9 permits since 2000: 6 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 8, 2008 | Completed final sign-off Oct 2009 | 50 Scott St | new location of fire department connection for fire sprinklers. revised from original application #2007-1011-5108Details
new location of fire department connection for fire sprinklers. revised from original application #2007-1011-5108 | |
| Apr 1, 2008 | Expired or cancelled expired Aug 2009 | 1650 Mission St | revision to 200802144804, change type of sprinkler head on the 5th floor/concealed headsDetails
revision to 200802144804, change type of sprinkler head on the 5th floor/concealed heads | |
| Mar 31, 2008 | Completed final sign-off Jun 2008 | 2901 Mariposa St | fire sprinklers: 2nd flr -relocate 7 heads,add 16 new heads,extend piping from existing,repalce (e) heads. 3rd flr -relocate 3 heads,add 30 new heads, extend piping from exising, replace (e) heads. back door entrance (hallway): replace (e) heads.all w/quick response.Details
fire sprinklers: 2nd flr -relocate 7 heads,add 16 new heads,extend piping from existing,repalce (e) heads. 3rd flr -relocate 3 heads,add 30 new heads, extend piping from exising, replace (e) heads. back door entrance (hallway): replace (e) heads.all w/quick response. | $28,000 |
| Feb 14, 2008 | Expired or cancelled expired Aug 2009 | 1650 Mission St | relocating 34 sprinkler heads & remove 3 heads on 4th floor. relocating 27 sprinkler heads & remove 2 heads on 5th floor.Details
relocating 34 sprinkler heads & remove 3 heads on 4th floor. relocating 27 sprinkler heads & remove 2 heads on 5th floor. | $12,500 |
| Oct 11, 2007 | Completed final sign-off Jun 2009 | 50 Scott St | fire sprinkler system for entire builidng. basement/lower floor: relocate 40 heads & install 12 new heads; 1st fl: new 86 heads and 1 new piping; 1st fl/higher level: new 63 heads and 1 new piping.Details
fire sprinkler system for entire builidng. basement/lower floor: relocate 40 heads & install 12 new heads; 1st fl: new 86 heads and 1 new piping; 1st fl/higher level: new 63 heads and 1 new piping. | $100,000 |
| Oct 10, 2007 | Completed final sign-off Feb 2008 | 401 Hayes St | fire sprinkler system on 1st floor. relocate 16 sprinkler heads. architectural plans approved under pa# 2007.09.17.2890Details
fire sprinkler system on 1st floor. relocate 16 sprinkler heads. architectural plans approved under pa# 2007.09.17.2890 | $5,000 |
| Sep 14, 2007 | Completed final sign-off Oct 2008 | 2099 Kearny St | fire sprinkler work- remove 2 on second floor and add 2 on first floor. adding piping connection from first floor to second.Details
fire sprinkler work- remove 2 on second floor and add 2 on first floor. adding piping connection from first floor to second. | $5,000 |
| Feb 14, 2007 | Expired or cancelled expired Apr 2009 | 140 Jones St | expand the existing sprinkler heads. alter new pipe in basement. 2nd-6th floor.Details
expand the existing sprinkler heads. alter new pipe in basement. 2nd-6th floor. | $45,000 |
| Feb 1, 2007 | Completed final sign-off Jan 2009 | 2825 Diamond St | install fire sprinkler t.i.work, 78 heads.Details
install fire sprinkler t.i.work, 78 heads. | $20,000 |