Barber Construction
- Based in
- Escalon
- On San Francisco permits
- Feb 2006 to Sep 2026
- Last 24 months
- 2 permits filed
31 permits since 2000: 23 completed, 3 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2026 | In progress issued Sep 2026 | 2555 Ocean Av | revision to pa#: 202607084682; revision to sheet a2.1 showing rearrangment to restroom layout.Details
revision to pa#: 202607084682; revision to sheet a2.1 showing rearrangment to restroom layout. | |
| Jul 8, 2026 | In progress issued Aug 2026 | 2555 Ocean Av | tenant improvement for detnal office including non bearing partitions walls restrooms, ceiling and soffits, plumbing, and mechanical workDetails
tenant improvement for detnal office including non bearing partitions walls restrooms, ceiling and soffits, plumbing, and mechanical work | $300,000 |
| Jul 22, 2024 | In progress issued Jan 2025 | 2595 Folsom St | remodel of 2nd floor residential space. division of current single residential unit into 2 residential units. voluntary strengthening of 2nd story of building.Details
remodel of 2nd floor residential space. division of current single residential unit into 2 residential units. voluntary strengthening of 2nd story of building. | $125,000 |
| Aug 25, 2023 | Completed final sign-off Oct 2025 | 2595 Folsom St | tenant improvments for 1st flr dental office. voluntary seismic upgrade at the 1st story. hange of use from office to health service.Details
tenant improvments for 1st flr dental office. voluntary seismic upgrade at the 1st story. hange of use from office to health service. | $125,000 |
| Mar 4, 2021 | Completed final sign-off Apr 2022 | 2801 Folsom St | #201: interior t.i. of extg 1684 st office for a dental office. new mechanical room and closet downstairs.Details
#201: interior t.i. of extg 1684 st office for a dental office. new mechanical room and closet downstairs. | $170,000 |
| Jan 22, 2021 | Never finaled issued Feb 2021, no final | 2801 Folsom St | exploratory demo to gauge structure/hvac needs for suite #201 remove ceiling/grid. ab-017.Details
exploratory demo to gauge structure/hvac needs for suite #201 remove ceiling/grid. ab-017. | $1,000 |
| Aug 12, 2019 | Completed final sign-off Aug 2020 | 930 16th St | suite 910 & 920 - ti expansion of dental office. new non load bearing partition walls for reception area, 4 operatories, dental office & other support areasDetails
suite 910 & 920 - ti expansion of dental office. new non load bearing partition walls for reception area, 4 operatories, dental office & other support areas | $122,000 |
| Jun 10, 2019 | Never finaled issued Nov 2019, no final | 166 Geary St | mep's for pa 201902223569. maher n/a.Details
mep's for pa 201902223569. maher n/a. | |
| Apr 15, 2019 | Expired or cancelled cancelled Jan 2026 | 166 Geary St | revision to 201901110177 change door swing at restroomDetails
revision to 201901110177 change door swing at restroom | |
| Feb 22, 2019 | Completed final sign-off Nov 2022 | 166 Geary St | suite 1100: t.i. for dental office- non load bearing partitions, ceilings, furnishes. mep deferred.Details
suite 1100: t.i. for dental office- non load bearing partitions, ceilings, furnishes. mep deferred. | $209,220 |
| Jan 11, 2019 | Never finaled issued Apr 2019, no final | 166 Geary St | 11th fl - accessibility improvement. work includes demo existing toilet at 11th fl & construct unisex accessible toilet. remove (e) handrail & add new handrail per cbc 2016. mech, electrical, plumbing will be design buildDetails
11th fl - accessibility improvement. work includes demo existing toilet at 11th fl & construct unisex accessible toilet. remove (e) handrail & add new handrail per cbc 2016. mech, electrical, plumbing will be design build | $35,000 |
| Jun 28, 2017 | Completed final sign-off May 2018 | 36 Monterey Bl | build new dental office. sterile lab, operatories, reception, waiting room, office. new non-bearing walls, new gyp board ceiling, no exterior work.Details
build new dental office. sterile lab, operatories, reception, waiting room, office. new non-bearing walls, new gyp board ceiling, no exterior work. | $70,000 |
| Mar 1, 2017 | Completed final sign-off Sep 2017 | 930 16th St | g/f -new improvement for new dental office including non-bearing walls, operatories, dr office/restroom/support areasDetails
g/f -new improvement for new dental office including non-bearing walls, operatories, dr office/restroom/support areas | $147,700 |
| Aug 17, 2016 | Completed final sign-off Oct 2017 | 109 Stevenson St | construct tenant improvement of new dental office creating new non-bearing partition walls, operatories, doctors office & related support areas with new gypsum board ceiling/soffits plus 1 ada accessible restroom/no medical gas piping. maher naDetails
construct tenant improvement of new dental office creating new non-bearing partition walls, operatories, doctors office & related support areas with new gypsum board ceiling/soffits plus 1 ada accessible restroom/no medical gas piping. maher na | $140,000 |
| Jan 6, 2016 | Completed final sign-off Apr 2016 | 490 Post St | unit #1135: modification of lighting fixture to minimize wattage usage per allowable title 24 interior lighting compliances. revision to original permit #201511172830. n/a for maherDetails
unit #1135: modification of lighting fixture to minimize wattage usage per allowable title 24 interior lighting compliances. revision to original permit #201511172830. n/a for maher | |
| Nov 17, 2015 | Completed final sign-off Jun 2017 | 490 Post St | electrical lighting reduction. title 24 modification. revision for pa#201507151577Details
electrical lighting reduction. title 24 modification. revision for pa#201507151577 | |
| Oct 23, 2015 | Completed final sign-off Jun 2017 | 490 Post St | revision to pa 2015-0715-1577, electrical indoor lighting revision 3, added duplex receptacles, interior lighting fixture revision 3. n/a ordinance #155-13Details
revision to pa 2015-0715-1577, electrical indoor lighting revision 3, added duplex receptacles, interior lighting fixture revision 3. n/a ordinance #155-13 | $500 |
| Sep 9, 2015 | Completed final sign-off Jun 2017 | 490 Post St | #1135: ti for architectural office with minor electrical work included everything is accessible. maher naDetails
#1135: ti for architectural office with minor electrical work included everything is accessible. maher na | $56,000 |
| Sep 1, 2015 | Completed final sign-off Jun 2016 | 698 Vermont St | tenant finish out of interior improvements for a dental office facility w/5 operatories/business office/reception area.Details
tenant finish out of interior improvements for a dental office facility w/5 operatories/business office/reception area. | $80,000 |
| Jul 15, 2015 | Completed final sign-off Jun 2017 | 490 Post St | unit #1135: removing extg non-load bearing walls and ceiling construction and prepairing to recieve new paint and lighting ab-017 n/a for the maher. this scope is for demo onlyDetails
unit #1135: removing extg non-load bearing walls and ceiling construction and prepairing to recieve new paint and lighting ab-017 n/a for the maher. this scope is for demo only | $11,000 |
| Jun 11, 2015 | Completed final sign-off May 2018 | 220 Battery St | 2nd floor: mep work for appl. #2013.0313.2063. maher n/a.Details
2nd floor: mep work for appl. #2013.0313.2063. maher n/a. | |
| Mar 6, 2014 | Completed final sign-off Oct 2014 | 490 Post St | 7th floor suite 710 - construct tenant improvement for a new dental office including electrical, plumbing, mechnaical work. not include any sturctural work. compliance with ordinance #155-13 not requiredDetails
7th floor suite 710 - construct tenant improvement for a new dental office including electrical, plumbing, mechnaical work. not include any sturctural work. compliance with ordinance #155-13 not required | $119,610 |
| Mar 13, 2013 | Never finaled issued Feb 2015, no final | 220 Battery St | 2nd floor:new partition walls, fixutres, finishes and ada compliant restroom. mechanical, electrical, plmg, and life safety engineering to be performed as required on a design/build basis and shall be submitted as part of a seperate permit shell and core improvements under permit #201205301433.Details
2nd floor:new partition walls, fixutres, finishes and ada compliant restroom. mechanical, electrical, plmg, and life safety engineering to be performed as required on a design/build basis and shall be submitted as part of a seperate permit shell and core improvements under permit #201205301433. | $148,025 |
| Sep 4, 2012 | Completed final sign-off Sep 2013 | 2901 Clement St | change of use from vacant gym to dental office -tenant improvement, new non load bearing partitoin walls, suspended ceiling, plumbing sinks, toielets, electrical lighting and power and hvac and distributionDetails
change of use from vacant gym to dental office -tenant improvement, new non load bearing partitoin walls, suspended ceiling, plumbing sinks, toielets, electrical lighting and power and hvac and distribution | $120,000 |
| Nov 29, 2010 | Completed final sign-off Apr 2011 | 3932 24th St | t.i for change of use, from m-retail to b-dental office. tenant improvement for dental office non load bearing partitions, ceiling, finishing. sprinklers, fire alarm and nitrius system separate permits- sffd permit requiredDetails
t.i for change of use, from m-retail to b-dental office. tenant improvement for dental office non load bearing partitions, ceiling, finishing. sprinklers, fire alarm and nitrius system separate permits- sffd permit required | $200,000 |
| Nov 3, 2010 | Completed final sign-off Jan 2011 | 3932 24th St | demolition of interior partitions, per ab-017Details
demolition of interior partitions, per ab-017 | $2,000 |
| Mar 17, 2009 | Completed final sign-off Oct 2010 | 614 Irving St | converting a tv repair shop into a dental office. adding (3) windows @ the rear. install (2) ada compliant restrooms. cu-hearing case #2008-1408c was approved to change use to a dental office.Details
converting a tv repair shop into a dental office. adding (3) windows @ the rear. install (2) ada compliant restrooms. cu-hearing case #2008-1408c was approved to change use to a dental office. | $96,000 |
| Sep 27, 2007 | Completed final sign-off Mar 2008 | 685 Commercial St | install new central heating for 1st floor. ref appl #200607176723.Details
install new central heating for 1st floor. ref appl #200607176723. | $10,000 |
| Sep 7, 2006 | Completed final sign-off Oct 2006 | 3535 Balboa St | add fire alarm device to existing system. remove device from restroom. this application pertains to fire device for the dental t.i. only. change to appl#200602104369Details
add fire alarm device to existing system. remove device from restroom. this application pertains to fire device for the dental t.i. only. change to appl#200602104369 | $200 |
| Jul 17, 2006 | Completed final sign-off Mar 2008 | 685 Commercial St | tenant improvement interior non-bearing walls, electrical & plumbing work. remodel (e) restroom. modify existing entry to comply ith t-24/adaDetails
tenant improvement interior non-bearing walls, electrical & plumbing work. remodel (e) restroom. modify existing entry to comply ith t-24/ada | $130,000 |
| Feb 27, 2006 | Completed final sign-off Oct 2006 | 3535 Balboa St | tenant improvement work.Details
tenant improvement work. | $45,000 |