Anello Painting And Construction
- Based in
- Novato
- On San Francisco permits
- Feb 2013 to Jun 2019
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 7, 2019 | Completed final sign-off Oct 2019 | 426 Sanchez St | convert (e) bathroom space into 1 bathroom and half bath. add non-load bearing partition wall, toilet, tie to (e) drain, (n) plumbing fixtures, minor electrical upgrades, add fanDetails
convert (e) bathroom space into 1 bathroom and half bath. add non-load bearing partition wall, toilet, tie to (e) drain, (n) plumbing fixtures, minor electrical upgrades, add fan | $10,000 |
| Nov 7, 2018 | Completed final sign-off May 2019 | 2114 36th Av | partition walls removal, cabinet and tile upgrades. new appliances & fixtures. minor electrical and plumbing upgrades.Details
partition walls removal, cabinet and tile upgrades. new appliances & fixtures. minor electrical and plumbing upgrades. | $30,000 |
| Feb 6, 2013 | Never finaled issued Feb 2013, no final | 55 05th St | basement level-work includes minor demo & the construction of walls & doors to create 2 new locker rooms, 2 storages & 2 offices. mechanical, electrical, plumbing, fire alarm and sprinklers shall be filed as part of a separate permit.Details
basement level-work includes minor demo & the construction of walls & doors to create 2 new locker rooms, 2 storages & 2 offices. mechanical, electrical, plumbing, fire alarm and sprinklers shall be filed as part of a separate permit. | $20,000 |