Best Forever Construction Company
- Based in
- Dublin
- On San Francisco permits
- Sep 2016 to Oct 2022
- Last 24 months
- 0 permits filed
16 permits since 2000: 12 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 25, 2022 | Never finaled issued Jan 2023, no final | 674 Sacramento St | upgrade (e) front door. construct ada toilet room & install automatic push button operator for front door. all work at g/f (674 sacramento st).Details
upgrade (e) front door. construct ada toilet room & install automatic push button operator for front door. all work at g/f (674 sacramento st). | $22,000 |
| Jun 24, 2020 | Completed final sign-off Jun 2021 | 265 Lee Av | unit 267 2nd flr: add 1 full bathroom, remodel (e) kitchen and bathroom, replace bathtub with shower. replace all windows. unit 265 1st flr: reconfiguration of existing unit from 1 bedroom, 1 full bathroom to 2 bedrooms, 2 full bathrooms. replace all windows, water heater & furnace.Details
unit 267 2nd flr: add 1 full bathroom, remodel (e) kitchen and bathroom, replace bathtub with shower. replace all windows. unit 265 1st flr: reconfiguration of existing unit from 1 bedroom, 1 full bathroom to 2 bedrooms, 2 full bathrooms. replace all windows, water heater & furnace. | $110,000 |
| Jan 13, 2020 | Completed final sign-off Jul 2020 | 132 Valmar Tr | exterior windows and door replacement front and rear elevation. all the windows including garage door and front entrance door, wood material. windows to be aluinum wood clad, same operation.Details
exterior windows and door replacement front and rear elevation. all the windows including garage door and front entrance door, wood material. windows to be aluinum wood clad, same operation. | $14,000 |
| Dec 9, 2019 | Expired or cancelled expired Jan 2025 | 132 Valmar Tr | to comply with complaint #201905058. interior finishing within building envelope. finish lighting, plbg, fixtures, trims, baseboard, switches, flooring, repainting. refinish backyard deck. fix concrete pavement for backyard, kitchen and bathroom remodel. new tiles and wall.Details
to comply with complaint #201905058. interior finishing within building envelope. finish lighting, plbg, fixtures, trims, baseboard, switches, flooring, repainting. refinish backyard deck. fix concrete pavement for backyard, kitchen and bathroom remodel. new tiles and wall. | $40,000 |
| Sep 19, 2019 | Completed final sign-off Jun 2020 | 132 Valmar Tr | comply with nov 201966311 - exterior stucco and wood siding repair and repaint.Details
comply with nov 201966311 - exterior stucco and wood siding repair and repaint. | $3,000 |
| Jun 27, 2019 | Completed final sign-off Jun 2020 | 1042 Divisadero St | remodel 3 bathrooms & add new bathroom; replace existing kitchen cabinet; install smoke detectors; install gas shut off valve; modify mep as neededDetails
remodel 3 bathrooms & add new bathroom; replace existing kitchen cabinet; install smoke detectors; install gas shut off valve; modify mep as needed | $38,000 |
| Jun 5, 2019 | Completed final sign-off May 2022 | 2481 Mission St | demo (e) millwork, walls and finishes. remove (e) equip & fixtures. new non struct partitions, new low wall, millwork, new equip, finishesDetails
demo (e) millwork, walls and finishes. remove (e) equip & fixtures. new non struct partitions, new low wall, millwork, new equip, finishes | $80,000 |
| Feb 8, 2019 | Never finaled issued Feb 2019, no final | 3251 20th Av | space 250j: revision to pa 201810233848. delete title 24 energy. all (e) lighting to remain. all (e) type 1 hood, kitchen grease exhaust fan to remainDetails
space 250j: revision to pa 201810233848. delete title 24 energy. all (e) lighting to remain. all (e) type 1 hood, kitchen grease exhaust fan to remain | |
| Nov 2, 2018 | Completed final sign-off Jan 2019 | 1730 Pacheco St | convert 1 full bathroom and 1/2 bathroom to 2 full bathroomsDetails
convert 1 full bathroom and 1/2 bathroom to 2 full bathrooms | $10,000 |
| Oct 23, 2018 | Completed final sign-off Feb 2019 | 3251 20th Av | suite 250 j. demo (e) millwork, new low wall and millwork, new equipment and finishesDetails
suite 250 j. demo (e) millwork, new low wall and millwork, new equipment and finishes | $70,000 |
| Aug 24, 2018 | Completed final sign-off Sep 2019 | 332 Clement St | commercial t.i. "mokuku" no change of use. new dining finishes, new non-structural partitions, new millwork, remodeled bar area and 2nd floor wait station, accessible restroom upgrades. no change to 3rd floor.Details
commercial t.i. "mokuku" no change of use. new dining finishes, new non-structural partitions, new millwork, remodeled bar area and 2nd floor wait station, accessible restroom upgrades. no change to 3rd floor. | $120,000 |
| Jul 24, 2018 | Never finaled issued Jul 2018, no final | 332 Clement St | demo existing millwork. non-structural partitionsDetails
demo existing millwork. non-structural partitions | $3,000 |
| Jul 25, 2017 | Completed final sign-off Mar 2018 | 265 Hester Av | 1st fl: relocate bath, convert storage to office and media, and two alum slider windows and wood door on first floor, rear only. (n) wd siding to match (e) wd sidings. - patchwork only.Details
1st fl: relocate bath, convert storage to office and media, and two alum slider windows and wood door on first floor, rear only. (n) wd siding to match (e) wd sidings. - patchwork only. | $60,000 |
| Feb 24, 2017 | Completed final sign-off Dec 2017 | 1522 19th Av | remodel (e) kitchen, bathroom & add one new bathroom at 2nd floor. legalize two bedrooms, office, laundry & two full bathroom at ground floor. n/a maher ordinanceDetails
remodel (e) kitchen, bathroom & add one new bathroom at 2nd floor. legalize two bedrooms, office, laundry & two full bathroom at ground floor. n/a maher ordinance | $72,000 |
| Sep 9, 2016 | Completed final sign-off Feb 2017 | 1025 Market St | exterior lighting installation; 6 exterior lights on market street. 2 exterior lights on stevenson street. maher n/aDetails
exterior lighting installation; 6 exterior lights on market street. 2 exterior lights on stevenson street. maher n/a | $10,000 |
| Sep 7, 2016 | Completed final sign-off Apr 2017 | 1159 Hyde St | soft story retrofit, comply with sfbc chapter 34b, calculations based on iebc appendix a-4Details
soft story retrofit, comply with sfbc chapter 34b, calculations based on iebc appendix a-4 | $45,555 |