Alta Construction Group Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2016 to Aug 2026
- Last 24 months
- 4 permits filed
6 permits since 2000: 3 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 20 Church St | structural only revision 201612306298- to front building. eliminate approved 4 floor unit. eliminate basement unit. merge approved basement with 1 floor unit (20 church) . reconstruct rear stairs, structural scope to ref 202605010477. reduction in scope of workDetails
structural only revision 201612306298- to front building. eliminate approved 4 floor unit. eliminate basement unit. merge approved basement with 1 floor unit (20 church) . reconstruct rear stairs, structural scope to ref 202605010477. reduction in scope of work | |
| May 1, 2026 | In progress issued May 2026 | 20 Church St | reduction in scope of work, proposed revision to approved plan bpa# 201612306298 to front building. eliminate approved 4th floor unit. eliminate basement unit. merge approved basement with first floor unit (20 church). reconstruct rear stairs.Details
reduction in scope of work, proposed revision to approved plan bpa# 201612306298 to front building. eliminate approved 4th floor unit. eliminate basement unit. merge approved basement with first floor unit (20 church). reconstruct rear stairs. | |
| Mar 23, 2026 | Completed final sign-off May 2026 | 701 02nd St | replacing and relocating equipment under the hood (existing). existing btu 1126.000 and proposed 866.425 btu; same type dishwasher lease from auto chlor same kind of machineDetails
replacing and relocating equipment under the hood (existing). existing btu 1126.000 and proposed 866.425 btu; same type dishwasher lease from auto chlor same kind of machine | $5,000 |
| Sep 15, 2025 | Completed final sign-off May 2026 | 701 02nd St | replace (e) counter top in (e) bar and kitchen areas. install new "eco-grip" flooring on top of (e) ceramic floor tile and install ceramic wall tile over select areas of select walls in cooking line, prep area and storage area as shown on approved drawing a1.0. replace flooring in dining room.Details
replace (e) counter top in (e) bar and kitchen areas. install new "eco-grip" flooring on top of (e) ceramic floor tile and install ceramic wall tile over select areas of select walls in cooking line, prep area and storage area as shown on approved drawing a1.0. replace flooring in dining room. | $25,000 |
| Sep 13, 2024 | Completed final sign-off Sep 2024 | 578 Moscow St | revision to pa # 202312122375: relocate laundry at g/f. delete 4 roof skylight.Details
revision to pa # 202312122375: relocate laundry at g/f. delete 4 roof skylight. | |
| Dec 30, 2016 | Never finaled issued May 2021, no final | 20 Church St | vertical addition add a 3rd story. add 2 units @ basement & 3rd floor with 2 bathrooms & 1 bath.Details
vertical addition add a 3rd story. add 2 units @ basement & 3rd floor with 2 bathrooms & 1 bath. | $400,000 |