep 2002, never issued | 643 Precita Av | replace windows 10 in front,same type.Details
replace windows 10 in front,same type. | $5,000 |
| Aug 30, 2002 | Completed final sign-off Oct 2002 | 2426 Cabrillo St | repair 4 x 4, three windows in the light wellDetails
repair 4 x 4, three windows in the light well | $1,000 |
| Dec 18, 2001 | Expired or cancelled expired Dec 2002 | 2426 Cabrillo St | replace windows (nine) at rear of buildingDetails
replace windows (nine) at rear of building | $3,000 |
| Nov 15, 2001 | Completed final sign-off May 2003 | 2055 43rd Av | renew permit app 9817451, to continue work per prev 981745Details
renew permit app 9817451, to continue work per prev 981745 | $8,000 |