Apartment Renovation Specialists
- Based in
- Concord
- On San Francisco permits
- Dec 2014 to Jun 2017
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2017 | Never finaled issued Jun 2017, no final | 5285 Diamond Heights Bl | unit #217 kitchen remodel: remove & replace (e)cabinets,countertops & sink. no new wall & no (e)wall relocation. relocate (e)electrical panel located inside closet to wall facing hallway. lighting in kitchen remodel shall comply with cec 150.0(k)3.Details
unit #217 kitchen remodel: remove & replace (e)cabinets,countertops & sink. no new wall & no (e)wall relocation. relocate (e)electrical panel located inside closet to wall facing hallway. lighting in kitchen remodel shall comply with cec 150.0(k)3. | $7,800 |
| Jan 10, 2017 | Never finaled issued Dec 2017, no final | 333 03rd St | for existing complex built in 1989 with 359 apartments privide (n) washer (ven hess) dryer in each apartment. provide (n) ada kitchen counters.Details
for existing complex built in 1989 with 359 apartments privide (n) washer (ven hess) dryer in each apartment. provide (n) ada kitchen counters. | $2,872,000 |
| Aug 3, 2015 | Completed final sign-off Sep 2017 | 1645 Mission St | addition of mezzanine storage platform deferred submittal for 201412294637 changing 3 guardrails to 7. compliance with maher ordinance no 155-13 not required.Details
addition of mezzanine storage platform deferred submittal for 201412294637 changing 3 guardrails to 7. compliance with maher ordinance no 155-13 not required. | |
| Jul 22, 2015 | Completed final sign-off Sep 2017 | 1645 Mission St | ground fl: addition of hvac ductwork, ref ti 2014-1229-4637. fire alarm deferred submittal. smoke detector shutdown to fire alarm on deferred submittal.Details
ground fl: addition of hvac ductwork, ref ti 2014-1229-4637. fire alarm deferred submittal. smoke detector shutdown to fire alarm on deferred submittal. | $16,900 |
| Dec 29, 2014 | Completed final sign-off Sep 2017 | 1645 Mission St | merge retail space, remove one restroom, add mezzanine office storage space platform to the existing space with a stairway access. mep, fa, and fire sprinkler under separate permit; maher n/aDetails
merge retail space, remove one restroom, add mezzanine office storage space platform to the existing space with a stairway access. mep, fa, and fire sprinkler under separate permit; maher n/a | $41,000 |