Apex Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Jul 2016
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2016 | Completed final sign-off Nov 2017 | 100 Delano Av | revision to pa 2016-0616-0124, convert rear garage to habitable space, add bedroom & family room; infill garage opening & curb cut; replace all windows in-kind, material to be wood with fiberglass cladDetails
revision to pa 2016-0616-0124, convert rear garage to habitable space, add bedroom & family room; infill garage opening & curb cut; replace all windows in-kind, material to be wood with fiberglass clad | $23,500 |
| Jun 16, 2016 | Completed final sign-off Nov 2017 | 100 Delano Av | legalize (e) 1st floor, work per plan.Details
legalize (e) 1st floor, work per plan. | $8,000 |
| May 5, 2016 | Completed final sign-off Nov 2017 | 100 Delano Av | to comply with complaint 201611473: revision to pa #2016 0414 4773: remove partition wall and add decorative ceiling in living room and entertainment room. replace interior finishes with 5/8" type x gyp boardDetails
to comply with complaint 201611473: revision to pa #2016 0414 4773: remove partition wall and add decorative ceiling in living room and entertainment room. replace interior finishes with 5/8" type x gyp board | $40,000 |
| Apr 14, 2016 | Completed final sign-off Nov 2017 | 100 Delano Av | relocate 1 (e) bedroom, adding 1 master bathroom & 1/2 bathroom on 1st floor. relocate (e) kitchen. remodel (e) bathroom on 1st floor.Details
relocate 1 (e) bedroom, adding 1 master bathroom & 1/2 bathroom on 1st floor. relocate (e) kitchen. remodel (e) bathroom on 1st floor. | $10,000 |
| Mar 25, 2016 | Completed final sign-off Sep 2016 | 62 Nantucket Av | reloacte kitchen to dining room, convert kitchen to a new bedroom. add a bathroom, remodel (e) bathroom on 2nd flr. add family rm & 2 bedrooms and a full bathroom to 1st floor. replace w/h. maher naDetails
reloacte kitchen to dining room, convert kitchen to a new bedroom. add a bathroom, remodel (e) bathroom on 2nd flr. add family rm & 2 bedrooms and a full bathroom to 1st floor. replace w/h. maher na | $65,000 |
| Feb 12, 2016 | Completed final sign-off Apr 2016 | 1000 Powell St | remodel 41 with new kitchen and bath upgrade. no structural workDetails
remodel 41 with new kitchen and bath upgrade. no structural work | $10,000 |
| Nov 23, 2015 | Completed final sign-off May 2016 | 3826 Lawton St | interior remodel on first floor to add (2) bedrooms, (1) bath, (1) hallway, (1) wetbar. lower floor 12 inches to provide 8'-0" ceiling ht.Details
interior remodel on first floor to add (2) bedrooms, (1) bath, (1) hallway, (1) wetbar. lower floor 12 inches to provide 8'-0" ceiling ht. | $60,000 |
| Oct 28, 2015 | Completed final sign-off Jan 2018 | 100 Delano Av | remodel (e) bathroom @ 2nd flr, include replace (e) drywall and (e) wall tile.Details
remodel (e) bathroom @ 2nd flr, include replace (e) drywall and (e) wall tile. | $4,000 |