Atlas Constr& Dev. Dba:Good Fellas Const
- Based in
- Encino
- On San Francisco permits
- Jul 2013 to Feb 2018
- Last 24 months
- 0 permits filed
50 permits since 2000: 41 completed, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2018 | Completed final sign-off Feb 2018 | 3241 Mission St | unit 8: framing remodel work to replace structural beam due to dry rot in dining rm area.Details
unit 8: framing remodel work to replace structural beam due to dry rot in dining rm area. | $5,000 |
| Jan 26, 2018 | Completed final sign-off Mar 2018 | 1556 Jones St | complete bathroom remodel with wall removal and shower additionDetails
complete bathroom remodel with wall removal and shower addition | $8,000 |
| Dec 4, 2017 | Completed final sign-off Jan 2018 | 20 Westwood Dr | revision to pa 2017-1108-3537 relocate beam. revision of engineer plansDetails
revision to pa 2017-1108-3537 relocate beam. revision of engineer plans | |
| Nov 29, 2017 | Completed final sign-off Jan 2018 | 4711 18th St | kitchen remodel; demo & remove (e) light fixtures, cabinets, coutnertops, open walls as need to upgrade. install new drywall as needed to patch. add recessed lights; paint.Details
kitchen remodel; demo & remove (e) light fixtures, cabinets, coutnertops, open walls as need to upgrade. install new drywall as needed to patch. add recessed lights; paint. | $20,000 |
| Nov 13, 2017 | Completed final sign-off Jan 2018 | 20 Westwood Dr | bathroom like-like complete reminder. replace tile, new flooring, instsall new tub, shower pan & toilet. upgrade plumbing & electrical by code. no change to walls locations.Details
bathroom like-like complete reminder. replace tile, new flooring, instsall new tub, shower pan & toilet. upgrade plumbing & electrical by code. no change to walls locations. | $8,000 |
| Nov 13, 2017 | Completed final sign-off Feb 2018 | 37 Ashbury Tr | bathroom remodel in same location. demo entire bathroom to include pcking open house. remove all (e) & hard debris by code. pass all inspections by code. instal new tile for flooring walls, shower pans, install new showers system, install new vanity (sink) toilet, mirror & all finished materials.Details
bathroom remodel in same location. demo entire bathroom to include pcking open house. remove all (e) & hard debris by code. pass all inspections by code. instal new tile for flooring walls, shower pans, install new showers system, install new vanity (sink) toilet, mirror & all finished materials. | $8,000 |
| Nov 8, 2017 | Completed final sign-off Jan 2018 | 20 Westwood Dr | remodel kitchen, remove load bearing wall per engineer plans, upgrde eled, plumbing, mech to code, install flooring, new cabinets, countertops, replace kitchen windowDetails
remodel kitchen, remove load bearing wall per engineer plans, upgrde eled, plumbing, mech to code, install flooring, new cabinets, countertops, replace kitchen window | $25,000 |
| Oct 27, 2017 | Completed final sign-off May 2018 | 476 21st Av | upper unit - master bath- replace tiles flooring, new toilet & light fixtures, exchange new new fan w/ humidity sensor, paint (same location). powder room-replace floor tiles and paintDetails
upper unit - master bath- replace tiles flooring, new toilet & light fixtures, exchange new new fan w/ humidity sensor, paint (same location). powder room-replace floor tiles and paint | $7,500 |
| Oct 12, 2017 | Completed final sign-off Dec 2017 | 1263 14th Av | (1) bathroom remodeling, downstairs only. install new gfci outlet, new shower pan, new tiles, new shower valve, same location fixtures.Details
(1) bathroom remodeling, downstairs only. install new gfci outlet, new shower pan, new tiles, new shower valve, same location fixtures. | $7,000 |
| Oct 12, 2017 | Completed final sign-off Dec 2017 | 1263 14th Av | upgrade kitchen remodeling. make subpanel electrical for kitchen electric circuit and relocate gas stove. no walls to be relocated or removed.Details
upgrade kitchen remodeling. make subpanel electrical for kitchen electric circuit and relocate gas stove. no walls to be relocated or removed. | $9,000 |
| Jun 8, 2017 | Completed final sign-off Jun 2017 | 108 04th Av | to obtain a final inspection for work approved under pa# 201409196821 all work is completeDetails
to obtain a final inspection for work approved under pa# 201409196821 all work is complete | |
| Jun 2, 2017 | Expired or cancelled cancelled Jun 2017 | 2125 Bryant St | this is a reivision to permit application #201702179698; removing electrical scope of work. no electrical work was done. n/a maherDetails
this is a reivision to permit application #201702179698; removing electrical scope of work. no electrical work was done. n/a maher | |
| May 18, 2017 | Completed final sign-off Jul 2017 | 327 Hill St | remodel master and guest bathrooms: remove/replace like for like. tub/shower "temp doors. led recessed lights, update outlets to gfi's as needd, fans, flooring, paint, vanities, toilets. "no walls", no windows", "no structural work".Details
remodel master and guest bathrooms: remove/replace like for like. tub/shower "temp doors. led recessed lights, update outlets to gfi's as needd, fans, flooring, paint, vanities, toilets. "no walls", no windows", "no structural work". | $15,000 |
| Feb 17, 2017 | Completed final sign-off Jun 2017 | 2125 Bryant St | unit #308; replace outlets/lights/up to 2016 codes. remove and replace drywall in one room. no walls removed, no new walls.Details
unit #308; replace outlets/lights/up to 2016 codes. remove and replace drywall in one room. no walls removed, no new walls. | $10,000 |
| Jan 20, 2017 | Never finaled issued Jan 2017, no final | 35 Beideman St | master bathroom remodel; like for like; same layout; elec, mech, plumbing, fan, led lights, tub, vanityDetails
master bathroom remodel; like for like; same layout; elec, mech, plumbing, fan, led lights, tub, vanity | $11,000 |
| Jan 20, 2017 | Completed final sign-off Aug 2017 | 350 Church St | unit c -remodel bathroom & kitchen; like for like; same layout; ; no window ; no bearing walls. fan, lights, counter tops, flooringDetails
unit c -remodel bathroom & kitchen; like for like; same layout; ; no window ; no bearing walls. fan, lights, counter tops, flooring | $50,000 |
| May 12, 2016 | Never finaled issued May 2016, no final | 1001 Pine St | unit 512: bathroom remodel, in-kind; change shower pan, upgrade some electricalDetails
unit 512: bathroom remodel, in-kind; change shower pan, upgrade some electrical | $4,000 |
| Mar 28, 2016 | Completed final sign-off May 2016 | 425 01st St | replace (e) recessed lights (led, compliant); install new ceiling lights in kichen & bathroom; install like-for-like new shower.Details
replace (e) recessed lights (led, compliant); install new ceiling lights in kichen & bathroom; install like-for-like new shower. | $5,500 |
| Mar 25, 2016 | Completed final sign-off Oct 2018 | 432 Vallejo St | unit a & b: partial interior renovation on (e) 2 units 432 a&b: demo of interior walls, relocation of bathrooms, new & expanded kitchen, new interior stairs to roof and lower level & roof deckDetails
unit a & b: partial interior renovation on (e) 2 units 432 a&b: demo of interior walls, relocation of bathrooms, new & expanded kitchen, new interior stairs to roof and lower level & roof deck | $150,000 |
| Oct 30, 2015 | Completed final sign-off Jan 2016 | 2159 47th Av | bathroom remodel. no layout changes. (4) led recessed lights, replace fan (1) gfi. no structural work. now change to walls or doors.Details
bathroom remodel. no layout changes. (4) led recessed lights, replace fan (1) gfi. no structural work. now change to walls or doors. | $10,000 |
| Oct 1, 2015 | Expired or cancelled cancelled Jan 2026 | 816 Filbert St | revision to 2015 0730 2933: structural cals and dry rot repairDetails
revision to 2015 0730 2933: structural cals and dry rot repair | |
| Sep 9, 2015 | Completed final sign-off Oct 2015 | 328 Joost Av | revision to 2015-0813-4166 foundation work - repair the buckled wood due to water damage. remove soil to have 18" crwal space and build new footing below the (e) footing. replace the subfloor trainingDetails
revision to 2015-0813-4166 foundation work - repair the buckled wood due to water damage. remove soil to have 18" crwal space and build new footing below the (e) footing. replace the subfloor training | $2,000 |
| Aug 13, 2015 | Completed final sign-off Oct 2015 | 328 Joost Av | replace extg wood retaining wall. 1) build continous 3'6" heights c.m.u retaining wall behind the rear wall to replace the extg wood retaining wall. 2)replace the extg hardscape and install new linear drain. 3)repair the buckled wood floor due to water damage.Details
replace extg wood retaining wall. 1) build continous 3'6" heights c.m.u retaining wall behind the rear wall to replace the extg wood retaining wall. 2)replace the extg hardscape and install new linear drain. 3)repair the buckled wood floor due to water damage. | $30,000 |
| Jul 30, 2015 | Never finaled issued Jul 2015, no final | 816 Filbert St | back patio resurfacing. no structure, no plumbing, demo (e) tile, sub floor, remove dry rotted boards 100 sq ft underneath. replace circular drain with linear drain. waterproof, pour concrete, retile & seal surfaceDetails
back patio resurfacing. no structure, no plumbing, demo (e) tile, sub floor, remove dry rotted boards 100 sq ft underneath. replace circular drain with linear drain. waterproof, pour concrete, retile & seal surface | $20,000 |
| Jun 30, 2015 | Completed final sign-off Sep 2015 | 5175 Diamond Heights Bl | 2 bathroom remodel like for like (haal & master) in master instead of shower replace to tub in same location. replace toilet, vanity, tub, add 2 gfci in master bath. no walls moved, removed or added. all layout unchanged remeain intavt.. all fire-ratedDetails
2 bathroom remodel like for like (haal & master) in master instead of shower replace to tub in same location. replace toilet, vanity, tub, add 2 gfci in master bath. no walls moved, removed or added. all layout unchanged remeain intavt.. all fire-rated | $20,000 |
| Jun 10, 2015 | Completed final sign-off Jan 2016 | 4397 25th St | revision/addition to pa# 201505085847: relocate ceiling beams to avoid affecting 1/f windows and doors below.Details
revision/addition to pa# 201505085847: relocate ceiling beams to avoid affecting 1/f windows and doors below. | $1,000 |
| Jun 10, 2015 | Completed final sign-off Sep 2015 | 105 Palm Av | remodel kitchen and bathroom, interior only. no windows nor door will be removed, open the wall between kitchen & dining room, remodel bathroom, add led lights in dining room, kitchen & bathroom.Details
remodel kitchen and bathroom, interior only. no windows nor door will be removed, open the wall between kitchen & dining room, remodel bathroom, add led lights in dining room, kitchen & bathroom. | $25,000 |
| Jun 8, 2015 | Completed final sign-off Jul 2015 | 2125 Bryant St | remove non bearing wall to convert master bedroom and bath to study and great roomDetails
remove non bearing wall to convert master bedroom and bath to study and great room | $13,000 |
| May 8, 2015 | Completed final sign-off Jan 2016 | 4397 25th St | relocate kitchen, demo walls, new outlets & lighting. remodel (e) bathroom, new walls.Details
relocate kitchen, demo walls, new outlets & lighting. remodel (e) bathroom, new walls. | $50,000 |
| Apr 21, 2015 | Completed final sign-off Jan 2016 | 17 25th North Av | kitchen remodel, replace cabinets and appliances, replace (e0 ducts. instal 8 led recess lights, replace sheetrock. sheetrock garage area where needed. garage run plumbing and electric from outside walls to inside.Details
kitchen remodel, replace cabinets and appliances, replace (e0 ducts. instal 8 led recess lights, replace sheetrock. sheetrock garage area where needed. garage run plumbing and electric from outside walls to inside. | $6,500 |
| Mar 3, 2015 | Completed final sign-off Jan 2016 | 7 Carpenter Ct | 40% repair of front wood deck - no change in design or construction.Details
40% repair of front wood deck - no change in design or construction. | $8,000 |
| Feb 25, 2015 | Expired or cancelled cancelled Jan 2026 | 7 Carpenter Ct | front balcony replacement - like for likeDetails
front balcony replacement - like for like | $3,000 |
| Feb 23, 2015 | Completed final sign-off Jan 2016 | 17 25th North Av | revision to 201412314799: assumed concrete slab at lowest level turned out to be wood framed. n/a for the maherDetails
revision to 201412314799: assumed concrete slab at lowest level turned out to be wood framed. n/a for the maher | |
| Feb 23, 2015 | Completed final sign-off May 2015 | 635 38th Av | revision to app#201411030540. contractor failed to dbi up 2x10 floor joists as specified so a a footing was added to create a bearing wall.Details
revision to app#201411030540. contractor failed to dbi up 2x10 floor joists as specified so a a footing was added to create a bearing wall. | $1,000 |
| Dec 31, 2014 | Completed final sign-off Jan 2016 | 17 25th North Av | interior remodel of 4 bathrooms. removal of walls, fixture upgrades, new high eff light fixtures and cfci out outlets. relocate toilet approx 3' ft adjacent and shower fixture. compliance with maher ordinance no 155-13 not required.Details
interior remodel of 4 bathrooms. removal of walls, fixture upgrades, new high eff light fixtures and cfci out outlets. relocate toilet approx 3' ft adjacent and shower fixture. compliance with maher ordinance no 155-13 not required. | $80,000 |
| Dec 23, 2014 | Completed final sign-off May 2015 | 635 38th Av | revision appl. 2014.1103.0540. new structural work: replace (e) timber beam w/new steel beam and 1 posts and 2 footings. replace concrete slab w/new slab.Details
revision appl. 2014.1103.0540. new structural work: replace (e) timber beam w/new steel beam and 1 posts and 2 footings. replace concrete slab w/new slab. | $4,000 |
| Dec 3, 2014 | Completed final sign-off Oct 2016 | 541 Mississippi St | addition of new master bathroom over (e) deck over 1st floor. addition to master bedroom over (e) 1st floor roof / deck. change garage door wider door.Details
addition of new master bathroom over (e) deck over 1st floor. addition to master bedroom over (e) 1st floor roof / deck. change garage door wider door. | $60,000 |
| Dec 1, 2014 | Completed final sign-off May 2015 | 10 El Sereno Ct | complete remodel of 3 existing bathrooms with all new fixtures and finishes. scope include removal of a sauna, moving one bathtub use from the upper level to the lower level. adding 3 exhaust fansDetails
complete remodel of 3 existing bathrooms with all new fixtures and finishes. scope include removal of a sauna, moving one bathtub use from the upper level to the lower level. adding 3 exhaust fans | $45,000 |
| Nov 3, 2014 | Completed final sign-off Jun 2015 | 635 38th Av | interior remodel. add one media room and new bedroom, one full bathroom and new laundry room on 1st floor. rebuild existing interior stairway.Details
interior remodel. add one media room and new bedroom, one full bathroom and new laundry room on 1st floor. rebuild existing interior stairway. | $60,000 |
| Oct 15, 2014 | Completed final sign-off Feb 2015 | 2125 Santiago St | interior remodel of second floor powder room to a full bath and closet area.Details
interior remodel of second floor powder room to a full bath and closet area. | $12,000 |
| Sep 19, 2014 | Never finaled issued Sep 2014, no final | 108 04th Av | minor kitchen alteration project consisting of demo of (e) upper cabinets & replacement with new, upgrade of electrical outlets to gfci, demo of existing soffit above cabinets, reface existing lower cabinets, no plumbing modification, n/a ordinance #155-13.Details
minor kitchen alteration project consisting of demo of (e) upper cabinets & replacement with new, upgrade of electrical outlets to gfci, demo of existing soffit above cabinets, reface existing lower cabinets, no plumbing modification, n/a ordinance #155-13. | $9,000 |
| Jul 16, 2014 | Never finaled issued Jul 2014, no final | 2171 Sacramento St | revision to application number 2014-0625-9435. udated structural engineering plan for shear wall opening (per bldg insp. instructions) for unit 10. compliance with ord 155-13 not requiredDetails
revision to application number 2014-0625-9435. udated structural engineering plan for shear wall opening (per bldg insp. instructions) for unit 10. compliance with ord 155-13 not required | |
| Jun 25, 2014 | Never finaled issued Jun 2014, no final | 2171 Sacramento St | unit #10: replace cabinets, upgrade electrical outlet to gfci and add additional gfci outlet. replace appliances, add counter height washing machine, new wall opening in non-load bearing wallDetails
unit #10: replace cabinets, upgrade electrical outlet to gfci and add additional gfci outlet. replace appliances, add counter height washing machine, new wall opening in non-load bearing wall | $5,000 |
| Jun 25, 2014 | Completed final sign-off Aug 2014 | 794 Great Hy | revised building structural calculations per permit #2013.12.26.5079. to show the as build condition.Details
revised building structural calculations per permit #2013.12.26.5079. to show the as build condition. | |
| Apr 16, 2014 | Completed final sign-off May 2014 | 695 05th St | bathroom fixture replacement at a live/work loft with plumbing & electrical changing bathtub to shower.Details
bathroom fixture replacement at a live/work loft with plumbing & electrical changing bathtub to shower. | $7,250 |
| Feb 19, 2014 | Completed final sign-off Apr 2014 | 2774 Jackson St | move door 18" and replace window at lightwellDetails
move door 18" and replace window at lightwell | $4,000 |
| Dec 26, 2013 | Completed final sign-off Aug 2014 | 794 Great Hy | remove shear wall between living room and kitchen.Details
remove shear wall between living room and kitchen. | $5,000 |
| Nov 13, 2013 | Completed final sign-off Jun 2014 | 1239 04th Av | remodel 2 existing bathrooms - no new space, new tubs, sinks, gfci outlets, alter plumbing, tile & lighting.Details
remodel 2 existing bathrooms - no new space, new tubs, sinks, gfci outlets, alter plumbing, tile & lighting. | $10,000 |
| Oct 30, 2013 | Completed final sign-off Apr 2014 | 4041 23rd St | 2nd fl, remodel kitchen & bath #1, add 2nd bath. replace hall lighting, remove portion of wall between kitchen and utility roomDetails
2nd fl, remodel kitchen & bath #1, add 2nd bath. replace hall lighting, remove portion of wall between kitchen and utility room | $91,000 |
| Jul 22, 2013 | Completed final sign-off Jul 2014 | 2653 Union St | interior remodel. 1st fl add walls in bedroom, walls to closet, bath remodel, laundry room, new yoga room. 2nd fl: kitchen remodel, walls to be demolished, dining rm. bar demolished & remodel. 3rd fl: remodel 2 baths, add hallway, add walls to bedroom remodelDetails
interior remodel. 1st fl add walls in bedroom, walls to closet, bath remodel, laundry room, new yoga room. 2nd fl: kitchen remodel, walls to be demolished, dining rm. bar demolished & remodel. 3rd fl: remodel 2 baths, add hallway, add walls to bedroom remodel | $15,000 |