Bill Wong Construction
- Based in
- Brisbane
- On San Francisco permits
- Mar 2015 to Jun 2018
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2018 | Completed final sign-off Jun 2019 | 722 South Van Ness Av | alt of (e) 2 story (e) childcare to convert 2/f (e) rear rooms to a single new class.convert (e) 2/f adult bathroom to a child restroom.add a 1/2 adult bathroom on 2/f. all new toilets wil be tank toilets.convert 2 basement floor valve toilets to tank tiolets and 1/f floor powder room...Details
alt of (e) 2 story (e) childcare to convert 2/f (e) rear rooms to a single new class.convert (e) 2/f adult bathroom to a child restroom.add a 1/2 adult bathroom on 2/f. all new toilets wil be tank toilets.convert 2 basement floor valve toilets to tank tiolets and 1/f floor powder room... | $7,500 |
| Jun 15, 2017 | Completed final sign-off Jun 2018 | 722 South Van Ness Av | revision to 2015-0330-2300: omission of previously planned lula liftDetails
revision to 2015-0330-2300: omission of previously planned lula lift | |
| Oct 28, 2016 | Completed final sign-off Sep 2017 | 2757 43rd Av | bldg under construction by ref 201607212988: for this application: replace the cracked stucco at front and side of the bldg (east & south)Details
bldg under construction by ref 201607212988: for this application: replace the cracked stucco at front and side of the bldg (east & south) | $8,000 |
| Jul 21, 2016 | Completed final sign-off Sep 2017 | 2757 43rd Av | remove all interior gyp bd/lath plaster. replace w/ 5/8" gyp bd type x - walls & ceilings. provide r-13 insulation in walls. r-19 in floor and r-30 in ceiling/roof. rebuild int stairs. new skylights, new ele & plumb. 2/f - relocate (e) bedrooms, kitchen add 1 bathrm, 1/f - add family room & bathrmDetails
remove all interior gyp bd/lath plaster. replace w/ 5/8" gyp bd type x - walls & ceilings. provide r-13 insulation in walls. r-19 in floor and r-30 in ceiling/roof. rebuild int stairs. new skylights, new ele & plumb. 2/f - relocate (e) bedrooms, kitchen add 1 bathrm, 1/f - add family room & bathrm | $80,000 |
| Mar 30, 2015 | Completed final sign-off Sep 2017 | 722 South Van Ness Av | alteration of (e) 2 story residential sfd to new child care center. property owned by adjacent church. renovation of interior spaces. accessible path of travel including lula, restrooms. conditional use approved change# 2013.1656c. dated june 12, 2014.Details
alteration of (e) 2 story residential sfd to new child care center. property owned by adjacent church. renovation of interior spaces. accessible path of travel including lula, restrooms. conditional use approved change# 2013.1656c. dated june 12, 2014. | $80,000 |