Anderson - Niswander Seismic Retrofit In
- Based in
- La Honda
- On San Francisco permits
- Mar 2013 to Nov 2013
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 27, 2013 | Completed final sign-off Feb 2014 | 419 Prentiss St | voluntary strengthening of cripple wall bracing - mudsill bolting & connections to framing above cripple walls & strengthening at 1st floor stair opening. work is confined to crawl space & lower floor area.Details
voluntary strengthening of cripple wall bracing - mudsill bolting & connections to framing above cripple walls & strengthening at 1st floor stair opening. work is confined to crawl space & lower floor area. | $20,000 |
| Aug 27, 2013 | Never finaled issued Sep 2013, no final | 4281 24th St | local strenghtening of resistnace-voluntary, new plywood sheathing on local new foundation per plan, new plywood wall on (e) foundation per plan, cantilever columm attched to (e) cmu per plan. existing layout per pa 8901177.Details
local strenghtening of resistnace-voluntary, new plywood sheathing on local new foundation per plan, new plywood wall on (e) foundation per plan, cantilever columm attched to (e) cmu per plan. existing layout per pa 8901177. | $25,000 |
| Jul 26, 2013 | Completed final sign-off Jul 2014 | 3030 Broderick St | a) new shear walls including plywood, shear clips, sill bolts-hold down elements. b)in the interior 2 moment frames, grade beams, and collector. c)at the front cantilever colums-grade beams and collector elements. city of san francisco seismic retrofit program (sfbc chapter 34b)Details
a) new shear walls including plywood, shear clips, sill bolts-hold down elements. b)in the interior 2 moment frames, grade beams, and collector. c)at the front cantilever colums-grade beams and collector elements. city of san francisco seismic retrofit program (sfbc chapter 34b) | $120,000 |
| Jun 11, 2013 | Completed final sign-off Oct 2013 | 3857 18th St | the scope of work is the design of new gravity beams at the interior wall removal. this does not involve a seismic upgrade to the extg bldg. wood beam steel. wood column added.Details
the scope of work is the design of new gravity beams at the interior wall removal. this does not involve a seismic upgrade to the extg bldg. wood beam steel. wood column added. | $24,350 |
| Apr 2, 2013 | Completed final sign-off Apr 2013 | 2 Castro St | revised the 1st set of foundation plan set. revised to show 4th shear wall. double wall with footing. revision to app#201303111881Details
revised the 1st set of foundation plan set. revised to show 4th shear wall. double wall with footing. revision to app#201303111881 | $7,500 |
| Mar 11, 2013 | Completed final sign-off Apr 2013 | 2 Castro St | add 1st floor shear wall in fast-west direction.Details
add 1st floor shear wall in fast-west direction. | $14,500 |