B C Construction
- Based in
- Oakland
- On San Francisco permits
- Feb 2001 to Mar 2010
- Last 24 months
- 0 permits filed
13 permits since 2000: 9 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2010 | Never finaled issued Mar 2010, no final | 170 Pacific Av | unit #15-interior remodeling-relocate coat closet in the foyer, expand kitchen, new cabinets, appliances & new configuration. patch & repair adjacent surfaces, paint, refinish floors. no structural work- sprinklers separate permit.Details
unit #15-interior remodeling-relocate coat closet in the foyer, expand kitchen, new cabinets, appliances & new configuration. patch & repair adjacent surfaces, paint, refinish floors. no structural work- sprinklers separate permit. | $30,000 |
| Mar 25, 2009 | Completed final sign-off Mar 2009 | 955 North Point St | pressure grout the soil under the west perimeter walls foundation to the height matching the new foundation of lot 13. excavation for the new foundation can be done in 20'-0" section (front, rear and middle)Details
pressure grout the soil under the west perimeter walls foundation to the height matching the new foundation of lot 13. excavation for the new foundation can be done in 20'-0" section (front, rear and middle) | $5,000 |
| Mar 25, 2009 | Completed final sign-off Mar 2009 | 965 North Point St | pressure grout the soil under the east perimeter walls foundation to the height matching the new foundation of lot 13. excavation for new foundation will be about 20'0" per section (front and rear, then the middle)Details
pressure grout the soil under the east perimeter walls foundation to the height matching the new foundation of lot 13. excavation for new foundation will be about 20'0" per section (front and rear, then the middle) | $5,000 |
| Oct 12, 2006 | Completed final sign-off Jun 2010 | 963 North Point St | erect 3 stories 2 dwelling units @ frontDetails
erect 3 stories 2 dwelling units @ front | $636,460 |
| Feb 24, 2006 | Never finaled issued Feb 2006, no final | 68 12th St | oti-1, 2nd floor, el, me, ls, sp.Details
oti-1, 2nd floor, el, me, ls, sp. | $85,985 |
| Feb 24, 2006 | Never finaled issued Mar 2006, no final | 68 12th St | oti-1, 1st floor, el, me, ls, sp.Details
oti-1, 1st floor, el, me, ls, sp. | $115,000 |
| Jan 13, 2006 | Never finaled issued Jan 2006, no final | 68 12th St | non structural interior demolition on 1st & 50% of 2nd floors. defered d.a per ab-017Details
non structural interior demolition on 1st & 50% of 2nd floors. defered d.a per ab-017 | $4,000 |
| Oct 18, 2004 | Completed final sign-off Sep 2005 | 58 Collingwood St | minor room reconfiguration.no change in bldg. structure,size/shape.3/f-retain (e)bedroom reduce sizeDetails
minor room reconfiguration.no change in bldg. structure,size/shape.3/f-retain (e)bedroom reduce size | |
| Jan 15, 2004 | Completed final sign-off Feb 2004 | 2930 Larkin St | renew 200303109198 for final inspection.Details
renew 200303109198 for final inspection. | |
| Dec 8, 2003 | Completed final sign-off Sep 2005 | 58 Collingwood St | raise (e) structure. remodel (e) home & add 2 floors below with 2 car garage & one unit on floors 1Details
raise (e) structure. remodel (e) home & add 2 floors below with 2 car garage & one unit on floors 1 | $550,000 |
| Aug 2, 2002 | Completed final sign-off Nov 2002 | 231 Sansome St | demo walls & ceiling of vacant office space to create open office space,construct nu conference rmDetails
demo walls & ceiling of vacant office space to create open office space,construct nu conference rm | $120,100 |
| Aug 2, 2002 | Completed final sign-off Feb 2004 | 2930 Larkin St | erect a four story two unit residential bldgDetails
erect a four story two unit residential bldg | $260,000 |
| Feb 6, 2001 | Completed final sign-off Jul 2001 | 2928 Larkin St | rev to previous apprvd permit 2000-12-06-7284Details
rev to previous apprvd permit 2000-12-06-7284 | $2,400 |