Axsis Construction
- Based in
- So. San Francisco
- On San Francisco permits
- May 2001 to Jan 2016
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 6, 2016 | Completed final sign-off Feb 2016 | 2090 12th Av | replace existing rear deck due to dry rot.Details
replace existing rear deck due to dry rot. | $10,000 |
| May 21, 2009 | Completed final sign-off Jul 2009 | 2090 12th Av | removal of (e0 cabinetry and replacement with new cabientry in same kitchen layout as original.Details
removal of (e0 cabinetry and replacement with new cabientry in same kitchen layout as original. | $27,510 |
| Jan 26, 2006 | Completed final sign-off Apr 2006 | 1687 41st Av | alter (e) bathroom, relocate tub drain,relocate toilet drain, new fixtures, faucets,new tile,new florescent lighting,fan exhaust 150 cfm. new sub panel for new circuits, raise ceiling to match existing 8'6" ht.Details
alter (e) bathroom, relocate tub drain,relocate toilet drain, new fixtures, faucets,new tile,new florescent lighting,fan exhaust 150 cfm. new sub panel for new circuits, raise ceiling to match existing 8'6" ht. | $10,000 |
| Feb 13, 2004 | Completed final sign-off Apr 2004 | 42 Richardson Av | kitchen alteration- all existing plumbing & electrical to remain- add one 100amp electrical panel- nDetails
kitchen alteration- all existing plumbing & electrical to remain- add one 100amp electrical panel- n | $35,000 |
| May 22, 2002 | Completed final sign-off Aug 2002 | 1687 41st Av | kitchen remodel, new cabs, drywall, countertops, plumbing, fixtures, appliances, flooring, paint, onDetails
kitchen remodel, new cabs, drywall, countertops, plumbing, fixtures, appliances, flooring, paint, on | $50,000 |
| Dec 12, 2001 | Completed final sign-off Mar 2002 | 177 Inverness Dr | remodel (e) bathroom & kitchen. bath-new fix. tile, raise ceiling @ tub area, new plumb.relocate skyDetails
remodel (e) bathroom & kitchen. bath-new fix. tile, raise ceiling @ tub area, new plumb.relocate sky | $30,000 |
| Aug 24, 2001 | Completed final sign-off Oct 2001 | 330 29th St | alteration of (e)bathrm,relocate (e)pedestal sinkDetails
alteration of (e)bathrm,relocate (e)pedestal sink | $10,000 |
| Jun 4, 2001 | Completed final sign-off Jan 2002 | 4455 23rd St | rev. to appl#200105149021Details
rev. to appl#200105149021 | $3,000 |
| May 14, 2001 | Completed final sign-off Jan 2002 | 4455 23rd St | bathroom alteration, new bathtub, tile, paint, faucets, sink, bath access., no plumbing drain movedDetails
bathroom alteration, new bathtub, tile, paint, faucets, sink, bath access., no plumbing drain moved | $8,000 |