Angelo's Roofing And Maintenance
- Based in
- Daly City
- On San Francisco permits
- May 2004 to Sep 2025
- Last 24 months
- 5 permits filed
105 permits since 2000: 30 completed, 5 in progress, 54 never finaled, 16 expired or cancelled.
Of the 54 never-finaled permits, 7 are 3 to 5 years old, 17 are 5 to 10 years old, 30 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 105.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2025 | In progress issued Sep 2025 | 315 Kensington Wy | reroof. torch downDetails
reroof. torch down | $14,000 |
| Jul 9, 2025 | In progress issued Jul 2025 | 219 Evelyn Wy | re-roofing w/ torch down. no work to (e) roof structural sheathing. bax #0374141.Details
re-roofing w/ torch down. no work to (e) roof structural sheathing. bax #0374141. | $14,500 |
| Dec 6, 2024 | Completed final sign-off Dec 2024 | 1127 Shafter Av | reroofing: hot works, about 40 squares.Details
reroofing: hot works, about 40 squares. | $21,000 |
| Oct 29, 2024 | In progress issued Oct 2024 | 230 Harkness Av | reroofing- no torch workDetails
reroofing- no torch work | $17,000 |
| Oct 29, 2024 | In progress issued Oct 2024 | 154 Lisbon St | reroofing: no torch workDetails
reroofing: no torch work | $24,000 |
| Dec 8, 2023 | In progress issued Dec 2023 | 571 Wildwood Wy | reroofing: remove existing roofing material and apply torch down roof system. flat roof with slope less than 2:12 pitch.Details
reroofing: remove existing roofing material and apply torch down roof system. flat roof with slope less than 2:12 pitch. | $15,000 |
| Sep 13, 2023 | Completed final sign-off Oct 2023 | 280 Lily St | reroofingDetails
reroofing | $12,000 |
| Sep 13, 2023 | Never finaled issued Sep 2023, no final | 2960 Mission St | reroofingDetails
reroofing | $25,000 |
| Aug 7, 2023 | Never finaled issued Aug 2023, no final | 248 Winding Wy | reroofingDetails
reroofing | $16,000 |
| Jul 6, 2023 | Never finaled issued Jul 2023, no final | 156 Seville St | re-roofingDetails
re-roofing | $29,000 |
| Jan 30, 2023 | Never finaled issued Jan 2023, no final | 892 Portola Dr | reroofingDetails
reroofing | $18,000 |
| Nov 28, 2022 | Never finaled issued Nov 2022, no final | 3436 22nd St | reroofingDetails
reroofing | $18,000 |
| Nov 28, 2022 | Never finaled issued Nov 2022, no final | 1363 Alabama St | reroofingDetails
reroofing | $13,000 |
| Oct 11, 2022 | Expired or cancelled expired Nov 2025 | 1256 Stanyan St | reroofingDetails
reroofing | $16,000 |
| Jan 31, 2022 | Never finaled issued Jan 2022, no final | 633 Clement St | reroofingDetails
reroofing | $26,000 |
| Sep 8, 2021 | Completed final sign-off Sep 2022 | 100 Molimo Dr | re-roofingDetails
re-roofing | $7,800 |
| Aug 2, 2021 | Never finaled issued Aug 2021, no final | 860 Eddy St | reroofingDetails
reroofing | $13,000 |
| Apr 7, 2021 | Never finaled issued Apr 2021, no final | 36 Monterey Bl | reroofing. comply with the cool roof requirements per 2019 california energy code section 141.0 b 2bDetails
reroofing. comply with the cool roof requirements per 2019 california energy code section 141.0 b 2b | $9,000 |
| Apr 7, 2021 | Never finaled issued Apr 2021, no final | 29 Joost Av | reroofingDetails
reroofing | $9,000 |
| Jun 9, 2020 | Completed final sign-off Jul 2020 | 1115 Moraga St | reroofingDetails
reroofing | $12,000 |
| Oct 30, 2019 | Completed final sign-off Nov 2019 | 930 Naples St | reroofingDetails
reroofing | $13,000 |
| Sep 10, 2019 | Never finaled issued Sep 2019, no final | 1106 Brazil Av | reroofingDetails
reroofing | $9,000 |
| Aug 23, 2019 | Completed final sign-off Sep 2019 | 101 Farnum St | reroofingDetails
reroofing | $7,500 |
| Apr 15, 2019 | Never finaled issued Apr 2019, no final | 22 Nebraska St | re-roofingDetails
re-roofing | $10,000 |
| Apr 15, 2019 | Never finaled issued Apr 2019, no final | 1152 Geneva Av | re-roofingDetails
re-roofing | $15,000 |
| Dec 10, 2018 | Never finaled issued Dec 2018, no final | 3741 Cesar Chavez St | reroofingDetails
reroofing | $21,000 |
| Nov 26, 2018 | Completed final sign-off Jul 2019 | 1700 Lawton St | reroofing.Details
reroofing. | $15,000 |
| Jul 23, 2018 | Never finaled issued Jul 2018, no final | 269 28th St | reroofingDetails
reroofing | $9,000 |
| Jul 6, 2018 | Never finaled issued Jul 2018, no final | 647 Joost Av | re-roofingDetails
re-roofing | $12,000 |
| Jun 27, 2018 | Never finaled issued Jun 2018, no final | 242 Baltimore Wy | reroofingDetails
reroofing | $9,000 |
| Jun 27, 2018 | Completed final sign-off Nov 2018 | 350 15th Av | reroofingDetails
reroofing | $6,000 |
| Jun 27, 2018 | Completed final sign-off Nov 2018 | 350 15th Av | remove (e) and install 1/2 inch cdx plywood nailed at 6 on the edges and 8" on the centerDetails
remove (e) and install 1/2 inch cdx plywood nailed at 6 on the edges and 8" on the center | $5,000 |
| Apr 25, 2018 | Never finaled issued Apr 2018, no final | 250 Woolsey St | reroofDetails
reroof | $9,000 |
| Dec 5, 2017 | Never finaled issued Dec 2017, no final | 340 12th St | reroofingDetails
reroofing | $7,400 |
| Nov 17, 2017 | Never finaled issued Nov 2017, no final | 176 Lunado Ct | reroofing- remove existing slope roof and apply 30lb felt and 30 year shingle same as exisitng, less than 5 lb per sq.ft. material.Details
reroofing- remove existing slope roof and apply 30lb felt and 30 year shingle same as exisitng, less than 5 lb per sq.ft. material. | $17,000 |
| Jun 30, 2017 | Never finaled issued Jun 2017, no final | 1534 33rd Av | re-roofingDetails
re-roofing | $12,000 |
| Jun 7, 2017 | Never finaled issued Jun 2017, no final | 1286 Treat Av | common area- reroofingDetails
common area- reroofing | $27,000 |
| Jun 1, 2017 | Never finaled issued Jun 2017, no final | 2438 Taraval St | re-roofingDetails
re-roofing | $8,500 |
| May 17, 2017 | Never finaled issued May 2017, no final | 882 14th St | reroofingDetails
reroofing | $9,000 |
| Sep 12, 2016 | Never finaled issued Sep 2016, no final | 4935 Anza St | reroofingDetails
reroofing | $8,400 |
| May 27, 2016 | Never finaled issued May 2016, no final | 859 Kansas St | reroofingDetails
reroofing | $7,000 |
| May 27, 2016 | Never finaled issued May 2016, no final | 859 Kansas St | remove (e) roof and install plywood with railing at center and 4 inches at edgeDetails
remove (e) roof and install plywood with railing at center and 4 inches at edge | $5,000 |
| May 17, 2016 | Never finaled issued May 2016, no final | 822 Portola Dr | reroofingDetails
reroofing | $5,800 |
| Oct 1, 2015 | Completed final sign-off Oct 2015 | 845 Chenery St | reroofingDetails
reroofing | $5,500 |
| Jun 19, 2015 | Never finaled issued Jun 2015, no final | 1406 11th Av | reroofingDetails
reroofing | $3,800 |
| May 20, 2015 | Never finaled issued May 2015, no final | 327 Ellington Av | reroofingDetails
reroofing | $7,000 |
| May 14, 2015 | Never finaled issued May 2015, no final | 2576 Post St | reroofingDetails
reroofing | $4,000 |
| Mar 23, 2015 | Completed final sign-off Jun 2016 | 324 Mississippi St | remove existing roof and install 1/2 inch cdx plywood nailed at 8" inc on center and 6' inch at edgesDetails
remove existing roof and install 1/2 inch cdx plywood nailed at 8" inc on center and 6' inch at edges | $7,000 |
| Mar 23, 2015 | Completed final sign-off Jun 2016 | 324 Mississippi St | re-roofingDetails
re-roofing | $8,000 |
| Oct 8, 2014 | Never finaled issued Oct 2014, no final | 936 Chenery St | re-roofingDetails
re-roofing | $7,000 |
| Mar 27, 2014 | Never finaled issued Mar 2014, no final | 580 Pacific Av | reroof flat roof at front of building. no other work.Details
reroof flat roof at front of building. no other work. | $4,500 |
| Jan 23, 2014 | Never finaled issued Jan 2014, no final | 1290 28th Av | reroofingDetails
reroofing | $6,700 |
| Nov 13, 2013 | Never finaled issued Nov 2013, no final | 957 Alvarado St | reroofing.Details
reroofing. | $5,000 |
| Sep 20, 2013 | Never finaled issued Sep 2013, no final | 874 26th Av | reroofingDetails
reroofing | $10,900 |
| Jun 20, 2013 | Completed final sign-off Jun 2013 | 555 Connecticut St | remove 7 feet x 7 feet of flat roof and repair build up roof system with hot tar and fiber glass paperDetails
remove 7 feet x 7 feet of flat roof and repair build up roof system with hot tar and fiber glass paper | $1,300 |
| Jun 4, 2013 | Expired or cancelled expired Nov 2015 | 424 Alvarado St | remove extg slope roof and install 1/2 cdx plywood naid at edges every 6" to 8" at center.Details
remove extg slope roof and install 1/2 cdx plywood naid at edges every 6" to 8" at center. | $5,000 |
| Jun 4, 2013 | Expired or cancelled expired Nov 2015 | 424 Alvarado St | reroofingDetails
reroofing | $6,000 |
| Jan 18, 2013 | Expired or cancelled expired Mar 2015 | 820 Laguna Honda Bl | reroofingDetails
reroofing | $7,800 |
| Jan 31, 2012 | Expired or cancelled expired Oct 2013 | 71 Margaret Av | reroofingDetails
reroofing | $6,100 |
| Sep 28, 2011 | Never finaled issued Sep 2011, no final | 514 Utah St | reroofingDetails
reroofing | $5,200 |
| Sep 28, 2011 | Never finaled issued Sep 2011, no final | 514 Utah St | supply and install 1/2 " cdx plywood, nail at 4" at edges and 6" at center.Details
supply and install 1/2 " cdx plywood, nail at 4" at edges and 6" at center. | $3,800 |
| Sep 19, 2011 | Completed final sign-off Sep 2011 | 245 Castro St | reroofingDetails
reroofing | $12,000 |
| Jul 22, 2011 | Completed final sign-off Jul 2012 | 609 Clement St | reroofingDetails
reroofing | $12,000 |
| Jul 15, 2011 | Completed final sign-off Jul 2012 | 355 07th Av | reroofingDetails
reroofing | $8,900 |
| Jul 8, 2011 | Completed final sign-off Jul 2012 | 1371 10th Av | reroofingDetails
reroofing | $9,000 |
| Jul 1, 2011 | Completed final sign-off Jul 2012 | 670 09th Av | reroofingDetails
reroofing | $8,800 |
| Jun 23, 2011 | Completed final sign-off Feb 2012 | 1970 Ellis St | reroofingDetails
reroofing | $5,800 |
| Jun 23, 2011 | Completed final sign-off Feb 2012 | 1960 Ellis St | reroofingDetails
reroofing | $6,500 |
| May 10, 2011 | Never finaled issued May 2011, no final | 2150 Revere Av | re-roofing onlyDetails
re-roofing only | $4,300 |
| Apr 4, 2011 | Completed final sign-off Apr 2011 | 81 Alviso St | install 1/2 inch cdx plywood to slope roof with 8d nails at 6" at center and 4 at edges, existing skip sheathing to remain.Details
install 1/2 inch cdx plywood to slope roof with 8d nails at 6" at center and 4 at edges, existing skip sheathing to remain. | $3,500 |
| Apr 4, 2011 | Completed final sign-off Apr 2011 | 81 Alviso St | reroofingDetails
reroofing | $4,600 |
| Oct 6, 2010 | Never finaled issued Oct 2010, no final | 60 Hiliritas Av | reroofingDetails
reroofing | $4,000 |
| Aug 9, 2010 | Never finaled issued Aug 2010, no final | 1745 Pacheco St | reroofingDetails
reroofing | $6,900 |
| Jun 1, 2010 | Completed final sign-off Aug 2010 | 22 Shotwell St | reroofingDetails
reroofing | $8,000 |
| May 6, 2010 | Expired or cancelled expired Aug 2012 | 1251 Waller St | reroofingDetails
reroofing | $3,000 |
| Oct 14, 2008 | Never finaled issued Oct 2008, no final | 1261 Florida St | reroofingDetails
reroofing | $4,500 |
| Oct 6, 2008 | Expired or cancelled expired May 2016 | 579 Lisbon St | remove existing slope roof and install 1/2 h inch cdx plywood, 1-30 lb felt and shingles with 8d nails at 6" edge and 8" at center, class b min.Details
remove existing slope roof and install 1/2 h inch cdx plywood, 1-30 lb felt and shingles with 8d nails at 6" edge and 8" at center, class b min. | $6,500 |
| Sep 19, 2008 | Never finaled issued Sep 2008, no final | 598 Vienna St | reroofing.Details
reroofing. | $5,200 |
| Aug 15, 2008 | Never finaled issued Aug 2008, no final | 2090 34th Av | reroofingDetails
reroofing | $7,600 |
| May 5, 2008 | Never finaled issued May 2008, no final | 860 Eddy St | reroofing.Details
reroofing. | $8,000 |
| Mar 18, 2008 | Completed final sign-off Mar 2008 | 4638 18th St | install 1/2 plywood over slope area at roof.Details
install 1/2 plywood over slope area at roof. | $1,000 |
| Mar 18, 2008 | Never finaled issued Mar 2008, no final | 4638 18th St | reroofing.Details
reroofing. | $8,200 |
| Feb 28, 2008 | Completed final sign-off Mar 2008 | 801 San Jose Av | commercial reroofDetails
commercial reroof | $12,000 |
| Oct 5, 2007 | Never finaled issued Oct 2007, no final | 664 Greenwich St | reroofingDetails
reroofing | $5,900 |
| Aug 16, 2007 | Expired or cancelled expired Nov 2012 | 216 Filbert St | reroofingDetails
reroofing | $8,000 |
| Jun 19, 2007 | Completed final sign-off Oct 2007 | 1035 Post St | reroofingDetails
reroofing | $22,000 |
| Mar 27, 2007 | Completed final sign-off Jun 2007 | 3725 24th St | reroofingDetails
reroofing | $9,000 |
| Nov 13, 2006 | Completed final sign-off Nov 2006 | 2454 Bush St | install 1/2" cdx plywood. 6" at edges & 8" at center with 8d nails.Details
install 1/2" cdx plywood. 6" at edges & 8" at center with 8d nails. | $2,500 |
| Nov 13, 2006 | Completed final sign-off Nov 2006 | 2454 Bush St | reroofing.Details
reroofing. | $3,000 |
| Oct 6, 2006 | Expired or cancelled expired Apr 2007 | 1299 Fitzgerald Av | install 1/2 inch plywood nail at 6" inch at perimeter and 10" in center. 8d nail.Details
install 1/2 inch plywood nail at 6" inch at perimeter and 10" in center. 8d nail. | $2,000 |
| Oct 6, 2006 | Expired or cancelled expired Apr 2007 | 1299 Fitzgerald Av | reroofingDetails
reroofing | $5,400 |
| Jun 29, 2006 | Never finaled issued Jun 2006, no final | 446 Vienna St | reroofingDetails
reroofing | $3,800 |
| Dec 8, 2005 | Expired or cancelled expired May 2007 | 940 Mission St | reroofingDetails
reroofing | $14,000 |
| Sep 19, 2005 | Expired or cancelled expired Mar 2006 | 1523 Thomas Av | reroofingDetails
reroofing | $5,000 |
| Sep 14, 2005 | Expired or cancelled expired Jul 2006 | 1767 La Salle Av | reroofingDetails
reroofing | $6,000 |
| Aug 26, 2005 | Never finaled issued Aug 2005, no final | 1342 Guerrero St | reroofingDetails
reroofing | $10,000 |
| Jun 14, 2005 | Never finaled issued Jun 2005, no final | 871 Capp St | reroofingDetails
reroofing | $4,800 |
| Apr 25, 2005 | Expired or cancelled expired Dec 2005 | 1559 Shafter Av | reroofingDetails
reroofing | $7,000 |
| Apr 1, 2005 | Never finaled issued Apr 2005, no final | 500 Justin Dr | reroofing.Details
reroofing. | $9,000 |
| Dec 15, 2004 | Expired or cancelled expired Jan 2006 | 498 Bright St | reroofingDetails
reroofing | $3,700 |