Bearing Custom Construction
- Based in
- Carmichael
- On San Francisco permits
- Feb 2022 to Dec 2022
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2022 | Never finaled issued Dec 2022, no final | 710 Funston Av | repairing dryrot around (3) front windows. in kind replacement of 3 wood window at the bottom of arch portion of the windows. street facing non structural =70sfDetails
repairing dryrot around (3) front windows. in kind replacement of 3 wood window at the bottom of arch portion of the windows. street facing non structural =70sf | $380,000 |
| Feb 15, 2022 | Completed final sign-off Sep 2022 | 640 Rivera St | replace (4) windows and french door like to like due to leakage. front of house. aluminum clad/wood, double hung, u factor = 0.3 maxDetails
replace (4) windows and french door like to like due to leakage. front of house. aluminum clad/wood, double hung, u factor = 0.3 max | $40,000 |