Bill Schulze
- Based in
- Kentfield
- On San Francisco permits
- Jul 2012 to Aug 2012
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 30, 2012 | Never finaled issued Aug 2012, no final | 30 Macedonia St | replace (e) bathtub with step-in-tub in kind. repair drain line on (e) tub.Details
replace (e) bathtub with step-in-tub in kind. repair drain line on (e) tub. | $2,500 |
| Aug 21, 2012 | Never finaled issued Aug 2012, no final | 147 Flood Av | replace existing bathtub with step-in bathtub in kind, same locationDetails
replace existing bathtub with step-in bathtub in kind, same location | $2,500 |
| Jul 10, 2012 | Completed final sign-off Jul 2012 | 1277 24th Av | change out (e) bath tub with new bath tub on 3rd floor.Details
change out (e) bath tub with new bath tub on 3rd floor. | $2,500 |