Alvarado Structural Steel
- Based in
- Daly City
- On San Francisco permits
- Jun 2018 to Dec 2025
- Last 24 months
- 5 permits filed
6 permits since 2000: 4 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 2, 2025 | Completed final sign-off Apr 2026 | 184 Graystone Tr | replace stone and tile only (no structural in kind) on 32 steps and 3 landings at front entrance staircase. re-paint the entire front facade.Details
replace stone and tile only (no structural in kind) on 32 steps and 3 landings at front entrance staircase. re-paint the entire front facade. | $30,000 |
| Nov 25, 2025 | In progress issued Nov 2025 | 144 Lakeview Av | replace 200 sf of drywall in 2 bathrooms and kitchen. no framing.Details
replace 200 sf of drywall in 2 bathrooms and kitchen. no framing. | $20,000 |
| Nov 3, 2025 | Completed final sign-off Dec 2025 | 2527 14th Av | replace 350 sf of siding on the backwallDetails
replace 350 sf of siding on the backwall | $15,000 |
| Dec 6, 2024 | Completed final sign-off Dec 2025 | 2224 Lawton St | revision to pa# 202410213357: changes made to sheet s3: added approx 14 ft of new foundation on the right side of house, and added 2 ft high max site retaining wall at rear.Details
revision to pa# 202410213357: changes made to sheet s3: added approx 14 ft of new foundation on the right side of house, and added 2 ft high max site retaining wall at rear. | $1,000 |
| Oct 21, 2024 | Completed final sign-off Dec 2025 | 2224 Lawton St | 2nd flr: complete remodel kitchen, re-configure interior stair & 2 skylights. 1st flr: remodel bathroom, add 1 bedroom, add 834 conditioned space. remove and replace siding at rear and right of bldg. repair foundation.Details
2nd flr: complete remodel kitchen, re-configure interior stair & 2 skylights. 1st flr: remodel bathroom, add 1 bedroom, add 834 conditioned space. remove and replace siding at rear and right of bldg. repair foundation. | $160,000 |
| Jun 7, 2018 | Never finaled issued Nov 2021, no final | 535 Fell St | interior remodel, expansion of living space into basement, and 3rd story addition including full seismic upgrade per sfebc 403.13. (construction type upgraded to type v-a)Details
interior remodel, expansion of living space into basement, and 3rd story addition including full seismic upgrade per sfebc 403.13. (construction type upgraded to type v-a) | $300,000 |