B C W Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2011 to Dec 2019
- Last 24 months
- 0 permits filed
33 permits since 2000: 28 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2019 | Never finaled issued Dec 2019, no final | 432 Holyoke St | repair approx 60 sq ft damaged concrete slab at the garage. replace a damage window at left side of the house, same size. repair 50 sf damaged siding around the window, repair 50 sf damage drywall at the garage. non structural facing.Details
repair approx 60 sq ft damaged concrete slab at the garage. replace a damage window at left side of the house, same size. repair 50 sf damaged siding around the window, repair 50 sf damage drywall at the garage. non structural facing. | $6,500 |
| Dec 16, 2019 | Never finaled issued Dec 2019, no final | 1225 Mendell St | comply with nov 201929561. repair front exterior entrance terrazo stairs less than 10 percent. repair drainage pipe at rear of bulding below window.Details
comply with nov 201929561. repair front exterior entrance terrazo stairs less than 10 percent. repair drainage pipe at rear of bulding below window. | $3,000 |
| Sep 27, 2019 | Completed final sign-off Oct 2019 | 24 Castle Manor Av | comply with nov 201982911 repair damage from car collision on south side of house wall. approx 4 ft of wall.Details
comply with nov 201982911 repair damage from car collision on south side of house wall. approx 4 ft of wall. | $1,000 |
| Jul 26, 2019 | Completed final sign-off Aug 2019 | 69 Palm Av | relocate (e) jb from inside the basement to (ext) for units 1-2-3-4. cover with 5/8in type x sheet rock, approx 25sf. replce a hose bib. non-street fcing.Details
relocate (e) jb from inside the basement to (ext) for units 1-2-3-4. cover with 5/8in type x sheet rock, approx 25sf. replce a hose bib. non-street fcing. | $1,000 |
| Oct 1, 2018 | Completed final sign-off May 2019 | 712 Girard St | kitchen remodel, no change in walls/openings/layoutDetails
kitchen remodel, no change in walls/openings/layout | $10,000 |
| Oct 6, 2017 | Completed final sign-off Jan 2018 | 1415 28th Av | install (n) hardwood floor. remodel existing kitchen and bath, same location. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
install (n) hardwood floor. remodel existing kitchen and bath, same location. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $12,000 |
| Mar 18, 2016 | Completed final sign-off Jun 2016 | 101 Tiffany Av | bathroom remodeling. no structure changeDetails
bathroom remodeling. no structure change | $5,000 |
| Feb 1, 2016 | Completed final sign-off Nov 2017 | 806 39th Av | 1/f- add one power, relocate kitchen, dining room, living room, 2/f- add 2 full bath, turn (e) living room into office, combine two (e) bathroom into one master bedroom, add one bedroom, remodel (e) full bath, relocate interior stair, in fill & match (e) lightwell.Details
1/f- add one power, relocate kitchen, dining room, living room, 2/f- add 2 full bath, turn (e) living room into office, combine two (e) bathroom into one master bedroom, add one bedroom, remodel (e) full bath, relocate interior stair, in fill & match (e) lightwell. | $70,000 |
| Jan 15, 2016 | Completed final sign-off Feb 2016 | 682 Madrid St | revision to pa 2013-0325-2975 enclosed windows on north side of the building as per plan. create a hallway on the existing family room.Details
revision to pa 2013-0325-2975 enclosed windows on north side of the building as per plan. create a hallway on the existing family room. | |
| Dec 7, 2015 | Completed final sign-off Dec 2015 | 930 Huron Av | stucco and dry rot repair at front below window sills and side of stair.Details
stucco and dry rot repair at front below window sills and side of stair. | $1,000 |
| Jul 1, 2015 | Completed final sign-off Feb 2016 | 682 Madrid St | to complete work and obtain final inspection for work approved under pa # 201303252975.Details
to complete work and obtain final inspection for work approved under pa # 201303252975. | $18,000 |
| Jun 30, 2015 | Completed final sign-off Jul 2015 | 401 Felton St | repair stucco work approx. 90 sf at the front of house - ground floor right side of garage to comply with complaint #201553931.Details
repair stucco work approx. 90 sf at the front of house - ground floor right side of garage to comply with complaint #201553931. | $500 |
| May 27, 2015 | Completed final sign-off Sep 2015 | 285 Paris St | comply to issued appn 201411141505, revision add 8 ft hallway at the kitchen area per plan, 3rd flr hallway add a closet per plan.Details
comply to issued appn 201411141505, revision add 8 ft hallway at the kitchen area per plan, 3rd flr hallway add a closet per plan. | |
| May 27, 2015 | Completed final sign-off Jul 2015 | 1711 26th Av | replace kitchen cabinets, replace kitchen & bath floor tiles,repl bathrm & bedrms doors and remove carpet, install hardwood floor at the 2nd flr.Details
replace kitchen cabinets, replace kitchen & bath floor tiles,repl bathrm & bedrms doors and remove carpet, install hardwood floor at the 2nd flr. | $8,000 |
| Nov 14, 2014 | Completed final sign-off Sep 2015 | 285 Paris St | remodel basement, bedrooms and bathroom per plan. 1st fl: remodel and upgrade per plan. 2nd fl: remodel and add a (n) bathroom per plan. 9 windows replacement. dh in front for the house.Details
remodel basement, bedrooms and bathroom per plan. 1st fl: remodel and upgrade per plan. 2nd fl: remodel and add a (n) bathroom per plan. 9 windows replacement. dh in front for the house. | $55,000 |
| Oct 14, 2014 | Never finaled issued Nov 2014, no final | 930 Huron Av | 1st flr remodel: add one new guest room, one family room, one bathroom, one office room, 2 storage. 2nd flr: add a rear new deck with a stairway.Details
1st flr remodel: add one new guest room, one family room, one bathroom, one office room, 2 storage. 2nd flr: add a rear new deck with a stairway. | $40,000 |
| Sep 24, 2014 | Completed final sign-off Feb 2016 | 2226 40th Av | comply w/complaint #201490571: legalize existing wood deck at back of house, to provide 1-hr fire rated wall & guardrailing. legalize 1st floor bedrooms & bathroom per plan.Details
comply w/complaint #201490571: legalize existing wood deck at back of house, to provide 1-hr fire rated wall & guardrailing. legalize 1st floor bedrooms & bathroom per plan. | $38,000 |
| Sep 24, 2014 | Completed final sign-off Jan 2015 | 151 Tucker Av | 1st flr, repair sheetrock walls & ceiling and provide insulation as per plan. 2/f, modify existing closet to sliding door for 2 bedrooms as per plan.Details
1st flr, repair sheetrock walls & ceiling and provide insulation as per plan. 2/f, modify existing closet to sliding door for 2 bedrooms as per plan. | $5,000 |
| Jul 1, 2014 | Completed final sign-off Jan 2015 | 151 Tucker Av | replace 4 windows in kind at the back of the house, 3 windows at the left side, repair stair less 50% on the left side of the house, repair damage concrete int he garage, remove tile & hood at the kitchen & bath 2 fl. all repairs in kind.Details
replace 4 windows in kind at the back of the house, 3 windows at the left side, repair stair less 50% on the left side of the house, repair damage concrete int he garage, remove tile & hood at the kitchen & bath 2 fl. all repairs in kind. | $4,500 |
| May 21, 2014 | Completed final sign-off Nov 2014 | 1776 Sloat Bl | remodel existing family room, half bathroom with new bedrooms & (n) bathroom per plan.Details
remodel existing family room, half bathroom with new bedrooms & (n) bathroom per plan. | $35,000 |
| Apr 9, 2014 | Completed final sign-off Oct 2015 | 570 28th Av | remodel basement to create new guest w/a new spiral stair connecting to upper floor. remodel 1st floor (e) family room, legalize bathroom & add new stair connecting to 2nd floor.Details
remodel basement to create new guest w/a new spiral stair connecting to upper floor. remodel 1st floor (e) family room, legalize bathroom & add new stair connecting to 2nd floor. | $25,000 |
| Mar 6, 2014 | Completed final sign-off Apr 2014 | 647 39th Av | comply with order# 105502-a complaint #201386709 remove illegal unit downstairs.Details
comply with order# 105502-a complaint #201386709 remove illegal unit downstairs. | $2,000 |
| Nov 21, 2013 | Never finaled issued Feb 2014, no final | 570 28th Av | relocate kitchens, convert (e) kitchen space to study, new furnace and water heater on all four units.Details
relocate kitchens, convert (e) kitchen space to study, new furnace and water heater on all four units. | $48,000 |
| Oct 28, 2013 | Completed final sign-off Apr 2014 | 182 Tucker Av | fire damage repairs in kind, restoration & remodel per plans.Details
fire damage repairs in kind, restoration & remodel per plans. | $95,000 |
| Aug 13, 2013 | Completed final sign-off Oct 2014 | 519 Brunswick St | repair sideings at left side and back of house, 200 sq.ft of siding not visible from streetDetails
repair sideings at left side and back of house, 200 sq.ft of siding not visible from street | $500 |
| Jul 25, 2013 | Completed final sign-off Jan 2014 | 525 Garfield St | ground floor remodel. remodel extg garage to one car garage, one storage, one new playroom, and one new bathroom.Details
ground floor remodel. remodel extg garage to one car garage, one storage, one new playroom, and one new bathroom. | $28,000 |
| Mar 25, 2013 | Expired or cancelled expired Feb 2016 | 682 Madrid St | basement interior remodel. add a family room and a full bath per plan.Details
basement interior remodel. add a family room and a full bath per plan. | $16,800 |
| Jan 17, 2013 | Completed final sign-off Mar 2013 | 2462 35th Av | comply with nov# 201268721-remove illegal kitchen on ground floor level.Details
comply with nov# 201268721-remove illegal kitchen on ground floor level. | $1,000 |
| Jan 14, 2013 | Completed final sign-off Mar 2013 | 2462 35th Av | to obtain final inspection for work approved under pa #2009.0515.8467. all work is complete.Details
to obtain final inspection for work approved under pa #2009.0515.8467. all work is complete. | |
| Dec 19, 2012 | Completed final sign-off Sep 2013 | 103 Dwight St | revision per plan under bpa #201106218636. as built revision and no exterior changes.Details
revision per plan under bpa #201106218636. as built revision and no exterior changes. | |
| Jun 22, 2012 | Completed final sign-off Sep 2012 | 38 Pope St | to comply with complaint #201123801 and #201129662 per plan. front building legalize to new bedroom and bathroom. rear building revert back to storage room; remove illegal unit in the backDetails
to comply with complaint #201123801 and #201129662 per plan. front building legalize to new bedroom and bathroom. rear building revert back to storage room; remove illegal unit in the back | $10,000 |
| Apr 30, 2012 | Completed final sign-off Mar 2014 | 432 Holyoke St | 2-story rear addition. 1st floor: (n) play room & bath. 2nd floor: (n) bedroom & baths.Details
2-story rear addition. 1st floor: (n) play room & bath. 2nd floor: (n) bedroom & baths. | $165,000 |
| Jun 21, 2011 | Completed final sign-off Sep 2013 | 103 Dwight St | addition on side of existing property, 1/fl new garage. 2/fl (n) kitchen, living room, dining room and bathroom. 3/fl bedrooms, and baths.Details
addition on side of existing property, 1/fl new garage. 2/fl (n) kitchen, living room, dining room and bathroom. 3/fl bedrooms, and baths. | $180,000 |