Ayala's Color & Concepts***See Note***
- Based in
- San Francisco
- On San Francisco permits
- Aug 2023 to Jun 2026
- Last 24 months
- 6 permits filed
7 permits since 2000: 6 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Jul 2026 | 255 Capistrano Av | convert part of garage to create a media room, bathroom, and a closet; enlarge opening on exterior rear wall and add structural ply and holdownsDetails
convert part of garage to create a media room, bathroom, and a closet; enlarge opening on exterior rear wall and add structural ply and holdowns | $70,000 |
| Nov 4, 2025 | Completed final sign-off Mar 2026 | 111 Taylor St | 1st/f storage room: floor repairs, 16 ft by 18 ft, remove e) floor, reinforce & replace plywood base & lino flooringDetails
1st/f storage room: floor repairs, 16 ft by 18 ft, remove e) floor, reinforce & replace plywood base & lino flooring | $27,000 |
| Aug 13, 2025 | Completed final sign-off Nov 2025 | 5050 Mission St | store permit to operateDetails
store permit to operate | $2,000 |
| Mar 24, 2025 | Completed final sign-off Jun 2025 | 367 30th Av | remove approx 100 sf of brick veneer from first floor facade (front). replace with 1 x 10 " square to match (e) above.Details
remove approx 100 sf of brick veneer from first floor facade (front). replace with 1 x 10 " square to match (e) above. | $2,500 |
| Mar 24, 2025 | Completed final sign-off May 2025 | 420 29th Av | unit# 104: remove a 4' x 5' area of sheetrock counter area. replace the lower cabinet area with moisture barrier 5/8" type x sheetrock. replace insulation. reinstall lower cabinets in original location.Details
unit# 104: remove a 4' x 5' area of sheetrock counter area. replace the lower cabinet area with moisture barrier 5/8" type x sheetrock. replace insulation. reinstall lower cabinets in original location. | $800 |
| Mar 3, 2025 | Completed final sign-off Mar 2025 | 374 Moultrie St | replace siding on north wall of 374 moultrie st. not visible from street. approx 200 sq ft.Details
replace siding on north wall of 374 moultrie st. not visible from street. approx 200 sq ft. | $12,000 |
| Aug 25, 2023 | Completed final sign-off May 2024 | 595 Buckingham Wy | 4/f ste 444: tenant imrpovement of existing dental office, build new partitions, interior finish work, paint, & flr coverings, cabinetry, new plumb, new water and waste lines, vacuum and air lines, new electrical, lighting & power, new gyp board, & act ceiling. existing hvac system to remain.Details
4/f ste 444: tenant imrpovement of existing dental office, build new partitions, interior finish work, paint, & flr coverings, cabinetry, new plumb, new water and waste lines, vacuum and air lines, new electrical, lighting & power, new gyp board, & act ceiling. existing hvac system to remain. | $120,000 |