Alvarez Construction & Tile, Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Oct 2026
- Last 24 months
- 16 permits filed
126 permits since 2000: 98 completed, 5 in progress, 17 never finaled, 6 expired or cancelled.
Of the 17 never-finaled permits, 5 are 3 to 5 years old, 4 are 5 to 10 years old, 8 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 126.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2026 | In progress issued Oct 2026 | 3229 Jennings St | response to nov 202661595 to restore grade at basement and infill opening in wallDetails
response to nov 202661595 to restore grade at basement and infill opening in wall | $10,000 |
| Sep 10, 2026 | In progress issued Sep 2026 | 1270 03rd Av | 1/f - remodel unit throughout, new plumbing, new electrical, new kitchen, new bathrooms, create new opening, install new header per drawing. 2/f - remodel unit throughout, new plumbing, new electrical, remodel kitchen + bath. add 2 bathrooms on first floor-unit#1274 & 2nd fl unit#1272 respectivelyDetails
1/f - remodel unit throughout, new plumbing, new electrical, new kitchen, new bathrooms, create new opening, install new header per drawing. 2/f - remodel unit throughout, new plumbing, new electrical, remodel kitchen + bath. add 2 bathrooms on first floor-unit#1274 & 2nd fl unit#1272 respectively | $215,000 |
| Jun 9, 2026 | Completed final sign-off Aug 2026 | 4381 25th St | remodel bathroom in kind - no structural. new plumbing, electrical, tile, & paint.Details
remodel bathroom in kind - no structural. new plumbing, electrical, tile, & paint. | $25,000 |
| Jun 5, 2026 | Completed final sign-off Jun 2026 | 3229 Jennings St | comply with complaint 202657040. handrail at staircase.Details
comply with complaint 202657040. handrail at staircase. | $200 |
| May 6, 2026 | Completed final sign-off May 2026 | 1153 Guerrero St | to obtain final inspection for work approved under pa# 201203015217, 201204208839, 202204293328. all work is completeDetails
to obtain final inspection for work approved under pa# 201203015217, 201204208839, 202204293328. all work is complete | |
| May 4, 2026 | In progress issued May 2026 | 3229 Jennings St | to comply with his 202180531-remove illegally built roof dormer above (e) 1 story garage, repair weatherproofing siding/trim/sills at 1st floor , exterior wall along jamestown ave. not visible street. replace (e) non conforming windows on 1st floor at bedroom 1 and replace an eero conforming window.Details
to comply with his 202180531-remove illegally built roof dormer above (e) 1 story garage, repair weatherproofing siding/trim/sills at 1st floor , exterior wall along jamestown ave. not visible street. replace (e) non conforming windows on 1st floor at bedroom 1 and replace an eero conforming window. | $2,000 |
| Apr 29, 2026 | Expired or cancelled withdrawn Jul 2026 | 3229 Jennings St | to comply with nov #2020-021241: replace gas furnace and associated duct work in a sfr.Details
to comply with nov #2020-021241: replace gas furnace and associated duct work in a sfr. | $8,000 |
| Oct 23, 2025 | Completed final sign-off May 2026 | 1153 Guerrero St | 1. l1 unit 1153: construct about 30 lineal feet of non-bearing partion wall; l2 unit 1153: (n) door for (n) eero from (n) bedroom to protected path of travel to public right of way; l3 unit 1155: (n) door for (n) eero from (n) bedroom to protected path of travel.Details
1. l1 unit 1153: construct about 30 lineal feet of non-bearing partion wall; l2 unit 1153: (n) door for (n) eero from (n) bedroom to protected path of travel to public right of way; l3 unit 1155: (n) door for (n) eero from (n) bedroom to protected path of travel. | $49,326 |
| Aug 12, 2025 | Completed final sign-off Sep 2025 | 139 Alhambra St | legalization of kitchen remodel at unit 141 alahambra, and window replacement of 20 windows all non street visible for both unit 139 & 141 alahambra st (no plans).Details
legalization of kitchen remodel at unit 141 alahambra, and window replacement of 20 windows all non street visible for both unit 139 & 141 alahambra st (no plans). | $9,500 |
| Aug 12, 2025 | Completed final sign-off Sep 2025 | 139 Alhambra St | 139-141 alhambra st to comply w/ physical inspection report# cc 8714Details
139-141 alhambra st to comply w/ physical inspection report# cc 8714 | $300 |
| Aug 5, 2025 | In progress issued Aug 2025 | 2666 Greenwich St | kitchen remodel: create wider opening at kitchen, new electrical and plumbing per drawings.Details
kitchen remodel: create wider opening at kitchen, new electrical and plumbing per drawings. | $80,000 |
| Jun 9, 2025 | Completed final sign-off Nov 2025 | 3236 Jennings St | correct nov #202538527 & #202538296 2a) repair front entry landing apprx 4' x 6'. 2b) replace dryer ducting from interior to exterior and paint 2c) replace two doors with 20 min rated. plumbing + electrical work per nov's. replace damage sheetrock as requiredDetails
correct nov #202538527 & #202538296 2a) repair front entry landing apprx 4' x 6'. 2b) replace dryer ducting from interior to exterior and paint 2c) replace two doors with 20 min rated. plumbing + electrical work per nov's. replace damage sheetrock as required | $10,000 |
| May 13, 2025 | Completed final sign-off Apr 2026 | 1853 Hyde St | units (1855 and 1857) kitchens remodel in kind: upgrade countertops, cabinets, new plumbing, new appliances, new paint, (drywall and insulation as needed)Details
units (1855 and 1857) kitchens remodel in kind: upgrade countertops, cabinets, new plumbing, new appliances, new paint, (drywall and insulation as needed) | $60,000 |
| Feb 10, 2025 | Completed final sign-off Jun 2025 | 3350 Laguna St | unit 101: kitchen remodel - create new opening b/t kitchen and living room. install new electrical and plumbing per plan. install new cabinets, countertops and appliances. master bathroom remodel - install new shower pan, drain, new valve, new toilet, new sink, new tile and new paint.Details
unit 101: kitchen remodel - create new opening b/t kitchen and living room. install new electrical and plumbing per plan. install new cabinets, countertops and appliances. master bathroom remodel - install new shower pan, drain, new valve, new toilet, new sink, new tile and new paint. | $40,000 |
| Nov 25, 2024 | Completed final sign-off Dec 2024 | 2848 California St | revision to bpa: 202411205418 to correct unit number from "7" to unit "8"Details
revision to bpa: 202411205418 to correct unit number from "7" to unit "8" | |
| Nov 20, 2024 | Completed final sign-off Dec 2024 | 2848 California St | unit #7: 1 bathroom remodel in kind- install new plumbing fixtrues, new tub, new sink, new faucet, new fan, new gfci outlet, new tile.Details
unit #7: 1 bathroom remodel in kind- install new plumbing fixtrues, new tub, new sink, new faucet, new fan, new gfci outlet, new tile. | $25,000 |
| Jul 17, 2024 | Completed final sign-off Jul 2025 | 1840 Castro St | replace exterior street facing window due to dryrot. replace window in kind (approx 97" x 56") repair 50 sq ft of dryrot at rear of houseDetails
replace exterior street facing window due to dryrot. replace window in kind (approx 97" x 56") repair 50 sq ft of dryrot at rear of house | $5,000 |
| Jul 12, 2024 | Completed final sign-off Aug 2024 | 2249 Bay St | partial foundation replacement located at the rear of the property. approx. 28' in length.Details
partial foundation replacement located at the rear of the property. approx. 28' in length. | $25,000 |
| Jun 27, 2024 | Completed final sign-off Sep 2024 | 385 Gambier St | remodel bathroom in kind. replace tub, toilet, shower valves, update electrical. install new tile throughout bathroomDetails
remodel bathroom in kind. replace tub, toilet, shower valves, update electrical. install new tile throughout bathroom | $20,000 |
| Jun 12, 2024 | Completed final sign-off Jul 2024 | 759 33rd Av | markoff structural pest control termite report#23829 hems#2-8 repair in kind.Details
markoff structural pest control termite report#23829 hems#2-8 repair in kind. | $20,000 |
| Apr 18, 2024 | In progress issued Apr 2024 | 10 Mirabel Av | replace 10 windows at rear with same size windows as (e) opening single pane to double paneDetails
replace 10 windows at rear with same size windows as (e) opening single pane to double pane | $4,000 |
| Feb 2, 2024 | Completed final sign-off May 2024 | 2249 Bay St | bathroom remodel. new plumbing, new electrical, new tile, new drywall and new paint.Details
bathroom remodel. new plumbing, new electrical, new tile, new drywall and new paint. | $40,000 |
| Jan 12, 2024 | Completed final sign-off Jan 2024 | 608 Santiago St | repair dryrot at back of stairs less than 50% in kindDetails
repair dryrot at back of stairs less than 50% in kind | $3,000 |
| Oct 5, 2023 | Completed final sign-off Dec 2023 | 1840 Castro St | install back staircase-new exterior stair.Details
install back staircase-new exterior stair. | $30,000 |
| Sep 1, 2023 | Completed final sign-off Oct 2023 | 2121 Laguna St | amend bldg permit# 202308104167: add bathroom remodel in kind - new tub, new sink, electrical upgrade.Details
amend bldg permit# 202308104167: add bathroom remodel in kind - new tub, new sink, electrical upgrade. | $15,000 |
| Aug 22, 2023 | Never finaled issued Aug 2023, no final | 1335 Mariposa St | unit #7: exploratory work to identify orientation of framing. one 3'x3' hole on the 3rd floor. patch hole to match existing finishes.Details
unit #7: exploratory work to identify orientation of framing. one 3'x3' hole on the 3rd floor. patch hole to match existing finishes. | $5,000 |
| Aug 10, 2023 | Completed final sign-off Oct 2023 | 2121 Laguna St | #220: upgrade kitchen in kind: upgrade electrical with gfci outlets. install new cabinets, new countertops, new appliances, new sink and faucet.Details
#220: upgrade kitchen in kind: upgrade electrical with gfci outlets. install new cabinets, new countertops, new appliances, new sink and faucet. | $25,000 |
| Aug 10, 2023 | Never finaled issued Aug 2023, no final | 723 43rd Av | remodel kitchen in kind. upgrade electrical with gfci outlet. install new cabnets, new countertops, new appliances, new sink, and new faucet.Details
remodel kitchen in kind. upgrade electrical with gfci outlet. install new cabnets, new countertops, new appliances, new sink, and new faucet. | $25,000 |
| Aug 7, 2023 | Never finaled issued Aug 2023, no final | 1112 18th St | exploratory work to determine embedment and width of the existing concrete foundation. to be patched and repaired after.Details
exploratory work to determine embedment and width of the existing concrete foundation. to be patched and repaired after. | $5,000 |
| Aug 3, 2023 | Never finaled issued Aug 2023, no final | 723 43rd Av | exploratory work to determine embedment and width of the existing concrete foundation. to be patched and repaired after.Details
exploratory work to determine embedment and width of the existing concrete foundation. to be patched and repaired after. | $5,000 |
| Jul 5, 2023 | Completed final sign-off Aug 2023 | 1378 12th Av | bathroom & powder room remodel in-kind no structural work. bath - install new tub, new tub and shower valve, new toilet, new dry wall, new tile, new switches and lighting. powder room - install new toilet, new sink, new tileDetails
bathroom & powder room remodel in-kind no structural work. bath - install new tub, new tub and shower valve, new toilet, new dry wall, new tile, new switches and lighting. powder room - install new toilet, new sink, new tile | $21,000 |
| Nov 8, 2022 | Completed final sign-off Jan 2023 | 8 Mirabel Av | remodel one kitchen and one bathroom in-kind. no wall removalDetails
remodel one kitchen and one bathroom in-kind. no wall removal | $20,000 |
| Oct 13, 2022 | Completed final sign-off Nov 2022 | 2647 38th Av | remodel bathroom in-kindDetails
remodel bathroom in-kind | $23,000 |
| Jun 28, 2022 | Completed final sign-off Feb 2023 | 65 Venus St | remodel 1 bathroom in kind - upgrade electrical and plumbing, new fixtures. 50 sqft. non-structural.Details
remodel 1 bathroom in kind - upgrade electrical and plumbing, new fixtures. 50 sqft. non-structural. | $12,000 |
| May 31, 2022 | Never finaled issued May 2022, no final | 1620 Lawton St | one kitchen: upgrade 160 sqft kitchen in-kind, no structural, new cabinets, new appliances, new fixtures, new garbage disposal. (3) bathrooms: install new toilet, new shower drain, new shower faucet. all bathrooms in-kind replacement.Details
one kitchen: upgrade 160 sqft kitchen in-kind, no structural, new cabinets, new appliances, new fixtures, new garbage disposal. (3) bathrooms: install new toilet, new shower drain, new shower faucet. all bathrooms in-kind replacement. | $50,000 |
| Apr 29, 2022 | Expired or cancelled expired May 2026 | 1153 Guerrero St | emergency shoring of existing enclosed rear porch. this is connected to nov #201196606 & #202040971 (rebuilt of stairs/porch under separate permit).Details
emergency shoring of existing enclosed rear porch. this is connected to nov #201196606 & #202040971 (rebuilt of stairs/porch under separate permit). | $25,000 |
| Apr 11, 2022 | Completed final sign-off Jul 2022 | 1227 Waller St | to comply with nov #201848581: replace siding at side and rear. paint back of building. entire rear & both sides.Details
to comply with nov #201848581: replace siding at side and rear. paint back of building. entire rear & both sides. | $60,000 |
| Apr 1, 2022 | Completed final sign-off May 2022 | 434 19th Av | remodel kitchen in-kind: new electrical & plumbing. instlal new kitchen cabinets, appliances, countertops.Details
remodel kitchen in-kind: new electrical & plumbing. instlal new kitchen cabinets, appliances, countertops. | $25,000 |
| Jan 5, 2022 | Completed final sign-off May 2026 | 1153 Guerrero St | interior remodel. creation of new habitable space at the ground (garage) level. new foundation.Details
interior remodel. creation of new habitable space at the ground (garage) level. new foundation. | $100,000 |
| Nov 16, 2021 | Completed final sign-off Feb 2022 | 57 Benton Av | add new bedroom on g/f with new window on the side of property and kitchen remodeling on the main floor.Details
add new bedroom on g/f with new window on the side of property and kitchen remodeling on the main floor. | $40,000 |
| Sep 30, 2021 | Never finaled issued Sep 2021, no final | 2082 Revere Av | upgrade kitchen in kind - new drywall, new cabinets and counters, upgrade electrical and plumbing, new appliances. upgrade bathroom in kind - new bathtub, toilet, sink and new faucet. non structural.Details
upgrade kitchen in kind - new drywall, new cabinets and counters, upgrade electrical and plumbing, new appliances. upgrade bathroom in kind - new bathtub, toilet, sink and new faucet. non structural. | $25,000 |
| Aug 17, 2021 | Completed final sign-off Nov 2021 | 436 19th Av | one kitchen remodel in-kind new electrical & new plumbing. installl new kitchen cabinets, appliances, countertops, (150 sqft. at ktichen) non structural. roof-replace roof-18 square/touchdown. lights per cec 150.0 kDetails
one kitchen remodel in-kind new electrical & new plumbing. installl new kitchen cabinets, appliances, countertops, (150 sqft. at ktichen) non structural. roof-replace roof-18 square/touchdown. lights per cec 150.0 k | $50,000 |
| Jul 26, 2021 | Completed final sign-off Oct 2021 | 249 Gambier St | kitchen remodel in kind-new cabinets, new counters,new appliances,new flooring, new paint, upgrade elect as needed. appox 140 sq ft. bathrm remdel in-kind: new tile, new fixtures, new paint, approx 60 sq.ft. no wall alteration.Details
kitchen remodel in kind-new cabinets, new counters,new appliances,new flooring, new paint, upgrade elect as needed. appox 140 sq ft. bathrm remdel in-kind: new tile, new fixtures, new paint, approx 60 sq.ft. no wall alteration. | $45,000 |
| Apr 28, 2021 | Completed final sign-off Nov 2021 | 853 Page St | kitchen remodel - approx 120 sq ft. install new counters, upgrade laundry hookups. upgrade electrical & plumbing. bath: new tub,new toilet,new sink,new tiles,upgrade electrical.Details
kitchen remodel - approx 120 sq ft. install new counters, upgrade laundry hookups. upgrade electrical & plumbing. bath: new tub,new toilet,new sink,new tiles,upgrade electrical. | $25,000 |
| Apr 7, 2021 | Completed final sign-off May 2021 | 2122 47th Av | repair approx 40 sf at front of building. remove stucco, replace dryrot wood and re-install stuccoDetails
repair approx 40 sf at front of building. remove stucco, replace dryrot wood and re-install stucco | $5,000 |
| Feb 18, 2021 | Completed final sign-off Jul 2021 | 331 Octavia St | unit 8: remodel 600 sqft studio- upgrade bathroom plumbing, electrical, new tile, fixtures. upgrade kitchen - new stove, fridge, dishwasherDetails
unit 8: remodel 600 sqft studio- upgrade bathroom plumbing, electrical, new tile, fixtures. upgrade kitchen - new stove, fridge, dishwasher | $15,000 |
| Jan 12, 2021 | Completed final sign-off Mar 2021 | 2501 47th Av | kitchen upgrade cabinets, counter, appliances, bathroom. new bath tub, sink, fixtures, toiletDetails
kitchen upgrade cabinets, counter, appliances, bathroom. new bath tub, sink, fixtures, toilet | $35,000 |
| Nov 18, 2020 | Completed final sign-off Jan 2021 | 653 San Jose Av | kitchen: replace countertops, install new sink & faucet (12'x12'). toilet room: install new toilet & new tile. laundry room: install new washer/dryer hookups. bathroom: install new tub/shower, sink (6'2"x7')Details
kitchen: replace countertops, install new sink & faucet (12'x12'). toilet room: install new toilet & new tile. laundry room: install new washer/dryer hookups. bathroom: install new tub/shower, sink (6'2"x7') | $18,000 |
| Sep 22, 2020 | Completed final sign-off Nov 2020 | 31 Highland Av | amend to 202006228979: bathroom upgrades - install new sink, install new toilet. install laundry hookups. to comply with complaint 202055901.Details
amend to 202006228979: bathroom upgrades - install new sink, install new toilet. install laundry hookups. to comply with complaint 202055901. | $4,000 |
| Sep 9, 2020 | Completed final sign-off Mar 2021 | 2501 47th Av | add storage room & bathroom on ground fl. install new electrical, controls & lighting on ground fl.Details
add storage room & bathroom on ground fl. install new electrical, controls & lighting on ground fl. | $15,000 |
| Jun 26, 2020 | Completed final sign-off Jan 2021 | 4619 Ulloa St | master bathroom remodel (8ftx5ft)- replace toilet, sink, faucet, shower, shower valve. guest bathroom remodel (7ftx5ft) - toilet, sink sink faucet, bathtub, tub and shower valve. kitchen remodel(9ft x13ft)- replace cabinetry, dishwasher, sink. upgrade non-grounded outlets. all work in kind.Details
master bathroom remodel (8ftx5ft)- replace toilet, sink, faucet, shower, shower valve. guest bathroom remodel (7ftx5ft) - toilet, sink sink faucet, bathtub, tub and shower valve. kitchen remodel(9ft x13ft)- replace cabinetry, dishwasher, sink. upgrade non-grounded outlets. all work in kind. | $25,000 |
| Jun 22, 2020 | Completed final sign-off Nov 2020 | 31 Highland Av | replace kitchen cabinets like for likeDetails
replace kitchen cabinets like for like | $10,000 |
| May 27, 2020 | Completed final sign-off Sep 2020 | 331 Octavia St | unit 12. bathroom and kitchen remodel and electrical upgrade throughout unit. all remodel work in-kind.Details
unit 12. bathroom and kitchen remodel and electrical upgrade throughout unit. all remodel work in-kind. | $30,000 |
| Feb 4, 2020 | Completed final sign-off Jan 2024 | 1901 Balboa St | convert existing 1st floor commerical space to residential use as density conforming unit. new dwelling unit will addd 2 new bedrooms, 1 bathroom, living space, and kitchen.Details
convert existing 1st floor commerical space to residential use as density conforming unit. new dwelling unit will addd 2 new bedrooms, 1 bathroom, living space, and kitchen. | $97,000 |
| Nov 1, 2019 | Completed final sign-off Jul 2020 | 1227 Waller St | kitchen and bathroom remodel; replace tile and plumbing fixtures in bathroom. replace kitchen counters, cabinets and appliances. no structural workDetails
kitchen and bathroom remodel; replace tile and plumbing fixtures in bathroom. replace kitchen counters, cabinets and appliances. no structural work | $35,000 |
| Jun 13, 2019 | Completed final sign-off Aug 2019 | 832 Bay St | kitchen remodel on 2nd floor. remove the extg non bearing wall, open the extg kitchen to living room. remodel one bathroomDetails
kitchen remodel on 2nd floor. remove the extg non bearing wall, open the extg kitchen to living room. remodel one bathroom | $12,000 |
| May 20, 2019 | Completed final sign-off Aug 2019 | 1373 Page St | foundation repair at 1st flr.Details
foundation repair at 1st flr. | $50,000 |
| Apr 4, 2019 | Completed final sign-off May 2019 | 3092 16th St | replace tile entry with concrete 40 sq ftDetails
replace tile entry with concrete 40 sq ft | $10,000 |
| Feb 26, 2019 | Completed final sign-off Apr 2019 | 1227 Waller St | repair broken handrail in-kind, per complaint #201929031. no other work to be performed.Details
repair broken handrail in-kind, per complaint #201929031. no other work to be performed. | $500 |
| Jan 25, 2019 | Completed final sign-off Jun 2019 | 149 Lake Merced Hill St South St | remodel two bathrooms and 1 powder room: new plumbing fixtures, new tile.Details
remodel two bathrooms and 1 powder room: new plumbing fixtures, new tile. | $22,000 |
| Jul 24, 2018 | Completed final sign-off Jul 2018 | 141 Moneta Wy | remodel kitchen: replace existing cabinets, replace countertops, sink, faucet and appliances.Details
remodel kitchen: replace existing cabinets, replace countertops, sink, faucet and appliances. | $10,000 |
| May 7, 2018 | Never finaled issued May 2018, no final | 141 Moneta Wy | remodel (e) bathroom on upper level. install new tub, toilet, sink, tub and shower valve, sink faucet and tiles. no structural. no change in walls and opening layout.Details
remodel (e) bathroom on upper level. install new tub, toilet, sink, tub and shower valve, sink faucet and tiles. no structural. no change in walls and opening layout. | $12,000 |
| Mar 1, 2018 | Completed final sign-off May 2018 | 851 Page St | replace 100 l.f. extg brick foundation with concrete footing and foundation in garage area not visible from street. replace brick wall under stairs where accesible not visible from street.Details
replace 100 l.f. extg brick foundation with concrete footing and foundation in garage area not visible from street. replace brick wall under stairs where accesible not visible from street. | $20,000 |
| Sep 14, 2017 | Never finaled filed Sep 2017, never issued | 1461 14th Av | repair & replace rear deck and construct two (n) fire rated walls at property line.Details
repair & replace rear deck and construct two (n) fire rated walls at property line. | $10,000 |
| Aug 25, 2017 | Never finaled issued Aug 2017, no final | 331 Octavia St | remove old siding, repair dryrot, intstall like siding. not visible to street.Details
remove old siding, repair dryrot, intstall like siding. not visible to street. | $80,000 |
| Jul 17, 2017 | Completed final sign-off Feb 2019 | 1746 Page St | seismic retrofit per mandatory stoft story retrofit per sfebc chapter 4d, 2016 iebc appendix a4.Details
seismic retrofit per mandatory stoft story retrofit per sfebc chapter 4d, 2016 iebc appendix a4. | $20,000 |
| May 30, 2017 | Expired or cancelled cancelled Jan 2026 | 1461 14th Av | exterior window replacementDetails
exterior window replacement | $8,500 |
| Feb 28, 2017 | Completed final sign-off Jun 2017 | 2661 Pine St | revision pa #201701106822 - story story seismic retorfit, replace/reinforce (e) brick foundation w/new conc foundation.Details
revision pa #201701106822 - story story seismic retorfit, replace/reinforce (e) brick foundation w/new conc foundation. | $20,000 |
| Feb 27, 2017 | Completed final sign-off Aug 2017 | 72 Pearl St | repair water damage on four hollway drywall wall & ceiling. replace plaster with 5/8 sheet rock type x.Details
repair water damage on four hollway drywall wall & ceiling. replace plaster with 5/8 sheet rock type x. | $20,000 |
| Feb 1, 2017 | Completed final sign-off Mar 2017 | 101 Lombard St | bathroom remodelDetails
bathroom remodel | $13,000 |
| Jan 10, 2017 | Completed final sign-off Jun 2017 | 2661 Pine St | soft story program seismic retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.Details
soft story program seismic retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $20,000 |
| Dec 30, 2016 | Completed final sign-off Mar 2018 | 1461 14th Av | interior remodel - new bedroom, new bathrooom, new laundry at 1st floor. no exterior work.Details
interior remodel - new bedroom, new bathrooom, new laundry at 1st floor. no exterior work. | $30,000 |
| Aug 15, 2016 | Completed final sign-off Oct 2016 | 2344 Van Ness Av | apt 1 & 2: remodel 2 bathrooms, replace electrical 2 units, new sheetrock, new paint, new floor as needed.Details
apt 1 & 2: remodel 2 bathrooms, replace electrical 2 units, new sheetrock, new paint, new floor as needed. | $40,000 |
| Jul 11, 2016 | Completed final sign-off Sep 2016 | 331 Octavia St | unit #6: kitchen and bathroom remodel - new cabinets, new appliances, new plubming fixtures, new tile, new paint upgrade electrical, repair damged walls, etc, (in kind) to comply with n.o.v. 201551614Details
unit #6: kitchen and bathroom remodel - new cabinets, new appliances, new plubming fixtures, new tile, new paint upgrade electrical, repair damged walls, etc, (in kind) to comply with n.o.v. 201551614 | $18,000 |
| Jun 28, 2016 | Completed final sign-off Oct 2016 | 724 Innes Av | repair (e) deck at rear of building in-kind, less than 50% repair.Details
repair (e) deck at rear of building in-kind, less than 50% repair. | $5,000 |
| Jun 27, 2016 | Never finaled issued Jun 2016, no final | 1461 14th Av | remodel bathroom: install new toilet, shower & tub valve, new vanity sink, new tiles, three lights, two switches, new paint. no structural.Details
remodel bathroom: install new toilet, shower & tub valve, new vanity sink, new tiles, three lights, two switches, new paint. no structural. | $15,000 |
| Jun 20, 2016 | Completed final sign-off Sep 2016 | 1560 Greenwich St | amend permit #201604255650. submit plans for stairs repair. replace in kind tile finishDetails
amend permit #201604255650. submit plans for stairs repair. replace in kind tile finish | |
| Apr 13, 2016 | Completed final sign-off Jun 2016 | 331 Octavia St | unit #23 remodel one bathroom & one kitchen in-kind in unit #23, no new wall & no existing wall relocation. lighting in kitchen & bathroom remodel shall comply with cec 150.0(k)3 & 5. new sheet rock where used shall be 5/8" type x gyp. board.Details
unit #23 remodel one bathroom & one kitchen in-kind in unit #23, no new wall & no existing wall relocation. lighting in kitchen & bathroom remodel shall comply with cec 150.0(k)3 & 5. new sheet rock where used shall be 5/8" type x gyp. board. | $18,000 |
| Feb 10, 2016 | Completed final sign-off May 2016 | 1457 Sanchez St | remodel kitchen install new cabinets new counters, new appliances, new electrical new plumbingm remodel bathroom new tile new fixtures, new gas heaterDetails
remodel kitchen install new cabinets new counters, new appliances, new electrical new plumbingm remodel bathroom new tile new fixtures, new gas heater | $18,000 |
| Dec 1, 2015 | Completed final sign-off Feb 2016 | 331 Octavia St | work in unit #1: kitchen and bathroom remodel. new plumbing, new electrical, new cabinets, new appliances, new fixtures.Details
work in unit #1: kitchen and bathroom remodel. new plumbing, new electrical, new cabinets, new appliances, new fixtures. | $16,000 |
| Dec 1, 2015 | Never finaled issued Dec 2015, no final | 1227 Waller St | kitchen -bathroom remodel. new electrical and new plumbing, new cabinets, new appliances, new fixtures.Details
kitchen -bathroom remodel. new electrical and new plumbing, new cabinets, new appliances, new fixtures. | $25,000 |
| Nov 24, 2015 | Completed final sign-off May 2019 | 2344 Van Ness Av | soft story program seismic retrofit per sfbc chapter 34b; 2012 iebc a.4; maher n/aDetails
soft story program seismic retrofit per sfbc chapter 34b; 2012 iebc a.4; maher n/a | $20,000 |
| Nov 12, 2015 | Completed final sign-off Feb 2016 | 331 Octavia St | to obtain final inspection for work approved under pa 2014-0404-2446. all work is complete. repair dryrot correct crack on stucco per nov 201456501Details
to obtain final inspection for work approved under pa 2014-0404-2446. all work is complete. repair dryrot correct crack on stucco per nov 201456501 | |
| Aug 20, 2015 | Completed final sign-off Nov 2015 | 1227 Waller St | unit #3: remodel kitchen & bathroom, new electrical & plumbing. replace windows & dry rot. 5 windows visible from street & 4 at the back.Details
unit #3: remodel kitchen & bathroom, new electrical & plumbing. replace windows & dry rot. 5 windows visible from street & 4 at the back. | $28,000 |
| Apr 20, 2015 | Completed final sign-off Feb 2016 | 331 Octavia St | unit 3: bathroom & kitchen remodel (replace toilet, bathroom sink, tub & shower valve, new tile, install new fan, new kitchen cabinets, new kitchen floor, new countertop).Details
unit 3: bathroom & kitchen remodel (replace toilet, bathroom sink, tub & shower valve, new tile, install new fan, new kitchen cabinets, new kitchen floor, new countertop). | $14,000 |
| Jan 27, 2015 | Completed final sign-off Feb 2015 | 971 Guerrero St | repair roof rafters (2x4); sister 2x4 to (e) 2x4. approx. 20 feet on top unitDetails
repair roof rafters (2x4); sister 2x4 to (e) 2x4. approx. 20 feet on top unit | $2,500 |
| Oct 6, 2014 | Never finaled issued Oct 2014, no final | 70 Everson St | repair shower lea, remove tile, install new shower pan, install new drain, install new shower valve, install tile.Details
repair shower lea, remove tile, install new shower pan, install new drain, install new shower valve, install tile. | $6,000 |
| Sep 29, 2014 | Never finaled issued Sep 2014, no final | 2663 Pine St | #1- kitchen & bathroom remodel, new electrical, new plumbing, new paint, new cabinets. no structural work.Details
#1- kitchen & bathroom remodel, new electrical, new plumbing, new paint, new cabinets. no structural work. | $18,000 |
| Aug 22, 2014 | Completed final sign-off Sep 2014 | 331 Octavia St | unit 14: remodel bathroom. install new plumbing fixtures, new fan, new tile, new paint.Details
unit 14: remodel bathroom. install new plumbing fixtures, new fan, new tile, new paint. | $8,500 |
| Apr 4, 2014 | Expired or cancelled expired Feb 2016 | 331 Octavia St | correction of bid nov #201456501 dated 3/18/2014. not street visible, repair dry rot, repair crack on stucco.Details
correction of bid nov #201456501 dated 3/18/2014. not street visible, repair dry rot, repair crack on stucco. | $3,500 |
| Mar 20, 2014 | Completed final sign-off May 2014 | 1373 Page St | remodel bathroom, repair dry wall, replace wall heater, paint unit, replace windows (not visibble from street), windows cxomply with section 1029 emerg. escape & rescue.Details
remodel bathroom, repair dry wall, replace wall heater, paint unit, replace windows (not visibble from street), windows cxomply with section 1029 emerg. escape & rescue. | $8,500 |
| Mar 6, 2014 | Completed final sign-off Apr 2014 | 1009 South Van Ness Av | to comply with nov.# 201452551, repair back stairs partial , item #3 less than 50%Details
to comply with nov.# 201452551, repair back stairs partial , item #3 less than 50% | $1,500 |
| Oct 15, 2013 | Completed final sign-off Feb 2014 | 28 Sola Av | repair dryrot and paint garage.Details
repair dryrot and paint garage. | $12,000 |
| Aug 26, 2013 | Completed final sign-off Oct 2013 | 1840 Castro St | revise permit #201307242709; replace existing window in kitchen not visible from street, repair dry rot u factor .4Details
revise permit #201307242709; replace existing window in kitchen not visible from street, repair dry rot u factor .4 | $300 |
| Jul 24, 2013 | Never finaled issued Jul 2013, no final | 1840 Castro St | kitchen remodel. update electrical, plumbing, install new cabinets, new tile, new counters.Details
kitchen remodel. update electrical, plumbing, install new cabinets, new tile, new counters. | $12,000 |
| Sep 6, 2012 | Completed final sign-off Oct 2012 | 3333 26th St | backstairs in-kind replacement to comply with nov 201185599.require 2nd means of egress.Details
backstairs in-kind replacement to comply with nov 201185599.require 2nd means of egress. | $14,000 |
| May 15, 2012 | Completed final sign-off Nov 2012 | 144 Capra Wy | replace kitchen cabinets on 2 kitchens, new counter tops new appliances; #144 -remodel 2 bathrms, new tile, new fixtures and #146- remodel 1 bathrm new tile new fixturesDetails
replace kitchen cabinets on 2 kitchens, new counter tops new appliances; #144 -remodel 2 bathrms, new tile, new fixtures and #146- remodel 1 bathrm new tile new fixtures | $67,000 |
| Feb 13, 2012 | Completed final sign-off Jul 2012 | 1155 Fitzgerald Av | repair wall from water, fire damged, new are = 9' x 12'. replace in kinds. no structural work.Details
repair wall from water, fire damged, new are = 9' x 12'. replace in kinds. no structural work. | $6,800 |
| Feb 13, 2012 | Completed final sign-off Mar 2012 | 379 Gambier St | bathroom remodel: install new bath tub, new faucet, new fan. no structural work. (n) lighting comply with cec 150 (k)Details
bathroom remodel: install new bath tub, new faucet, new fan. no structural work. (n) lighting comply with cec 150 (k) | $5,500 |
| Sep 30, 2011 | Completed final sign-off Jan 2013 | 118 Freelon St | installation of new wood deck, new wood pergola & new hot tub over existing roof deck.Details
installation of new wood deck, new wood pergola & new hot tub over existing roof deck. | $12,000 |