Armour Petroleum Service And Equipment C
- Based in
- Vacaville
- On San Francisco permits
- Feb 2009 to May 2026
- Last 24 months
- 1 permit filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 26, 2026 | Completed final sign-off Oct 2026 | 999 Ocean Av | removal and replacement of fuel dispenser. replacement dispenser is exact model of the one being removed. (e) electrical and plumbing to stay in place.Details
removal and replacement of fuel dispenser. replacement dispenser is exact model of the one being removed. (e) electrical and plumbing to stay in place. | $31,339 |
| May 5, 2014 | Completed final sign-off May 2014 | 800 Turk St | remove alphalt/concrecte to determine location of leak in fiberglass pipe conveying gas product between tank & dispenser. work per environmental permit. repair the hardscape to original finish.Details
remove alphalt/concrecte to determine location of leak in fiberglass pipe conveying gas product between tank & dispenser. work per environmental permit. repair the hardscape to original finish. | $6,000 |
| Feb 6, 2009 | Completed final sign-off May 2009 | 999 Ocean Av | mount veeder-root (v/r) vapor canister saw cut&hand trench fr planter box to dispenser #5/7 for 3/4" conduit for intrin-safe circuit for communication cable.plumb canister&pull commun wires.install vapor flow meters,hanging hardware,vapor pressure sensor@dispensers,install guard posts st.2-hr enclosDetails
mount veeder-root (v/r) vapor canister saw cut&hand trench fr planter box to dispenser #5/7 for 3/4" conduit for intrin-safe circuit for communication cable.plumb canister&pull commun wires.install vapor flow meters,hanging hardware,vapor pressure sensor@dispensers,install guard posts st.2-hr enclos | $74,000 |