Beta Engineering California L P
- Based in
- Pineville
- On San Francisco permits
- Jul 2021 to Mar 2023
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2023 | Completed final sign-off Jun 2024 | 1535 Davidson Av | rev to pa# 2021-0707-3872: change back flow preventer and change to thrust blocks. orig scope: install foam suppression system for new sfpuc substation.Details
rev to pa# 2021-0707-3872: change back flow preventer and change to thrust blocks. orig scope: install foam suppression system for new sfpuc substation. | |
| Jul 7, 2021 | Completed final sign-off Jun 2024 | 1535 Davidson Av | build (n) 230 kv / 12.47 kv substation for sfpuc. substation to have a foam suppression system.Details
build (n) 230 kv / 12.47 kv substation for sfpuc. substation to have a foam suppression system. | $25,000 |