B & B Construction
- Based in
- Daly City
- On San Francisco permits
- Dec 2017 to May 2018
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2018 | Completed final sign-off Jun 2020 | 463 Amherst St | renovation of extg residence. expand residence into ground floor storage space behind and adjuacent to garage. residence to be reconfigured as 4 bed/2 baths. (n) window opening at front elevation.Details
renovation of extg residence. expand residence into ground floor storage space behind and adjuacent to garage. residence to be reconfigured as 4 bed/2 baths. (n) window opening at front elevation. | $42,000 |
| Dec 21, 2017 | Completed final sign-off Jun 2018 | 378 Harvard St | remodel (e) kitchen & (2) bathrooms & remove/replace (e) sheetrock w/new & re-wire electrical at 2nd fl. legalize (1) bedroom, (1) bathroom, & construct (1) new bedroom and media room at ground fl.Details
remodel (e) kitchen & (2) bathrooms & remove/replace (e) sheetrock w/new & re-wire electrical at 2nd fl. legalize (1) bedroom, (1) bathroom, & construct (1) new bedroom and media room at ground fl. | $58,000 |