Amd Construct Llc
- Based in
- San Jose
- On San Francisco permits
- Dec 2024 to Aug 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 1 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2026 | In progress issued Aug 2026 | 208 Lake Merced Hill St North St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $15,000 |
| Dec 3, 2024 | Completed final sign-off Mar 2025 | 2211 California St | unit #301: removal and replacement of the shower and drain, installation of new tiling floor and tiled shower surround. replacement of the vanity, installation of exhaust fan, replacement of the switches & outlets in the bathroom, replacement of the plumbing. no wall demolition or construction.Details
unit #301: removal and replacement of the shower and drain, installation of new tiling floor and tiled shower surround. replacement of the vanity, installation of exhaust fan, replacement of the switches & outlets in the bathroom, replacement of the plumbing. no wall demolition or construction. | $10,000 |