B & B Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to May 2025
- Last 24 months
- 1 permit filed
40 permits since 2000: 35 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 2, 2025 | In progress issued May 2025 | 714 Bay St | revision to pa# 201709117669 : to clarify one-hour fire rating for exit passageway. (ref pa# 201709117668)Details
revision to pa# 201709117669 : to clarify one-hour fire rating for exit passageway. (ref pa# 201709117668) | |
| Aug 24, 2022 | Never finaled issued Sep 2023, no final | 3286 Mission St | barrier remediation at non-compliant sloped entry from street per below addition of power door opening, per da-04 for access on new entry in leiu of door pull clearance due to (e) concrete slope @ slabDetails
barrier remediation at non-compliant sloped entry from street per below addition of power door opening, per da-04 for access on new entry in leiu of door pull clearance due to (e) concrete slope @ slab | $15,000 |
| Jan 2, 2020 | Completed final sign-off Jan 2020 | 80 Crestline Dr | to obtain final inspection for work approved under pa 201601197398. all work is completeDetails
to obtain final inspection for work approved under pa 201601197398. all work is complete | |
| Dec 7, 2018 | Completed final sign-off Dec 2018 | 1043 Francisco St | to obtain final inspection for work approved under pa's 200806023436, 200402106005, 200911121032. all work is completeDetails
to obtain final inspection for work approved under pa's 200806023436, 200402106005, 200911121032. all work is complete | |
| Dec 7, 2018 | Completed final sign-off Dec 2018 | 1043 Francisco St | under pa 200402116206 & 200402116208 & 200811186854 all work is completeDetails
under pa 200402116206 & 200402116208 & 200811186854 all work is complete | |
| Dec 7, 2018 | Completed final sign-off Dec 2018 | 1043 Francisco St | to obtain final inspection for work approved under pa 201108293431, 201203216544, 201402128369. all work is completeDetails
to obtain final inspection for work approved under pa 201108293431, 201203216544, 201402128369. all work is complete | |
| Aug 3, 2018 | Completed final sign-off Aug 2018 | 80 Crestline Dr | to obtain final inspection for work approved under pa#201601197397. all work is completeDetails
to obtain final inspection for work approved under pa#201601197397. all work is complete | |
| May 9, 2018 | Completed final sign-off Aug 2018 | 80 Crestline Dr | replace windows at rear (east facing) units 11, 12, 13, 14. no structural. not visible from street. replace in-kind location, size max factor 0.32. stucco repair as needed (repair in-kind) 16 windows total.Details
replace windows at rear (east facing) units 11, 12, 13, 14. no structural. not visible from street. replace in-kind location, size max factor 0.32. stucco repair as needed (repair in-kind) 16 windows total. | $9,000 |
| Oct 18, 2017 | Completed final sign-off Jan 2020 | 80 Crestline Dr | recommencement & completion of work approved under pa #201601197398 (addition of unit) & #201601197397 (mandatory earthquake retrofit).Details
recommencement & completion of work approved under pa #201601197398 (addition of unit) & #201601197397 (mandatory earthquake retrofit). | $18,000 |
| Sep 11, 2017 | Completed final sign-off Apr 2025 | 714 Bay St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. ** maher: n/a **Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. ** maher: n/a ** | $50,000 |
| Sep 11, 2017 | Never finaled issued Dec 2022, no final | 714 Bay St | adu per ordinance# 162-16 on ground floor with 1 bedroom & 1 bathroom in each unit. add 1 powder room in staorge room. ** maher: n/a **Details
adu per ordinance# 162-16 on ground floor with 1 bedroom & 1 bathroom in each unit. add 1 powder room in staorge room. ** maher: n/a ** | $30,000 |
| Aug 28, 2017 | Completed final sign-off Aug 2018 | 80 Crestline Dr | #2, 4, 5- replace windows at rear of building in kind. no structural, 3 fixed windows & 3 sliding doors. replace stucco as needed, approx. 300 sq.ft. repair in kind, same size & same location. max u factor 0.32Details
#2, 4, 5- replace windows at rear of building in kind. no structural, 3 fixed windows & 3 sliding doors. replace stucco as needed, approx. 300 sq.ft. repair in kind, same size & same location. max u factor 0.32 | $9,000 |
| Apr 10, 2017 | Completed final sign-off Sep 2018 | 714 Bay St | kitchen/bath remodel; no walls to be moved.Details
kitchen/bath remodel; no walls to be moved. | $25,000 |
| Jan 24, 2017 | Completed final sign-off Dec 2017 | 80 Crestline Dr | replace windows at rear of building in kind. no structural. unit 3 & 6 (each unit 2 windows , 1 slidng door). replace / repair stucco as needed - 300 sf. u factor .32Details
replace windows at rear of building in kind. no structural. unit 3 & 6 (each unit 2 windows , 1 slidng door). replace / repair stucco as needed - 300 sf. u factor .32 | $7,500 |
| Jan 19, 2016 | Expired or cancelled expired Aug 2018 | 80 Crestline Dr | mandatory earthquake retrofiet of wood frame building per chap 34 b/section 3406b, #5 iebc appendix a4Details
mandatory earthquake retrofiet of wood frame building per chap 34 b/section 3406b, #5 iebc appendix a4 | $24,000 |
| Jan 19, 2016 | Expired or cancelled expired Jan 2020 | 80 Crestline Dr | addition of dwelling unit per ordinance no 30-15. in conjuction with mandatory seismic retrofitDetails
addition of dwelling unit per ordinance no 30-15. in conjuction with mandatory seismic retrofit | $50,000 |
| Nov 6, 2015 | Completed final sign-off Aug 2016 | 80 Crestline Dr | unit #1: remodel kitchen & bath.Details
unit #1: remodel kitchen & bath. | $19,000 |
| Jul 7, 2015 | Completed final sign-off Sep 2018 | 716 Bay St | one kitchen and one bath remodel. no wall to be altered or moved.Details
one kitchen and one bath remodel. no wall to be altered or moved. | $25,000 |
| Feb 13, 2015 | Completed final sign-off Aug 2015 | 80 Crestline Dr | #7 & #9- replace windows at rear of building, repair/replace stucco as neede, 4 windows (vinyl). & 2 sliding doors in-like kind. no structural work.Details
#7 & #9- replace windows at rear of building, repair/replace stucco as neede, 4 windows (vinyl). & 2 sliding doors in-like kind. no structural work. | $10,000 |
| Sep 4, 2014 | Completed final sign-off Mar 2015 | 80 Crestline Dr | replace windows @ building rear unit #8 & #10, repair/replace stucco as needed, approx. 300 sq. ft. 4 windows + 2 sliding doors. windows & doors replace in-kind, no structural work.Details
replace windows @ building rear unit #8 & #10, repair/replace stucco as needed, approx. 300 sq. ft. 4 windows + 2 sliding doors. windows & doors replace in-kind, no structural work. | $12,000 |
| Aug 6, 2014 | Completed final sign-off Jun 2015 | 80 Crestline Dr | apt #10. kitchen & bath remodel. no walls moved, removed or added. all fixtures and appliances layouts to remain unchanged.Details
apt #10. kitchen & bath remodel. no walls moved, removed or added. all fixtures and appliances layouts to remain unchanged. | $18,000 |
| Aug 6, 2014 | Completed final sign-off Aug 2015 | 80 Crestline Dr | apt #8. kitchen & bath remodel. no walls moved, removed or added. all fixtures and appliances layouts to remain unchanged.Details
apt #8. kitchen & bath remodel. no walls moved, removed or added. all fixtures and appliances layouts to remain unchanged. | $18,000 |
| Nov 22, 2013 | Completed final sign-off Dec 2014 | 80 Crestline Dr | #4: kitchen and bath remodel apt #4 only, no change of wall windows and door.Details
#4: kitchen and bath remodel apt #4 only, no change of wall windows and door. | $18,000 |
| Sep 11, 2013 | Completed final sign-off May 2015 | 80 Crestline Dr | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $18,000 |
| Aug 22, 2013 | Completed final sign-off Aug 2013 | 135 Dellbrook Av | reivision to permit ap#201207175079. change existing storage to media room (452 sq. ft.)Details
reivision to permit ap#201207175079. change existing storage to media room (452 sq. ft.) | |
| Sep 17, 2012 | Completed final sign-off Jun 2013 | 80 Crestline Dr | install garbage room in garage. install new water heater in garage. sealed off garbage chute doors at all levels w/ steel cap (type).Details
install garbage room in garage. install new water heater in garage. sealed off garbage chute doors at all levels w/ steel cap (type). | $20,000 |
| Jul 20, 2012 | Completed final sign-off Aug 2013 | 135 Dellbrook Av | revision 201207175079. to document proper layout on other side, incorrectly printed on previous permit.Details
revision 201207175079. to document proper layout on other side, incorrectly printed on previous permit. | |
| Jul 17, 2012 | Completed final sign-off Aug 2013 | 135 Dellbrook Av | revision to pa# 201205231083. revise kitchen plan @ ground floor. relocate existing water heater & (e) furnace at 1st floor. install new washer/dryer at 1st floor. repair dryrot at exterior wall.Details
revision to pa# 201205231083. revise kitchen plan @ ground floor. relocate existing water heater & (e) furnace at 1st floor. install new washer/dryer at 1st floor. repair dryrot at exterior wall. | $3,000 |
| May 23, 2012 | Completed final sign-off Aug 2013 | 135 Dellbrook Av | remodel kitchen, remodel bathroom, high efficacy lightingDetails
remodel kitchen, remodel bathroom, high efficacy lighting | $18,000 |
| Dec 2, 2011 | Completed final sign-off Mar 2012 | 80 Crestline Dr | #11- remodel kitchen & bathroom, no change on walls and opening.Details
#11- remodel kitchen & bathroom, no change on walls and opening. | $18,000 |
| Dec 2, 2011 | Completed final sign-off Apr 2012 | 80 Crestline Dr | #12- remodel kitchen & bathroom, no change on walls and opening.Details
#12- remodel kitchen & bathroom, no change on walls and opening. | $18,000 |
| Jun 17, 2011 | Completed final sign-off Aug 2011 | 80 Crestline Dr | replace kitchen cabinets, relace bath tub, relocate circuit panel out of closetDetails
replace kitchen cabinets, relace bath tub, relocate circuit panel out of closet | $9,000 |
| Jun 17, 2011 | Completed final sign-off Sep 2011 | 80 Crestline Dr | unit #3-replace kitchen cabinets, bath tub. relocate circuit panel out of clsoetDetails
unit #3-replace kitchen cabinets, bath tub. relocate circuit panel out of clsoet | $18,000 |
| May 12, 2011 | Completed final sign-off Mar 2012 | 80 Crestline Dr | relocate electrical panel, add supply & drains for additional washer & dryer, demolistion at ground floor (no structural) to start work on future utility room (later permit).Details
relocate electrical panel, add supply & drains for additional washer & dryer, demolistion at ground floor (no structural) to start work on future utility room (later permit). | $5,000 |
| Dec 6, 2010 | Completed final sign-off Aug 2011 | 716 Bay St | replace 9 windows like existing. not visable from street, tile kitchen & bathroom floor, resurface hardwood floors, no egress windows.Details
replace 9 windows like existing. not visable from street, tile kitchen & bathroom floor, resurface hardwood floors, no egress windows. | $3,000 |
| Apr 7, 2008 | Completed final sign-off Nov 2008 | 714 Bay St | work @ unit# 720 only. replace 5 windows & remove & replace approx 250 sq. ft. of siding due to dryrot. same size & location. not visible from street.Details
work @ unit# 720 only. replace 5 windows & remove & replace approx 250 sq. ft. of siding due to dryrot. same size & location. not visible from street. | $6,000 |
| May 10, 2007 | Completed final sign-off Nov 2008 | 720 Bay St | replace kchn cabinets:same at 720 bay. no new light. replace medicine cabinets in bathroom. no wndw on door work under this permitDetails
replace kchn cabinets:same at 720 bay. no new light. replace medicine cabinets in bathroom. no wndw on door work under this permit | $10,000 |
| Aug 15, 2005 | Completed final sign-off Sep 2005 | 716 Bay St | remove existing wall heater, inlarge opening and block drywall and to 1st new unit. install newDetails
remove existing wall heater, inlarge opening and block drywall and to 1st new unit. install new | $600 |
| Apr 4, 2001 | Completed final sign-off Nov 2001 | 714 Bay St | remove dryrot around bathtubs.install new tub, gfi circut, replace electrical service with 400 amp.Details
remove dryrot around bathtubs.install new tub, gfi circut, replace electrical service with 400 amp. | $1,600 |
| Sep 5, 2000 | Completed final sign-off Nov 2000 | 1420 Cabrillo St | install blocking between studs, install mud sil to foundationDetails
install blocking between studs, install mud sil to foundation | $930 |