Armour Construction
- Based in
- Novato
- On San Francisco permits
- Dec 2012 to Jul 2026
- Last 24 months
- 9 permits filed
37 permits since 2000: 29 completed, 2 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 9, 2026 | In progress issued Jul 2026 | 171 23rd Av | revision to 202606092795. add new framing and reinforce framing at rear. add washer and dryer to 2nd and 3rd flr. modify bath and 1/2 bath at 3rd flr.Details
revision to 202606092795. add new framing and reinforce framing at rear. add washer and dryer to 2nd and 3rd flr. modify bath and 1/2 bath at 3rd flr. | $25,000 |
| May 21, 2026 | In progress filed May 2026, not yet issued | 272 Hartford St | replace front entry stair in-kind. internal audit violation under seperate permitsDetails
replace front entry stair in-kind. internal audit violation under seperate permits | $40,000 |
| Apr 13, 2026 | Completed final sign-off Aug 2026 | 4179 26th St | revision 202508062456- deferred roof truss calculationsDetails
revision 202508062456- deferred roof truss calculations | |
| Feb 25, 2026 | Completed final sign-off Aug 2026 | 423 33rd Av | to obtain final inspection for work approved under pa # 201406107968Details
to obtain final inspection for work approved under pa # 201406107968 | |
| Jan 14, 2026 | Completed final sign-off Mar 2026 | 423 33rd Av | revision to pa#202502120178. relocate access 45-min rated door from lightwell to corridor. change configuration of new elevator equipment roomDetails
revision to pa#202502120178. relocate access 45-min rated door from lightwell to corridor. change configuration of new elevator equipment room | $2,000 |
| Aug 26, 2025 | Completed final sign-off Aug 2026 | 4179 26th St | new exit passageway through the (e) home in front for new rear yard adu. may share the same drawing of adu pa# 202508062456.Details
new exit passageway through the (e) home in front for new rear yard adu. may share the same drawing of adu pa# 202508062456. | $15,000 |
| Aug 26, 2025 | Completed final sign-off Aug 2026 | 4179 26th St | to erect 1 story, no basement, type v-b, detached adu. 02 sep '25 - travels with p/a: 2025-0815-3192. efm.Details
to erect 1 story, no basement, type v-b, detached adu. 02 sep '25 - travels with p/a: 2025-0815-3192. efm. | $150,000 |
| Mar 14, 2025 | Completed final sign-off Jan 2026 | 423 33rd Av | revision to pa 2025-0212-0178 renovate (e) 3rd fl (423). prior permit 202502120178 indicated third floor address incorrectly as 425.Details
revision to pa 2025-0212-0178 renovate (e) 3rd fl (423). prior permit 202502120178 indicated third floor address incorrectly as 425. | |
| Feb 12, 2025 | Completed final sign-off Aug 2026 | 423 33rd Av | unit 425- (n) 3 level elevator, renovate (e) third floor level; relocate (e) kitchen and remodel (e) primary bathroom . add (n) bathroom, (n) den, and new opening for (5) roof skylights.Details
unit 425- (n) 3 level elevator, renovate (e) third floor level; relocate (e) kitchen and remodel (e) primary bathroom . add (n) bathroom, (n) den, and new opening for (5) roof skylights. | $175,000 |
| Jul 12, 2024 | Completed final sign-off Oct 2024 | 4179 26th St | remodel down stairs bathroom install new appliances in kitchen replace 6 base cabinets onlyDetails
remodel down stairs bathroom install new appliances in kitchen replace 6 base cabinets only | $40,000 |
| Feb 21, 2023 | Completed final sign-off Oct 2023 | 1322 05th Av | dryrot repair front stairs and landing in kind less than 50%Details
dryrot repair front stairs and landing in kind less than 50% | $7,500 |
| Jun 1, 2021 | Completed final sign-off Dec 2021 | 4309 20th St | replacement of (e) guardrail at entry stair and 1/f. north patio. (n) in-swing gate at sidewalk.relace (e) stone surface at (e) stair and patio.Details
replacement of (e) guardrail at entry stair and 1/f. north patio. (n) in-swing gate at sidewalk.relace (e) stone surface at (e) stair and patio. | $20,400 |
| May 3, 2021 | Completed final sign-off Sep 2021 | 4307 20th St | replace in kind interior stairs from garage level to 1st fl. like for like in kindDetails
replace in kind interior stairs from garage level to 1st fl. like for like in kind | $6,500 |
| Oct 14, 2020 | Completed final sign-off Dec 2020 | 123 Laurel St | remove wall between kitchen & study on 2nd floor. provide beam to support joists above.Details
remove wall between kitchen & study on 2nd floor. provide beam to support joists above. | $70,000 |
| Jul 19, 2020 | Completed final sign-off Oct 2020 | 873 Union St | new concrete stairs en grade at rear yard.Details
new concrete stairs en grade at rear yard. | $5,000 |
| Jul 14, 2020 | Completed final sign-off Dec 2020 | 123 Laurel St | demo (e) kitchen cabinets, add (n) lighting cabinets & appliancesDetails
demo (e) kitchen cabinets, add (n) lighting cabinets & appliances | $90,000 |
| Sep 13, 2019 | Completed final sign-off May 2020 | 873 Union St | temporary shoring refer to pa 2018-1023-3918. exploratory work (excavation)Details
temporary shoring refer to pa 2018-1023-3918. exploratory work (excavation) | $50,000 |
| May 6, 2019 | Completed final sign-off Jul 2019 | 485 Liberty St | reinforcement of foundation sill bolting under floor post * beam connections w/metal plate connectors and reinforcement of "soft story" garage door openings w/structural steel ordinary steel moment frameDetails
reinforcement of foundation sill bolting under floor post * beam connections w/metal plate connectors and reinforcement of "soft story" garage door openings w/structural steel ordinary steel moment frame | $50,000 |
| Apr 19, 2019 | Never finaled issued Apr 2019, no final | 873 Union St | street spaceDetails
street space | |
| Nov 29, 2018 | Completed final sign-off Mar 2019 | 1626 North Point St | replace e dryrot damaged beam at 2nd fl level with lvl member of same or equivalent sizeDetails
replace e dryrot damaged beam at 2nd fl level with lvl member of same or equivalent size | $15,000 |
| Oct 23, 2018 | Completed final sign-off Oct 2020 | 873 Union St | ground level excavation & foundation work to create a garage & (n) living space for 1st flr unit. mep work per plan. (n) garage door & curb cut at ground leve. (n) roof deck with stairs.Details
ground level excavation & foundation work to create a garage & (n) living space for 1st flr unit. mep work per plan. (n) garage door & curb cut at ground leve. (n) roof deck with stairs. | $150,000 |
| Oct 9, 2018 | Completed final sign-off Sep 2020 | 873 Union St | interior remodel of 3 units to include: 1 new bathroom per unit, remodel kitchens, 3 remodel bathrooms. 3 new elect & plumb as neededDetails
interior remodel of 3 units to include: 1 new bathroom per unit, remodel kitchens, 3 remodel bathrooms. 3 new elect & plumb as needed | $288,000 |
| Oct 5, 2018 | Expired or cancelled withdrawn May 2019 | 873 Union St | new roof deck with stair and sliding hatch 3rd flDetails
new roof deck with stair and sliding hatch 3rd fl | $38,000 |
| Aug 9, 2018 | Completed final sign-off Nov 2018 | 4417 20th St | add a new bathroom & gym/storage room in (e) garage.Details
add a new bathroom & gym/storage room in (e) garage. | $40,000 |
| May 16, 2018 | Expired or cancelled withdrawn May 2019 | 873 Union St | new garage, garage door & curb cut at ground level. removal of (e) facade window.Details
new garage, garage door & curb cut at ground level. removal of (e) facade window. | $55,000 |
| Feb 20, 2018 | Expired or cancelled cancelled Jan 2026 | 523 Oak Park Dr | remove stucco and dry rot damaged sheathing and framing in area comprising the first 25'x12' street facing lower story and replacement with new framing, sheathing and stucco without restoration of original brick facadeDetails
remove stucco and dry rot damaged sheathing and framing in area comprising the first 25'x12' street facing lower story and replacement with new framing, sheathing and stucco without restoration of original brick facade | $19,300 |
| Jan 16, 2018 | Completed final sign-off Mar 2018 | 523 Oak Park Dr | removal and replacement of dry rot damage substrate and application of new stucco to the area involve with repainting of same area compromising the front 25 by 12 feet lower street facing side of the house. please note the existing brick material at the lower level shall be replaced in kind.Details
removal and replacement of dry rot damage substrate and application of new stucco to the area involve with repainting of same area compromising the front 25 by 12 feet lower street facing side of the house. please note the existing brick material at the lower level shall be replaced in kind. | $7,300 |
| Dec 13, 2017 | Completed final sign-off Jul 2018 | 1932 Jefferson St | voluntary partial lateral bracing of garage level with hardy framing, special moment frame and plywood shear wall maher naDetails
voluntary partial lateral bracing of garage level with hardy framing, special moment frame and plywood shear wall maher na | $90,000 |
| Apr 24, 2017 | Completed final sign-off Aug 2017 | 260 Downey St | revision to pa #201703222020 - new shower instead of bathtub at lower floor (260- 264 downey st).Details
revision to pa #201703222020 - new shower instead of bathtub at lower floor (260- 264 downey st). | |
| Mar 22, 2017 | Completed final sign-off Aug 2017 | 260 Downey St | wall removal at each floor (260 and 264 downey) between family and dining room. replace with new structural beam. reconfiguration of existing bathrooms and kitchen on each floor. infill window in lightwell at each floorDetails
wall removal at each floor (260 and 264 downey) between family and dining room. replace with new structural beam. reconfiguration of existing bathrooms and kitchen on each floor. infill window in lightwell at each floor | $28,000 |
| Mar 7, 2017 | Completed final sign-off Aug 2017 | 260 Downey St | remodel (3) kitchens and (3) baths. non structural.Details
remodel (3) kitchens and (3) baths. non structural. | $200,000 |
| Jan 20, 2016 | Never finaled issued Jan 2016, no final | 2909 Folsom St | provide temporary shoring to facilitate excavation & construction of the proposed first level per pa #201511172783.Details
provide temporary shoring to facilitate excavation & construction of the proposed first level per pa #201511172783. | |
| Dec 15, 2015 | Completed final sign-off May 2016 | 1821 Grant Av | soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4 | $90,000 |
| Nov 17, 2015 | Never finaled issued Dec 2015, no final | 2909 Folsom St | new interior renovations thrughout (e) 1st floor level, new conditioned space including: 1 bedroom, 1 office, 1 living rm, 2 bathrooms. new int stair to connect 1st & 2nd flrs, new (enlarged) windows at front facade, new window at rear facade & lightwell area.Details
new interior renovations thrughout (e) 1st floor level, new conditioned space including: 1 bedroom, 1 office, 1 living rm, 2 bathrooms. new int stair to connect 1st & 2nd flrs, new (enlarged) windows at front facade, new window at rear facade & lightwell area. | $75,000 |
| May 6, 2014 | Completed final sign-off Apr 2015 | 2261 Fulton St | 3 of 4 units in tic bldg going thru condo conversion have balconies insp. requiries (e) (3) balconies be replaced no record of permit and not compliant to current codes. new wood decks with posts & f.r. wall to grade to replace cantilevered balconies. one new wall sconce at (3)exist.doors to(n)Details
3 of 4 units in tic bldg going thru condo conversion have balconies insp. requiries (e) (3) balconies be replaced no record of permit and not compliant to current codes. new wood decks with posts & f.r. wall to grade to replace cantilevered balconies. one new wall sconce at (3)exist.doors to(n) | $50,000 |
| Jan 29, 2013 | Completed final sign-off May 2013 | 3878 Jackson St | change (e) wood window to wood clad windows. visible from street. replace two doors (in kind). ref. pa#201212035292.Details
change (e) wood window to wood clad windows. visible from street. replace two doors (in kind). ref. pa#201212035292. | $35,000 |
| Dec 3, 2012 | Completed final sign-off May 2013 | 3878 Jackson St | remodel kitchen and 3.5 bathrooms. new cabinets, tile and fixtures.Details
remodel kitchen and 3.5 bathrooms. new cabinets, tile and fixtures. | $55,000 |