Bdc Baird Development And Construction I
- Based in
- San Ramon
- On San Francisco permits
- Feb 2024 to Dec 2024
- Last 24 months
- 1 permit filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2024 | Completed final sign-off May 2025 | 2356 15th St | replace 7 front facing windows with aluminum wood clad windows. stucco repair around windows dry rot repair at front in kindDetails
replace 7 front facing windows with aluminum wood clad windows. stucco repair around windows dry rot repair at front in kind | $6,500 |
| May 17, 2024 | Completed final sign-off May 2025 | 2356 15th St | remove upper floor interior walls to open up the floor plan. new deck at rear of house. new bathroom on 2nd floor.Details
remove upper floor interior walls to open up the floor plan. new deck at rear of house. new bathroom on 2nd floor. | $83,000 |
| Feb 21, 2024 | Completed final sign-off May 2025 | 2356 15th St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $36,000 |