Americo Builders Llc
- Based in
- Anaheim
- On San Francisco permits
- Mar 2022 to Sep 2025
- Last 24 months
- 1 permit filed
6 permits since 2000: 2 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2025 | In progress issued Sep 2025 | 133 02nd St | non structural interior demo of partitons, millwork, flooring and finishes. in preparation for new tenant. ab-017Details
non structural interior demo of partitons, millwork, flooring and finishes. in preparation for new tenant. ab-017 | $25,000 |
| Sep 25, 2023 | Never finaled issued Sep 2023, no final | 3995 24th St | rev to pa# 2022-1205-7650: remove and reframe portions of interior of front window area ground fl. commercialDetails
rev to pa# 2022-1205-7650: remove and reframe portions of interior of front window area ground fl. commercial | $4,000 |
| Dec 23, 2022 | Never finaled issued Mar 2023, no final | 710 03rd St | tenant improvement to (e) taco bell cantina restaurant. work includes renovation of kitchen, customer area, restroom, removal of 1 restroom, creation of new cooler/freezer walk-in, along with associated mep.Details
tenant improvement to (e) taco bell cantina restaurant. work includes renovation of kitchen, customer area, restroom, removal of 1 restroom, creation of new cooler/freezer walk-in, along with associated mep. | $150,000 |
| Dec 5, 2022 | Never finaled issued Apr 2023, no final | 3995 24th St | remodel (e) starbucks store updated beverage prep casework, install relocated beverage prep equipment, install new floor/wall updated lighting, minor plumbing/ mechanicalDetails
remodel (e) starbucks store updated beverage prep casework, install relocated beverage prep equipment, install new floor/wall updated lighting, minor plumbing/ mechanical | $195,000 |
| Oct 18, 2022 | Completed final sign-off Feb 2023 | 2040 Chestnut St | revision to pa#202203220552. added new water pump room. relocating kitchen equipment, adding new exhaust fan to water pump room. install wood medallion above storefront.Details
revision to pa#202203220552. added new water pump room. relocating kitchen equipment, adding new exhaust fan to water pump room. install wood medallion above storefront. | |
| Mar 22, 2022 | Completed final sign-off Mar 2023 | 2040 Chestnut St | ti to an existing building, formerly clothing retail (gap), change of use to a restaurant. modifications include new wall partition, ceilings, mep for fast casual salad restaurant (sweet greens).Details
ti to an existing building, formerly clothing retail (gap), change of use to a restaurant. modifications include new wall partition, ceilings, mep for fast casual salad restaurant (sweet greens). | $500,000 |