Arc Construction
- Based in
- Walnut Creek
- On San Francisco permits
- Jun 2022 to Jun 2022
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2022 | Completed final sign-off Aug 2022 | 122 Rivoli St | at front replace siding w/ new siding to match. replace 6 front windows double hung w/new wood. replace front door & transom @ rear, 2 new windows openings at staircase, and close 1 window in bedroom @ garden level. these are in place of (e) windows.Details
at front replace siding w/ new siding to match. replace 6 front windows double hung w/new wood. replace front door & transom @ rear, 2 new windows openings at staircase, and close 1 window in bedroom @ garden level. these are in place of (e) windows. | $5,000 |