Bay Area Design & Construction
- Based in
- Los Gatos
- On San Francisco permits
- Apr 2010 to Nov 2015
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2015 | Completed final sign-off Aug 2016 | 3211 Baker St | as built drawing. minor framing altertions during construction. maher not reqDetails
as built drawing. minor framing altertions during construction. maher not req | |
| Oct 2, 2015 | Never finaled issued Oct 2015, no final | 3211 Baker St | street spaceDetails
street space | |
| Jul 1, 2015 | Never finaled issued Jul 2015, no final | 183 Saint Germain Av | interior remodel of existing single family residence: remodeling existing kitchen, powder room & bar. remodeling (e) master bath, addition of 2 skylights.Details
interior remodel of existing single family residence: remodeling existing kitchen, powder room & bar. remodeling (e) master bath, addition of 2 skylights. | $97,000 |
| Oct 22, 2014 | Completed final sign-off Aug 2016 | 3211 Baker St | full interior remodel to 1st and 2nd floors. work to include rear bay windos and partial well infills. replace all windows on front facade w/new wood sash units. maher not required.Details
full interior remodel to 1st and 2nd floors. work to include rear bay windos and partial well infills. replace all windows on front facade w/new wood sash units. maher not required. | $180,000 |
| May 15, 2014 | Completed final sign-off Aug 2016 | 3211 Baker St | as per plans &spec rev dated 10/7/14: site permit-hori ext w/ roof deck & infill at 2/f--maher- compliance with ordinance no. 155-13 not required.Details
as per plans &spec rev dated 10/7/14: site permit-hori ext w/ roof deck & infill at 2/f--maher- compliance with ordinance no. 155-13 not required. | $250,000 |
| Feb 20, 2013 | Completed final sign-off Dec 2013 | 419 Bright St | master suite in the garage. master bedroom, bathroom, laundry, closets. groud floor slab to be lowered. new plumbing, elec , window replacementDetails
master suite in the garage. master bedroom, bathroom, laundry, closets. groud floor slab to be lowered. new plumbing, elec , window replacement | $45,000 |
| Nov 13, 2012 | Completed final sign-off Nov 2012 | 60 Longview Ct | replacing 2 retrofit window and aluminum(same kind) 6x5 and 8x5Details
replacing 2 retrofit window and aluminum(same kind) 6x5 and 8x5 | $2,800 |
| Apr 10, 2012 | Completed final sign-off Apr 2013 | 1089 Chestnut St | replacing all windows for same kind with no grids. it will be all wood windows (50) total. u factor less than or equal to 0.40.Details
replacing all windows for same kind with no grids. it will be all wood windows (50) total. u factor less than or equal to 0.40. | $52,000 |
| Jan 26, 2012 | Completed final sign-off Apr 2014 | 29 Chenery St | front bldg - relocate upstairs bathrooms and master bedroom. kitchen remodel, window site changes, 3 new window openings, infill lightwell. skylights in bathrooms.Details
front bldg - relocate upstairs bathrooms and master bedroom. kitchen remodel, window site changes, 3 new window openings, infill lightwell. skylights in bathrooms. | $110,000 |
| Jan 23, 2012 | Completed final sign-off May 2012 | 1439 Page St | remodeling kitchen including installing cabinet and counter top. outlets and flooring. remodeling master bathroom. remodeling toilet room and adding a small sink.Details
remodeling kitchen including installing cabinet and counter top. outlets and flooring. remodeling master bathroom. remodeling toilet room and adding a small sink. | $35,000 |
| Nov 8, 2011 | Completed final sign-off Apr 2013 | 1089 Chestnut St | add a powder room to ktichen including a toilet & pedestal sink & light, outlet & vent on 2nd floor. extend roof deck forward, replace iron railing with glass railing.Details
add a powder room to ktichen including a toilet & pedestal sink & light, outlet & vent on 2nd floor. extend roof deck forward, replace iron railing with glass railing. | $50,000 |
| Sep 12, 2011 | Completed final sign-off Oct 2011 | 66 Beaver St | replacing existing exterior wood stairs with same sizes and dimensions.Details
replacing existing exterior wood stairs with same sizes and dimensions. | $3,300 |
| Apr 23, 2010 | Expired or cancelled expired Nov 2011 | 2205 Sacramento St | install tile around bathtub. replacing extg bathtub with new in extg bathroomDetails
install tile around bathtub. replacing extg bathtub with new in extg bathroom | $10,000 |