American Kitchen Company
- Based in
- Concord
- On San Francisco permits
- Sep 2017 to Feb 2025
- Last 24 months
- 1 permit filed
15 permits since 2000: 13 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2025 | Completed final sign-off Apr 2025 | 239 Brannan St | unit 5j- kitchen remodel-replace countertops sinks and faucet. new microwave, widen (e) 42 in opening to appx. 70 in (e) non load bearing wall all mep to code in work area (e) lighting fixtures to remainDetails
unit 5j- kitchen remodel-replace countertops sinks and faucet. new microwave, widen (e) 42 in opening to appx. 70 in (e) non load bearing wall all mep to code in work area (e) lighting fixtures to remain | $22,400 |
| May 23, 2022 | Completed final sign-off Apr 2023 | 2937 Griffith St | kitchen remodel. remove load & non-load bearing walls, same location sink, fridge, dw, range & vent. remove / fill in of window. new cabinets, counters. enclosing porch.raise floor to level with ourside ground. new walls, door, and window. bring electrical & plumbing to code.Details
kitchen remodel. remove load & non-load bearing walls, same location sink, fridge, dw, range & vent. remove / fill in of window. new cabinets, counters. enclosing porch.raise floor to level with ourside ground. new walls, door, and window. bring electrical & plumbing to code. | $50,000 |
| Jan 11, 2022 | Never finaled issued Jan 2022, no final | 285 Madison St | 2 bathroom remodel inkind. bathroom #1 and #2 same foot print, same location , toilet, vanity, and tub/shower. new flooring. replace shower head with plumbing, replace tub. in kind.Details
2 bathroom remodel inkind. bathroom #1 and #2 same foot print, same location , toilet, vanity, and tub/shower. new flooring. replace shower head with plumbing, replace tub. in kind. | $40,000 |
| Aug 17, 2020 | Completed final sign-off Nov 2021 | 219 Brannan St | remodeling apartment:electrical & plmg to code in work in areas. converting alcove into den-expanding/converting extg laundry area into closet space. bldg nw wall with door to close off den. remodeling master suite-removing extg 2nd closet in master bedroom. bldg nw entrance to master bath.Details
remodeling apartment:electrical & plmg to code in work in areas. converting alcove into den-expanding/converting extg laundry area into closet space. bldg nw wall with door to close off den. remodeling master suite-removing extg 2nd closet in master bedroom. bldg nw entrance to master bath. | $35,000 |
| Nov 8, 2019 | Completed final sign-off Feb 2020 | 715 Darien Wy | kithcen remodel. no structural work, like for like. 15'x16' 225 sf replace appliances and sink. new cabinets, counter, backsplash, flooring, new fixtures, under cabinet lighting. bring all electrical and plumbing up to code.Details
kithcen remodel. no structural work, like for like. 15'x16' 225 sf replace appliances and sink. new cabinets, counter, backsplash, flooring, new fixtures, under cabinet lighting. bring all electrical and plumbing up to code. | $60,348 |
| Sep 17, 2019 | Completed final sign-off Aug 2020 | 1650 Jackson St | unit 509 - kitchen remodelDetails
unit 509 - kitchen remodel | $52,041 |
| Sep 12, 2019 | Never finaled issued Sep 2019, no final | 354 Bradford St | replacing 2 windows in kitchen - like for like not visible from stDetails
replacing 2 windows in kitchen - like for like not visible from st | $3,000 |
| Aug 13, 2019 | Completed final sign-off Jan 2020 | 354 Bradford St | kitchen remodel, bring electrical and plumbing to code. relocate range & vent, (n) vent stack, replace appliances, (n) cabinets, counters, replace flooring.Details
kitchen remodel, bring electrical and plumbing to code. relocate range & vent, (n) vent stack, replace appliances, (n) cabinets, counters, replace flooring. | $30,000 |
| Aug 7, 2019 | Completed final sign-off Jan 2020 | 649 Darien Wy | master bath remodel- replace outlets w/ gfci, new lighting, new exhaust fan, replace plumbing fixtures - sink, toilet, tub, let & rain shower heads, replace cabinets, counters & flooring.Details
master bath remodel- replace outlets w/ gfci, new lighting, new exhaust fan, replace plumbing fixtures - sink, toilet, tub, let & rain shower heads, replace cabinets, counters & flooring. | $21,000 |
| May 29, 2019 | Completed final sign-off Aug 2019 | 2031 28th Av | kitchen remodel: bring electrical/plumbing to code, new cabinets, counters, replce appliances, sink & penninsula. rmeove soffit. like for like replacement. no layout changes.Details
kitchen remodel: bring electrical/plumbing to code, new cabinets, counters, replce appliances, sink & penninsula. rmeove soffit. like for like replacement. no layout changes. | $18,000 |
| Jan 23, 2019 | Completed final sign-off Jun 2019 | 219 Brannan St | kitchen & bathroom remodel like for like. replace cabinets, counter sink, appliances, electrical & plumbing to code. add second sink to bathroom. no alteration of wall, window or door.Details
kitchen & bathroom remodel like for like. replace cabinets, counter sink, appliances, electrical & plumbing to code. add second sink to bathroom. no alteration of wall, window or door. | $43,000 |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 229 Brannan St | kitchen remodel and (2) bathroom remodels. same footprint. electrical and plumbing to code. new counters, sink, replace range and hood. install 240 outlet behind range, pot filler, new toilet, add shower head, add heated floor tiles.Details
kitchen remodel and (2) bathroom remodels. same footprint. electrical and plumbing to code. new counters, sink, replace range and hood. install 240 outlet behind range, pot filler, new toilet, add shower head, add heated floor tiles. | $25,000 |
| Aug 24, 2018 | Completed final sign-off Dec 2018 | 700 Myra Wy | kitchen & bath remodel - elecrical & plumbing to code, replace cabinets, counter, sinks, recessed lights, floor range, dishwasher, new vent & roof jack, replace toilet, shower drain, new exaust vent floorDetails
kitchen & bath remodel - elecrical & plumbing to code, replace cabinets, counter, sinks, recessed lights, floor range, dishwasher, new vent & roof jack, replace toilet, shower drain, new exaust vent floor | $36,000 |
| Feb 21, 2018 | Completed final sign-off Jul 2018 | 649 Darien Wy | kitchen remodel, new layout, new flooring, move hvac vent, new door, update electrical, plumbing, run new gas line.Details
kitchen remodel, new layout, new flooring, move hvac vent, new door, update electrical, plumbing, run new gas line. | $50,000 |
| Sep 22, 2017 | Completed final sign-off Jan 2018 | 755 45th Av | kitchen & bathroom remodel. no walls moved. removed added or infilled. all (e) layouts to remain unchanged.Details
kitchen & bathroom remodel. no walls moved. removed added or infilled. all (e) layouts to remain unchanged. | $25,000 |