Alonzo Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2011 to Jun 2026
- Last 24 months
- 3 permits filed
34 permits since 2000: 23 completed, 1 in progress, 9 never finaled, 1 expired or cancelled.
Of the 9 never-finaled permits, 6 are 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jul 2026 | 1271 20th Av | to obtain final inspection for work approved under pa# 202304206124. all work is complete.Details
to obtain final inspection for work approved under pa# 202304206124. all work is complete. | |
| Apr 14, 2026 | Completed final sign-off Sep 2026 | 154 Jasper Pl | remodel an (e) kitchen. remodel an (e) full bath. add a powder room. add a new sub panel.Details
remodel an (e) kitchen. remodel an (e) full bath. add a powder room. add a new sub panel. | $48,000 |
| Mar 20, 2025 | Completed final sign-off Jul 2025 | 370 23rd Av | unit 7: remodel 1 full bathroom in kind. no moving walls.(layout remain) unit 12: remodel 1 full bathroom in kind. no moving walls. (layout remain) each bathroom approx. 35 sq ft.Details
unit 7: remodel 1 full bathroom in kind. no moving walls.(layout remain) unit 12: remodel 1 full bathroom in kind. no moving walls. (layout remain) each bathroom approx. 35 sq ft. | $26,000 |
| Apr 20, 2023 | Never finaled issued May 2023, no final | 1271 20th Av | 3/f:demo plaster & replace w/plywood/sheetrock, remodel 1-kitchen,1-full bath & 1/2 bath, add 1-sink & shower, upgrade elec & plumbing, new furnace, replace all windows; 2/f: same as 3/f reno & basement- strengtening (e)walkway adding plywood, add 2-2x10 to extg joistDetails
3/f:demo plaster & replace w/plywood/sheetrock, remodel 1-kitchen,1-full bath & 1/2 bath, add 1-sink & shower, upgrade elec & plumbing, new furnace, replace all windows; 2/f: same as 3/f reno & basement- strengtening (e)walkway adding plywood, add 2-2x10 to extg joist | $288,000 |
| Jan 31, 2023 | Never finaled issued Jan 2023, no final | 1271 20th Av | remodel a full bathroom in kind.Details
remodel a full bathroom in kind. | $12,000 |
| Jul 25, 2022 | Never finaled issued Aug 2022, no final | 64 Lawrence Av | rev to pa202110130417: convert partial kitchen area into office. reconfigure kitchen & bar layout as per plan.Details
rev to pa202110130417: convert partial kitchen area into office. reconfigure kitchen & bar layout as per plan. | $2,000 |
| May 2, 2022 | Never finaled filed May 2022, never issued | 1482 Underwood Av | comply w/ n.o.v's 201803141, 201807171, 201806241 & 200839611: add a 150 sq ft. 1 bed w/ half bathroom in the rear.Details
comply w/ n.o.v's 201803141, 201807171, 201806241 & 200839611: add a 150 sq ft. 1 bed w/ half bathroom in the rear. | $35,000 |
| Nov 16, 2021 | Completed final sign-off Nov 2022 | 2114 Mission St | 2/f common area bathroom, remodel shower; 3/f common area bathroom, remodel shower and isntall new exhaust fan; cap an abandones exhaust duct in alleyway (clarion); replace (e) water heater in kind; replace electrical subpanel cover, located on g/f. to comply to nov202183358.Details
2/f common area bathroom, remodel shower; 3/f common area bathroom, remodel shower and isntall new exhaust fan; cap an abandones exhaust duct in alleyway (clarion); replace (e) water heater in kind; replace electrical subpanel cover, located on g/f. to comply to nov202183358. | $25,000 |
| Nov 15, 2021 | Never finaled filed Nov 2021, never issued | 2114 Mission St | work to comply with nov 202183358. 1. install bathroom exhaust fan in 3rd floor bathroom. 2. replace existing water heater. 3. remodel existing 2nd and 3rd floor showers. 4. cap an abandoned exhaust duct in alleyway. 5. replace subpanel cover with a new one located on ground floor. 6.(cont. in comm)Details
work to comply with nov 202183358. 1. install bathroom exhaust fan in 3rd floor bathroom. 2. replace existing water heater. 3. remodel existing 2nd and 3rd floor showers. 4. cap an abandoned exhaust duct in alleyway. 5. replace subpanel cover with a new one located on ground floor. 6.(cont. in comm) | $25,000 |
| Oct 13, 2021 | Never finaled issued Jan 2022, no final | 64 Lawrence Av | to comply with nov#202173806. 1st fl: legalized two bedrooms, media room & bath as per plan. 2nd fl: remodel (e) kitchen & bath, replace dry wall & installation throughtout the bldg. replace fire damaged joists/walls if needed.Details
to comply with nov#202173806. 1st fl: legalized two bedrooms, media room & bath as per plan. 2nd fl: remodel (e) kitchen & bath, replace dry wall & installation throughtout the bldg. replace fire damaged joists/walls if needed. | $80,000 |
| Sep 21, 2021 | Completed final sign-off Mar 2022 | 2631 22nd Av | remodel kitchen on the 2nd floor 130 sqft. add a new subpanel. no removal of walls. light oer cenc 150.0(k)Details
remodel kitchen on the 2nd floor 130 sqft. add a new subpanel. no removal of walls. light oer cenc 150.0(k) | $26,000 |
| Jul 20, 2021 | Completed final sign-off Jan 2022 | 3443 Taraval St | 1st fl. remodel 1 kitchen, 1 bath, new sub-panel, new windows visible from street 2nd fl. remodel 1 kithcen, 1 full bath, new sub pane, new windwos visible from streetDetails
1st fl. remodel 1 kitchen, 1 bath, new sub-panel, new windows visible from street 2nd fl. remodel 1 kithcen, 1 full bath, new sub pane, new windwos visible from street | $60,000 |
| Jun 29, 2021 | Completed final sign-off Sep 2021 | 5473 Mission St | to comply w/ nov #202178344 - repair a non bearing wall in the garage with 2x4 wood and stucco.Details
to comply w/ nov #202178344 - repair a non bearing wall in the garage with 2x4 wood and stucco. | $5,000 |
| Nov 3, 2020 | Completed final sign-off Dec 2020 | 26 Spofford St | to comply with nov#202046981. run a new wall heater vent from 2nf floor through the 3rd floor and up through the roof. build an enclosure for the new vent pipe and repair roof.Details
to comply with nov#202046981. run a new wall heater vent from 2nf floor through the 3rd floor and up through the roof. build an enclosure for the new vent pipe and repair roof. | $1,500 |
| Oct 17, 2020 | Completed final sign-off Jun 2021 | 2458 29th Av | 1st floor: add 2 bedroom & 1.5 bath with media room. 2nd floor: remodel bedroom, add 1 full bathDetails
1st floor: add 2 bedroom & 1.5 bath with media room. 2nd floor: remodel bedroom, add 1 full bath | $80,000 |
| Oct 7, 2020 | Never finaled issued Oct 2020, no final | 2458 29th Av | remodel an extg bathroom with bathtub like for like.Details
remodel an extg bathroom with bathtub like for like. | $13,500 |
| Sep 30, 2020 | Completed final sign-off Oct 2020 | 26 Spofford St | install bathroom exhaust fan at 3rd fl common restroom thru roof. no layout change, no fire alarm/sprinkler modification. comply w/ his nov 202046981.Details
install bathroom exhaust fan at 3rd fl common restroom thru roof. no layout change, no fire alarm/sprinkler modification. comply w/ his nov 202046981. | $100 |
| Jun 29, 2020 | Completed final sign-off Jan 2021 | 119 Lobos St | 1st fl: add 1 bedroom, 1 full bath, family room and office. 2nd fl: remodel bedrooms, kitchen and bathroom. add 1 full bath. infill at rearDetails
1st fl: add 1 bedroom, 1 full bath, family room and office. 2nd fl: remodel bedrooms, kitchen and bathroom. add 1 full bath. infill at rear | $50,000 |
| Jun 25, 2020 | Completed final sign-off Oct 2020 | 1874 23rd Av | remodel existing kitchen 120 sq ft in kind. no layout change.Details
remodel existing kitchen 120 sq ft in kind. no layout change. | $8,800 |
| Jun 8, 2020 | Completed final sign-off Jan 2021 | 119 Lobos St | kitchen and bathroom remodel. kitchen: new floor tiles, new cabinets, countertops, sink, faucet, range fan, light,. bathroom: new floor tiles, shower faucet, shower tiles, shower door, vanity sink, mirror, light, fan. all work in kind.Details
kitchen and bathroom remodel. kitchen: new floor tiles, new cabinets, countertops, sink, faucet, range fan, light,. bathroom: new floor tiles, shower faucet, shower tiles, shower door, vanity sink, mirror, light, fan. all work in kind. | $22,000 |
| Jan 31, 2020 | Completed final sign-off Aug 2020 | 152 Jasper Pl | remodel e kitchen and e bath, add 1 new poweder roomDetails
remodel e kitchen and e bath, add 1 new poweder room | $22,000 |
| Jan 15, 2020 | Completed final sign-off Jun 2020 | 1578 34th Av | revision to app#201909060874 to comply with complaint# 201999701. revised for retaining wall.Details
revision to app#201909060874 to comply with complaint# 201999701. revised for retaining wall. | |
| Jan 7, 2020 | Completed final sign-off Apr 2020 | 2789 35th Av | remodel one bathroom on the 2nd floor. no alteration of walls. window and door. no structural work under this permit.Details
remodel one bathroom on the 2nd floor. no alteration of walls. window and door. no structural work under this permit. | $9,000 |
| Jul 30, 2019 | Completed final sign-off Oct 2020 | 1243 Silver Av | 1) remove (e) powder room on 1/f per plan. 2) add 1 bathroom, 1 guest room and 1 laundry on 1/f per plans. maher n/a.Details
1) remove (e) powder room on 1/f per plan. 2) add 1 bathroom, 1 guest room and 1 laundry on 1/f per plans. maher n/a. | $7,000 |
| May 6, 2019 | Completed final sign-off Jan 2020 | 851 Rutland St | remodel a kitchen. no change of the floor plan.Details
remodel a kitchen. no change of the floor plan. | $13,800 |
| Apr 16, 2019 | Completed final sign-off Aug 2019 | 1654 Greenwich St | remodel kitchen at 3rd floor (100 sq ft). remodel (1) full bathroom and (1) half bathroom at 3rd floor (40 sq ft and 30 sq ft respectively). convert existing storage into laundry room at third floor. lighting per 2016 cenc 150.0(k).Details
remodel kitchen at 3rd floor (100 sq ft). remodel (1) full bathroom and (1) half bathroom at 3rd floor (40 sq ft and 30 sq ft respectively). convert existing storage into laundry room at third floor. lighting per 2016 cenc 150.0(k). | $28,000 |
| Apr 1, 2019 | Expired or cancelled cancelled May 2022 | 1482 Underwood Av | comply w/ n.o.v's 201803141, 201807171, 201806241 & 200839611. remove non-permitted rear 1-story addition & legalize (e) half bath.Details
comply w/ n.o.v's 201803141, 201807171, 201806241 & 200839611. remove non-permitted rear 1-story addition & legalize (e) half bath. | $8,000 |
| Nov 19, 2018 | Completed final sign-off Jul 2022 | 750 Judah St | demolition of interior stair and convert space to storage in ground and second floor. new subpanel. addition of new dwelling unit. new 1 hr wall to separate route to unit from garageDetails
demolition of interior stair and convert space to storage in ground and second floor. new subpanel. addition of new dwelling unit. new 1 hr wall to separate route to unit from garage | $18,000 |
| Aug 27, 2018 | Never finaled issued Feb 2019, no final | 815 Mission St | propose new tenant space to be tapioca drink. n/a for maherDetails
propose new tenant space to be tapioca drink. n/a for maher | $10,000 |
| May 21, 2018 | Completed final sign-off Sep 2018 | 479 20th Av | to comply with complaint 201859873 remodel (e) kitchen/bath rm remove partial interior wall and install beam at 3rd flr ceilingDetails
to comply with complaint 201859873 remodel (e) kitchen/bath rm remove partial interior wall and install beam at 3rd flr ceiling | $32,000 |
| Jan 9, 2018 | Completed final sign-off Jul 2019 | 647 28th Av | to comply with nov 201719881 & 201719411 2nd flr - remodel 2 (e) bathrooms and a kitchen 1st flr - add a new bedroom, a family room, 1 full bathroom and a half bath. replacing a beam at the dining roomDetails
to comply with nov 201719881 & 201719411 2nd flr - remodel 2 (e) bathrooms and a kitchen 1st flr - add a new bedroom, a family room, 1 full bathroom and a half bath. replacing a beam at the dining room | $90,000 |
| May 13, 2015 | Completed final sign-off Jun 2019 | 2340 31st Av | new kitchen area on 1st floor & legalize in-law dwelling unit (1 bedroom) under ordinance no# 43-14. add new kitchen.Details
new kitchen area on 1st floor & legalize in-law dwelling unit (1 bedroom) under ordinance no# 43-14. add new kitchen. | $6,000 |
| Oct 28, 2011 | Completed final sign-off Feb 2012 | 35 Rome St | comply with nov# 201153970-install new garage door caused by auto crash, remove kitchen at 1st floor , legalize laundry room at 1st floor . repair interior wallsDetails
comply with nov# 201153970-install new garage door caused by auto crash, remove kitchen at 1st floor , legalize laundry room at 1st floor . repair interior walls | $6,500 |
| Mar 16, 2011 | Never finaled issued Mar 2011, no final | 5026 Anza St | remodel two bathrooms, change lighting, new sheetrock, painting. no wall relocation. high efficency lighting or occupancy sensor control, r-13 wall, r-30 ceiling.Details
remodel two bathrooms, change lighting, new sheetrock, painting. no wall relocation. high efficency lighting or occupancy sensor control, r-13 wall, r-30 ceiling. | $17,000 |