Permit GraphShortlistSan Francisco building permits since 2000

Better Building/Greg Frmn

Contractor license
524187
State license record
Based in
San Francisco
On San Francisco permits
Oct 2001 to Jul 2008
Last 24 months
0 permits filed

11 permits since 2000: 9 completed, 1 never finaled, 1 expired or cancelled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllDeck 1Stairs 2
FiledOutcomeAddressWork described on the permitDeclared cost
Jul 24, 2008Completed
final sign-off Aug 2008
331 Justin Drvoluntary upgrade-5/8" x12" bolts w/ washers @ 4' within 10" of end. blocking between stud at mud sill stud walls w/ 1/2 plywood nailed with iop galv nail. post&beam connected w/ tees thur bolted w/ 5/8" bolts 10' nail galv a 4" on edge & 6" on field.
Details
Permit
200807247532
Status
complete
Filed
Jul 24, 2008
Permit issued
Jul 24, 2008
Final sign-off
Aug 25, 2008
Declared cost
$6,000
Address
331 Justin Dr

voluntary upgrade-5/8" x12" bolts w/ washers @ 4' within 10" of end. blocking between stud at mud sill stud walls w/ 1/2 plywood nailed with iop galv nail. post&beam connected w/ tees thur bolted w/ 5/8" bolts 10' nail galv a 4" on edge & 6" on field.

Open the permit page

$6,000
Jan 25, 2008Never finaled
issued Jan 2008, no final
1064 Innes Avmove stove to allow easy access to gas shut off. add anti tip device @ stove. add vacuum braken @ hand held shower. replace 2 windows @ side (not visible from street) metal 2 bar above windows. add one light and one switch above laundry & dryer.
Details
Permit
200801253299
Status
issued
Filed
Jan 25, 2008
Permit issued
Jan 29, 2008
Declared cost
$1,200
Address
1064 Innes Av

move stove to allow easy access to gas shut off. add anti tip device @ stove. add vacuum braken @ hand held shower. replace 2 windows @ side (not visible from street) metal 2 bar above windows. add one light and one switch above laundry & dryer.

Open the permit page

$1,200
Jul 12, 2006Completed
final sign-off Sep 2006
201 Middle Point Rdcoat exposed studs + sills with coppengreen or =. replace insulation and sheet rock appox 18. mud & tape, texture to match. repair of termite inspection. dry termit in trim material. (all interior work at hallway)
Details
Permit
200607126368
Status
complete
Filed
Jul 12, 2006
Permit issued
Jul 12, 2006
Final sign-off
Sep 21, 2006
Declared cost
$500
Address
201 Middle Point Rd

coat exposed studs + sills with coppengreen or =. replace insulation and sheet rock appox 18. mud & tape, texture to match. repair of termite inspection. dry termit in trim material. (all interior work at hallway)

Open the permit page

$500
Jan 30, 2006Completed
final sign-off May 2006
1431 Anza Str & r 2 stringers & 9 treads. replace with 2 x 12 ptdf. pre-primed with esmric primer. paint to match (e) color. add sanded deck paint to top treads. no top penatration. metal, brackets. one landing to be replaced w/ 2 x 6 ptdf. pre primed & painted w/ sanded deck coat. less than 25%.
Details
Permit
200601303345
Status
complete
Filed
Jan 30, 2006
Permit issued
Jan 30, 2006
Final sign-off
May 31, 2006
Declared cost
$2,500
Address
1431 Anza St

r & r 2 stringers & 9 treads. replace with 2 x 12 ptdf. pre-primed with esmric primer. paint to match (e) color. add sanded deck paint to top treads. no top penatration. metal, brackets. one landing to be replaced w/ 2 x 6 ptdf. pre primed & painted w/ sanded deck coat. less than 25%.

Open the permit page

$2,500
Nov 3, 2004Completed
final sign-off Jan 2005
1431 Anza Strepair vehicular damages to stairs. replace siding and supporting members west side. replace trim *
Details
Permit
200411038467
Status
complete
Filed
Nov 3, 2004
Permit issued
Nov 3, 2004
Final sign-off
Jan 3, 2005
Declared cost
$4,000
Address
1431 Anza St

repair vehicular damages to stairs. replace siding and supporting members west side. replace trim *

Open the permit page

$4,000
May 21, 2004Completed
final sign-off Nov 2004
1431 Anza Ste.q.retrofit-40 12"x5/8 bolts w/2"x2"washer over 2x6 ptdf fillen block into (e)foundation.30 sheets
Details
Permit
200405214510
Status
complete
Filed
May 21, 2004
Permit issued
May 21, 2004
Final sign-off
Nov 8, 2004
Declared cost
$6,800
Address
1431 Anza St

e.q.retrofit-40 12"x5/8 bolts w/2"x2"washer over 2x6 ptdf fillen block into (e)foundation.30 sheets

Open the permit page

$6,800
Apr 7, 2003Completed
final sign-off Jul 2003
463 Monterey Blrepair 4 back stairs threads and 3 risers/replace on 4x6 landing/add lattice work on extg rails
Details
Permit
200304071635
Status
complete
Filed
Apr 7, 2003
Permit issued
Apr 7, 2003
Final sign-off
Jul 8, 2003
Declared cost
$950
Address
463 Monterey Bl

repair 4 back stairs threads and 3 risers/replace on 4x6 landing/add lattice work on extg rails

Open the permit page

$950
Dec 5, 2002Expired or cancelled
expired Jan 2004
1842 Lake Stnew mable counter top new cook top and vent new double oven new sink new dishwashwer and one duplex
Details
Permit
200212052860
Status
expired
Filed
Dec 5, 2002
Permit issued
Dec 5, 2002
Declared cost
$12,000
Address
1842 Lake St

new mable counter top new cook top and vent new double oven new sink new dishwashwer and one duplex

Open the permit page

$12,000
May 13, 2002Completed
final sign-off Jul 2002
201 Middle Point Rdreplace siding on exterior & sheetrock on inside
Details
Permit
200205136389
Status
complete
Filed
May 13, 2002
Permit issued
May 13, 2002
Final sign-off
Jul 12, 2002
Declared cost
$5,600
Address
201 Middle Point Rd

replace siding on exterior & sheetrock on inside

Open the permit page

$5,600
May 13, 2002Completed
final sign-off Sep 2002
181 Bocana Stremove/replace 9 window steps in kind & 1 landing, 2 new stringer added
Details
Permit
200205136388
Status
complete
Filed
May 13, 2002
Permit issued
May 13, 2002
Final sign-off
Sep 24, 2002
Declared cost
$2,300
Address
181 Bocana St

remove/replace 9 window steps in kind & 1 landing, 2 new stringer added

Open the permit page

$2,300
Oct 2, 2001Completed
final sign-off Apr 2002
331 Justin Drrepair damaged siding at back of house/remove and replace 7 wndws in front
Details
Permit
200110029761
Status
complete
Filed
Oct 2, 2001
Permit issued
Oct 2, 2001
Final sign-off
Apr 1, 2002
Declared cost
$8,000
Address
331 Justin Dr

repair damaged siding at back of house/remove and replace 7 wndws in front

Open the permit page

$8,000