Baker's Floor & Surface
- Based in
- San Mateo
- On San Francisco permits
- Nov 2023 to Nov 2023
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 8, 2023 | Completed final sign-off Nov 2024 | 345 Arguello Bl | all cracks and dryrot will be filled with epoxy filler, install an epoxy prime coat, allow to dry install abody coat, install a epoxy grout coat followed by a top coat, epoxy floring located in internal staircasesDetails
all cracks and dryrot will be filled with epoxy filler, install an epoxy prime coat, allow to dry install abody coat, install a epoxy grout coat followed by a top coat, epoxy floring located in internal staircases | $40,000 |