Backbone Builders Inc
- Based in
- Fairfield
- On San Francisco permits
- Aug 2025 to Jan 2026
- Last 24 months
- 4 permits filed
4 permits since 2000: 3 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 6, 2026 | Completed final sign-off Mar 2026 | 1855 Sacramento St | revise pa#202511260517 to include 1) the relocation(approx.8") direction of door swing to the bathroom door; 2) relocation (approx.4") of the adjacent closet wall, both to accommodate field conditions.Details
revise pa#202511260517 to include 1) the relocation(approx.8") direction of door swing to the bathroom door; 2) relocation (approx.4") of the adjacent closet wall, both to accommodate field conditions. | $1,200 |
| Dec 29, 2025 | Completed final sign-off Apr 2026 | 2208 Mission St | remodel existing 6' x 8' bathroom. plumbing: shower rough in 60" x 32" (remove tub), install shower, new vanity. electrical: replace (e) outlets and switchesDetails
remodel existing 6' x 8' bathroom. plumbing: shower rough in 60" x 32" (remove tub), install shower, new vanity. electrical: replace (e) outlets and switches | $20,000 |
| Nov 26, 2025 | Completed final sign-off Mar 2026 | 1855 Sacramento St | unit #3: remodel existing 5.5 ftx8 ft bathroom in kind, frame l shaped vanity wall, furring strip for ceiling, plumbing: shower rough in 51" x 36" (remove tub), install shower pan, install vanity, electric: 2 new gfci circuit, switches/receptacles, 2-3 interior recessed lights, install exhaust fan.Details
unit #3: remodel existing 5.5 ftx8 ft bathroom in kind, frame l shaped vanity wall, furring strip for ceiling, plumbing: shower rough in 51" x 36" (remove tub), install shower pan, install vanity, electric: 2 new gfci circuit, switches/receptacles, 2-3 interior recessed lights, install exhaust fan. | $36,500 |
| Aug 22, 2025 | In progress issued Dec 2025 | 1612 Kirkham St | in kind remodel of (1) bathroom, remodel 2 kitchens with minor layout changes. remove 2 non bearing walls and 2 fireplaces. widen 2 door openings. install 2 bathroom exhaust fans. replace 6 lights fixtures. reconfigure (e) laundry areaDetails
in kind remodel of (1) bathroom, remodel 2 kitchens with minor layout changes. remove 2 non bearing walls and 2 fireplaces. widen 2 door openings. install 2 bathroom exhaust fans. replace 6 lights fixtures. reconfigure (e) laundry area | $74,000 |