Apc Construction
- Based in
- San Leandro
- On San Francisco permits
- Jul 2010 to Dec 2025
- Last 24 months
- 1 permit filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2025 | Completed final sign-off Apr 2026 | 2268 Jackson St | wall patching & painting, replace wiring for living room, dinning room, main door entry room, 3 bedrooms, 2 full bathrooms & one 1/2 bathrooms, plus replace one existing electrical fuses box panel, install 4 smoke alarm, install 2 combo smoke & carbon monoxide detectors.Details
wall patching & painting, replace wiring for living room, dinning room, main door entry room, 3 bedrooms, 2 full bathrooms & one 1/2 bathrooms, plus replace one existing electrical fuses box panel, install 4 smoke alarm, install 2 combo smoke & carbon monoxide detectors. | $23,000 |
| Jun 9, 2020 | Completed final sign-off Nov 2020 | 333 Kearny St | 5th flr - partial demo of previous tenant build-out. existing building core & shell to remain intact. no structural or building or life safety systems shall be removed or altered. no ceiling work/removal can be done without approved sprinkler plans under sep permit.Details
5th flr - partial demo of previous tenant build-out. existing building core & shell to remain intact. no structural or building or life safety systems shall be removed or altered. no ceiling work/removal can be done without approved sprinkler plans under sep permit. | $14,500 |
| Mar 23, 2018 | Completed final sign-off Apr 2018 | 1860 Mason St | replace water line for ulnit 1860 & 1862; replace light fixture outlet box in bathroom for both units; remove lat & plaster wall & ceiling as needed in kitchen and bathroom. cover up sheetrock as needed. also replace unit 1862 shower control valveDetails
replace water line for ulnit 1860 & 1862; replace light fixture outlet box in bathroom for both units; remove lat & plaster wall & ceiling as needed in kitchen and bathroom. cover up sheetrock as needed. also replace unit 1862 shower control valve | $20,000 |
| Jun 14, 2013 | Completed final sign-off Sep 2013 | 1856 Mason St | remove entire wall and ceiling. lath and plaster. replace waste line, electrical wire. replace bath , fixtures. replace kitchen cabinets. new 5/8" ty;e sheet to wall and ceiling. lighting will comply w title 24. add new elec subpanelDetails
remove entire wall and ceiling. lath and plaster. replace waste line, electrical wire. replace bath , fixtures. replace kitchen cabinets. new 5/8" ty;e sheet to wall and ceiling. lighting will comply w title 24. add new elec subpanel | $45,000 |
| May 11, 2012 | Completed final sign-off Jul 2012 | 333 Kearny St | revision to 201111148869. revise at built. aluminum interior tempered glazing and door assembly. as built existing bathroomDetails
revision to 201111148869. revise at built. aluminum interior tempered glazing and door assembly. as built existing bathroom | |
| Mar 9, 2012 | Completed final sign-off Jul 2012 | 333 Kearny St | install new lighting & receptacles for the entire floor, also rough wiring. reference t.i. pa #201111148869Details
install new lighting & receptacles for the entire floor, also rough wiring. reference t.i. pa #201111148869 | $30,000 |
| Nov 14, 2011 | Completed final sign-off Jul 2012 | 333 Kearny St | 5th floor t.i.- office/recording studio - add new interior walls as required none to be intricately structured to the bldg. conduct electrical work as required for new plan. mechanical, elec, plbg, sprinkler and fire alarm revisions under separate applications as required for new plan.Details
5th floor t.i.- office/recording studio - add new interior walls as required none to be intricately structured to the bldg. conduct electrical work as required for new plan. mechanical, elec, plbg, sprinkler and fire alarm revisions under separate applications as required for new plan. | $10,000 |
| Aug 17, 2010 | Completed final sign-off Nov 2010 | 1858 Mason St | additional work on replacing whole house waterline to copper pipe, relocate & rerun gas line (in house). rewire whole house electrical work and a subpanel. from the original permit # 201007136510. also sheet rock all walls & ceilings; in unit only at top floor, smoke alarms shall coDetails
additional work on replacing whole house waterline to copper pipe, relocate & rerun gas line (in house). rewire whole house electrical work and a subpanel. from the original permit # 201007136510. also sheet rock all walls & ceilings; in unit only at top floor, smoke alarms shall co | $10,000 |
| Jul 13, 2010 | Completed final sign-off Nov 2010 | 1858 Mason St | repl bath tub & toilet inb athrm area (item #6) partial compliance with complaint 201043102, repl kitchen sink cabinet with new sink & faucet, repl wall-heater, comply with 201046758Details
repl bath tub & toilet inb athrm area (item #6) partial compliance with complaint 201043102, repl kitchen sink cabinet with new sink & faucet, repl wall-heater, comply with 201046758 | $12,000 |