Andre Leiro Construction
- Based in
- Redwood City
- On San Francisco permits
- Feb 2009 to Feb 2026
- Last 24 months
- 1 permit filed
10 permits since 2000: 7 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2026 | In progress issued Feb 2026 | 340 Chestnut St | to obtain final inspection for work approved under pa# 201612235791. all work is approved.Details
to obtain final inspection for work approved under pa# 201612235791. all work is approved. | |
| Mar 13, 2019 | Completed final sign-off Sep 2019 | 340 Chestnut St | to obtain a final inspection sfor work appoved under pa# 201606281048Details
to obtain a final inspection sfor work appoved under pa# 201606281048 | |
| Jun 27, 2017 | Completed final sign-off Aug 2017 | 200 Anza St | replace 3 front windows in kind due to rotted frames and rotted sash that caused leaks.Details
replace 3 front windows in kind due to rotted frames and rotted sash that caused leaks. | $26,000 |
| Dec 23, 2016 | Never finaled issued Feb 2019, no final | 340 Chestnut St | horizontal expansion to rear @ each of (4)stories; fully sprinkler. vertical expansion @ roof penthouse. horizontal expansion @ roof pentshouse. enlarge roof deck w/ (n) 42" high railings.Details
horizontal expansion to rear @ each of (4)stories; fully sprinkler. vertical expansion @ roof penthouse. horizontal expansion @ roof pentshouse. enlarge roof deck w/ (n) 42" high railings. | $725,000 |
| Jun 28, 2016 | Expired or cancelled expired Sep 2019 | 340 Chestnut St | remove interior finishes for salvage exploratory. no dry wall removal. wood paneling & trim to be removed only.Details
remove interior finishes for salvage exploratory. no dry wall removal. wood paneling & trim to be removed only. | $1,000 |
| Aug 19, 2015 | Completed final sign-off Oct 2015 | 200 Anza St | replace footings and add 1 additional post & footingDetails
replace footings and add 1 additional post & footing | $1,000 |
| Nov 23, 2011 | Completed final sign-off Jul 2012 | 3477 Pacific Av | take out (7) rotted windows in back of house and replace with marvin windows, low "e" & insulated glass. replace wooden shingles as needed around windows.Details
take out (7) rotted windows in back of house and replace with marvin windows, low "e" & insulated glass. replace wooden shingles as needed around windows. | $18,000 |
| Aug 22, 2011 | Completed final sign-off Oct 2011 | 71 Castle St | voluntary strengthening of lower level walls. drill 5/8" threaded rods, set in 7-inch embedment. 1/2" plywood sheathing w/ 10d common nails 5"e.n. 12"f.n.Details
voluntary strengthening of lower level walls. drill 5/8" threaded rods, set in 7-inch embedment. 1/2" plywood sheathing w/ 10d common nails 5"e.n. 12"f.n. | $12,500 |
| Mar 8, 2010 | Completed final sign-off Apr 2010 | 1354 Greenwich St | remove existing old wall shingles in front of house, replace with new in-kind.Details
remove existing old wall shingles in front of house, replace with new in-kind. | $5,500 |
| Feb 5, 2009 | Completed final sign-off May 2009 | 336 Chestnut St | lower windows at reat top floor to match existing flankling windows.Details
lower windows at reat top floor to match existing flankling windows. | $6,800 |