Ault's Builders
- Based in
- Napa
- On San Francisco permits
- Feb 2014 to Feb 2014
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 24, 2014 | Completed final sign-off Apr 2014 | 1500 Bay St | remove tub, new shower valve, prep and tile new shower pan and walls in same location. modify (e) 5' wall by removing pocket door, re-locate (e) electrical in adjacent wall, new tile fooor in bathroom, change vanity cabinet, paint/sheetrock as reqd.Details
remove tub, new shower valve, prep and tile new shower pan and walls in same location. modify (e) 5' wall by removing pocket door, re-locate (e) electrical in adjacent wall, new tile fooor in bathroom, change vanity cabinet, paint/sheetrock as reqd. | $20,000 |