Bill Hitchcock Const
- Based in
- Sausalito
- On San Francisco permits
- Dec 2015 to Jan 2023
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2023 | Completed final sign-off Mar 2023 | 889 Balboa St | termite repair, stucco repair, 2 ext doors, scaffold, no structural. in kind. approx 700 sq ftDetails
termite repair, stucco repair, 2 ext doors, scaffold, no structural. in kind. approx 700 sq ft | $62,500 |
| May 16, 2019 | Completed final sign-off Sep 2019 | 1667 45th Av | replace in-kind: remodel extg kitchen and mainfloor bathroom. change (6) windows (exclude front windows on sep permit) and 1 sliding glass door. max u-factor 0.32 or better. no layout changes, no walls being infilled or modified.Details
replace in-kind: remodel extg kitchen and mainfloor bathroom. change (6) windows (exclude front windows on sep permit) and 1 sliding glass door. max u-factor 0.32 or better. no layout changes, no walls being infilled or modified. | $130,000 |
| Aug 7, 2018 | Completed final sign-off Apr 2019 | 1587 27th Av | remodel/legalize e downstairs. remodel e bathroom, upgrade electric and increase size of 1 exterior rear window. all work to take place on 1st flDetails
remodel/legalize e downstairs. remodel e bathroom, upgrade electric and increase size of 1 exterior rear window. all work to take place on 1st fl | $110,000 |
| Jun 21, 2018 | Completed final sign-off Jan 2019 | 443 20th Av | interior remodel of main floor only at rear of house, remodel extg kitchen, laundry, & powder room. new windows and doors in this area only. new electrical and plmg in this area only. no change to extg footprint or extg deck.Details
interior remodel of main floor only at rear of house, remodel extg kitchen, laundry, & powder room. new windows and doors in this area only. new electrical and plmg in this area only. no change to extg footprint or extg deck. | $80,000 |
| Dec 14, 2017 | Completed final sign-off Mar 2018 | 1587 27th Av | removal & replacement of kitchen cabinets, lighting, flooring & counter tops. widen opening in non-bearing wall between kitchen and dining room.Details
removal & replacement of kitchen cabinets, lighting, flooring & counter tops. widen opening in non-bearing wall between kitchen and dining room. | $85,000 |
| Oct 13, 2016 | Completed final sign-off Mar 2017 | 889 Balboa St | remodel 3 bathrooms and 1 kitchen and add lighting. no structural work. no walls to be movedDetails
remodel 3 bathrooms and 1 kitchen and add lighting. no structural work. no walls to be moved | $130,000 |
| Dec 9, 2015 | Completed final sign-off Feb 2016 | 401 Taraval St | convert storage room to lunch room for employees, cooking appliances, pluminging, electrical, mechanical. hood, exhaust. breadkroom install cabinets, and plumbing/sinkDetails
convert storage room to lunch room for employees, cooking appliances, pluminging, electrical, mechanical. hood, exhaust. breadkroom install cabinets, and plumbing/sink | $21,000 |