Arisalva Construction
- Based in
- Concord
- On San Francisco permits
- Jan 2025 to Jul 2026
- Last 24 months
- 7 permits filed
7 permits since 2000: 4 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2026 | In progress filed Jul 2026, not yet issued | 2306 Broadway | create new pilaster & metal sercurity gate @ front yardDetails
create new pilaster & metal sercurity gate @ front yard | $5,250 |
| Jun 26, 2026 | In progress issued Jul 2026 | 701 Minna St | remodel (2) bathrooms - fixture replacement in kind.Details
remodel (2) bathrooms - fixture replacement in kind. | $70,000 |
| Apr 14, 2026 | Completed final sign-off Jul 2026 | 301 Gough St | unit f. remodeling 2 bath like for like. no removal of walls; same type of plumbing fixtures. all existing plumbing features to be maintainedDetails
unit f. remodeling 2 bath like for like. no removal of walls; same type of plumbing fixtures. all existing plumbing features to be maintained | $70,000 |
| Jan 22, 2026 | Completed final sign-off May 2026 | 1 Hoffman Av | removed existing fire place/enclose closet area. create new bathroom on the primary bedroom.Details
removed existing fire place/enclose closet area. create new bathroom on the primary bedroom. | $55,000 |
| Jan 20, 2026 | In progress issued Jan 2026 | 2306 Broadway | 1c hoffman ave: 1st floor powder room remodel, new plumbing and electrical 3rd floor: replace 84x120 balcony sliding door like for like, replace 84x60 sliding door like for like, replace 1 24x30 window, street facing. 0.27 u factor.Details
1c hoffman ave: 1st floor powder room remodel, new plumbing and electrical 3rd floor: replace 84x120 balcony sliding door like for like, replace 84x60 sliding door like for like, replace 1 24x30 window, street facing. 0.27 u factor. | $50,000 |
| Mar 27, 2025 | Completed final sign-off Jul 2025 | 2139 Green St | unit-e: remodeling powder room: changing toilet, sink vanity, ceiling lights (2 each), changing outlets (2 ea), light switches (3 ea), convert sink faucet to wall mount keeping the existing layout. no wall demolition or construction, no change in plumbing fixture count.Details
unit-e: remodeling powder room: changing toilet, sink vanity, ceiling lights (2 each), changing outlets (2 ea), light switches (3 ea), convert sink faucet to wall mount keeping the existing layout. no wall demolition or construction, no change in plumbing fixture count. | $15,000 |
| Jan 21, 2025 | Completed final sign-off Oct 2025 | 53 Wilder St | unit 301: remodel e) bath, replace electrical & plumbing. keep e) layoutDetails
unit 301: remodel e) bath, replace electrical & plumbing. keep e) layout | $12,500 |