Analysystem
- Based in
- Livermore
- On San Francisco permits
- Apr 2001 to Dec 2002
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2002 | Completed final sign-off Mar 2003 | 300 Beale St | remodel exist hvac system. replace old unit with new fc. reroute duct @ space d,use exist equip inDetails
remodel exist hvac system. replace old unit with new fc. reroute duct @ space d,use exist equip in | $15,000 |
| Apr 6, 2001 | Expired or cancelled expired Apr 2002 | 1855 Haight St | the installation of fire evaprotine coolers for sales floor ductwork,plmbg @grnd flrDetails
the installation of fire evaprotine coolers for sales floor ductwork,plmbg @grnd flr | $30,000 |