Anthony C. Cirella/Afs Property Mgmt
- Based in
- Berkeley
- On San Francisco permits
- Feb 2014 to Aug 2021
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2021 | Completed final sign-off Jun 2022 | 988 Capp St | rev to pa202006259146: partial voluntary seismic strengthening at 1st floor only; addition of new plywood shearwall at gridline c, w/ (n) 24'-0" shearwall and 10'-0" shearwall @ gridline 4.5 & 5.Details
rev to pa202006259146: partial voluntary seismic strengthening at 1st floor only; addition of new plywood shearwall at gridline c, w/ (n) 24'-0" shearwall and 10'-0" shearwall @ gridline 4.5 & 5. | $26,000 |
| Jun 25, 2020 | Completed final sign-off Jun 2022 | 988 Capp St | remodel of existing kitchen, remodel/relocate existing bath. upgrade electrical to existing bedroom and living room for first floor unit.Details
remodel of existing kitchen, remodel/relocate existing bath. upgrade electrical to existing bedroom and living room for first floor unit. | $125,000 |
| Feb 26, 2014 | Completed final sign-off Apr 2014 | 2425 Market St | unit #8. replacement of counters & cabinets in kitchen/bath, repaint & install new window coverings. replace door hardwares & shelving in closets tile back splashes (walls)Details
unit #8. replacement of counters & cabinets in kitchen/bath, repaint & install new window coverings. replace door hardwares & shelving in closets tile back splashes (walls) | $28,000 |